PHENIX & The Beam Pipe. 1)Overview of the drawings 2)I will break down the beam pipe going from MuID-S to MuID-N piece by piece. 3)Important Information.

Slides:



Advertisements
Similar presentations
Disk and Washer Methods
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Works done in 2003 ( Minutes and presentations of the RHIC Experiment Shielding Working Group are kept at :
Seismic Improvement Program Presented to: The Northern California Earthquake Hazards Workshop February 12, 2014.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
T. Montagne LTU – Beam Dump Installation April 16, LTU and Beam Dump Installation April 16, 2007.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HFT Geometry Considerations F.Videbæk BNL. Introduction This presentation is meant to be a living document, updated as more and better information becomes.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Lesson 6 Lenz’s Law Liceo Alfano. Reminder Last time: Currents create magnetic fields, and are affected by magnetic fields Electric motors spin due to.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
BSY D10 replacement dump Proposal Dieter Walz Alev Ibrahimov March
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Central vacuum valve in ALICE Pros and Cons ALICE TC –
Structural Steel Construction
Air Powered Rocket. Rocket Body Lay two pieces of paper with their long sides over lapping Tape the paper together Roll the paper into a tube using the.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
XML Description of Beam Pipe Geometry  For XML description of Beam Pipe were used: Det/XmlDDDB/v6, Det/XmlEditor/v4, Det/DetDesk/v8, Vis/GaudiLab/head.
Pistons and piston rings
Vacuum System P. Chiggiato TE-VSC
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
Design of the Injection Can
H1 Detector Upgrade Installation
Update on He3 Services design since the ORNL meeting
General remarks about the HESR and PANDA vacuum system
Vacuum chamber for the CMS forward region
EBTF Design Review Technical Meeting Group
The IR beam pipe M. Sullivan For
Design of Distribution Feedbox at LHC P7
Challenges for FCC-ee MDI mechanical design
Hall C Down Stream Beam Pipe And Dump Interface Design
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
XFEL Collimation and Beam Switchyard Vacuum Issues
Additional Upstream Coil Shielding
LARP Phase II Secondary Collimator RC-1
SHMS Downstream Beamline
Equilibrium Of a Rigid Body.
CRYOMODULE FINAL ASSEMBLY
Bunker Wall Design Wall ESS
Single Detector Design
IR Beam Transport Status
Presentation transcript:

PHENIX & The Beam Pipe

1)Overview of the drawings 2)I will break down the beam pipe going from MuID-S to MuID-N piece by piece. 3)Important Information 4)Overview of the planned changes to the PHENIX beampipe.

PHENIX w/ focus on the beampipe This is from an Autocad drawing done by Richie and Don: 026.pdf Part F no longer exists. This was a stand used before the South Magnet was installed.

South Piston Hole Beampipe This is from an Autocad drawing done by Richie and Don. A pdf copy is available: 047.pdf Zoom-ins and explanations will follow.

North Piston Hole Beampipe This is from an Autocad drawing done by Richie and Don. A pdf copy is available: 038.pdf Zoom-ins and explanations will follow. And theres a bellows, but it doesnt have a Bellows Spreader on it. The Souths bellows spreader increases the Souths keep out zone.

South Mu ID Valve – isolates PHENIX from the rest of the ring. Close the valve, and we can break vacuum without affecting the ring. Bellows – I & 2 BPM – beam position monitor Vacuum Pump

Fixed support – no longer exists. Taken out with installation of South Magnet Sliding Beam Pipe Support Shown in Section C of 026.pdf Flange and Bellows Shown in Detail D of 026.pdf & in 047.pdf Conversion from 5 ID to 3 ID steel beam pipe South Muon Magnet

Beam pipe conversion from steel to beryllium. This is a rigid joint. I believe the transition from beryllium to steel is inside the central magnet steel Central Region

V – Shaped support : The steel beam pipe is not rigidly held here. Nor can it roll. It can scrape through the V. Flange and Bellows Conversion from 3 ID to 5 ID steel beam pipe North Muon Magnet Sliding Beam Pipe Support Shown in Section C of 026.pdf

North MuID Very similar to the South case. Valve, flanges, vacuum pump…

Important Information There must be a bellows between any two fixed points to give the beam pipe room to expand/contract in the z-direction. Fixed Point Rolling Support Bellows From 026.pdf it looks like this is a non-sliding support, positioned just before the transition to beryllium. This seems to break the rule. I will follow up with Don tomorrow. Sliding Support

Three Beam Pipes Beryllium section is rigidly connect to steel piece.

Planned Changes Both the beampipe thickness and inner diameter will be decreased. Time frame unknown, but it is connected with the Nose Cone Calorimeter upgrade. The plan is to have beryllium up to the nose cone, have a bellows there and make the transition to steel. Its difficult to tell, but it looks like the current beampipe makes the steel-beryllium transition inside the central magnet We could make the argument that we are moving the south bellows from the magnet hole to the south nose cone.

What would this give us? Bellows Spreader Diameter – 6.50 Flange Diameter – 4.62 Wed reduce the keep out zone radius by almost an inch so… wed be at the keep out zone of the North MPC… 4 5/8 The south drawings are in pdfs 043, 044, 045, 046 & 047.

Numbers Explained (i) is diameter of spreaders 5.5 is the diameter of the circle formed by the bellow spreader rods

Numbers Explained (ii) 4.62 is the flange diameter. – This would make out keep out diameter the same as the NMPC.