GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…

Slides:



Advertisements
Similar presentations
Plumbing.
Advertisements

Typical Plumbing System
ACTIVE LEARNING PROCESS
Power Plant Engineering
Fundamentals of Pressure Relief Devices
CASTING A CONCRETE WALL
Boilers Dept. of Mech & Mfg. Engg..
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
Student Book © 2004 Propane Education & Research CouncilPage Installing Steel Piping in Vapor Distribution Systems Installing steel piping.
Agricultural Mechanic and Technology Cluster
PVC Pipe Cutter Plumbing Tools And Supplies-Plumbing Tools and Supplies Image: PVC_Cutter.jpg Height: 250 Width: 250 This cutter makes smooth clean.
Buildings and Structures 2 Fixed Installations Aim To provide students with information to allow them to recognise the types of fixed fire protection.
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
Installation. Indoor Unit Installation Typical Installation.
STEAM TRAPS.
Watertube Boiler.
Gas Transmission Pipelines
External nut type series 43
Pipe Supports and Restraints
Piping network THE PIPING SYSTEMS. Compressor room Flexibles Isolating valves Bucled main ring Global piping network design Inlet and Main drain Air drops.
Effects of Thermal Energy Name: ________________ Class: _________________ Index: ________________.
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Piping Drawings.
Installation. Indoor Unit Installation Typical Installation.
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
SELECTION OF SUPPORTING ARRANGEMENT FOR CRITICAL PIPING By DILEEP PILLAI.
Mechanical for Oil Heat
Compressed Air Piping Systems by Asahi/America
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
INTRODUCTION Definition:
Installation. Indoor Unit Installation Typical Installation.
BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Plumbing Unit.
Presentation Dungrani rakesh v. Div : a Branch : mechenical Sem : 1 st.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
Plumbing Tools ˚ Pipe Elbow 45˚ Pipe Elbow Making a 45 degree turn with a pipe.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
Cochran Boiler Specification:
House Drainage System By- Prajyoti P. Upganlawar
Welcome! Drafting 2345: Advanced Pipe Drafting Andrew Amini Full Time Instructor, HCC.
PIPELINES VIJAY VADER. PROCESS PLANTS  Essentially handling liquid/gases/solids  Need to transport them from one stage to another.  Transportation.
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
ME444 ENGINEERING PIPING SYSTEM DESIGN
Pipe specials.
PLUMBING PARTS Plumbing ensures that a royal flush always beats a full house.
VALVES IN PIPE LINES.
PIPING DRAWINGS C H A P T E R T W E N T Y- O N E.
Chapter 37: Fluid Containment
Pipe Fittings.
Natural Gas Processing I Chapter 2 In-feed System
Welcome! Drafting 2345: Advanced Pipe Drafting
Plumbing.
Typical Plumbing System
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
Tracer Applications.
Effects of Thermal Energy
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Gas Transmission Pipelines
Presentation transcript:

GENERALPIPINGREQUIREMENTS:

Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…

1. ALL PIPING SHOULD RUN PARALLEL TO THE BUILDING WALLS.

-- If such piping consideration is not considered, the lay-out of pipes would be like a “MAZE” which would complicate line tracing (more so if no color coding exists) as well as repairs and alterations…. With space limitations (as in the case of ship vessels0) such type of pipe laying could no longer be prevented….

2. GROUPED PIPING SHALL BE SUPPORTED ON RACKS EITHER ON HORIZONTAL OR VERTICAL PLANES.

EXAMPLES OF PIPE SUPPORTS (RIGID):

EXAMPLES OF PIPE SUPPORTS (FLEXIBLE):

LISTING OF PIPE SUPPORTS:

3. ALL PIPING TO HEADERS SHALL COME FROM BELOW RACK.

4. ALL PIPING FROM HEADERS SHALL GO UP ABOVE RACK.

5.ALL PIPING ABOVE OR BELOW RACKS SHALL BE SUPPORTED ON SEPARATE RACKS. Separate rack for pipes located at different elevations

6.ALL PIPING SHOULD RUN WITH SLIGHT INCLINATION.

7. ALL PIPING ON RACKS SHALL HAVE A SUFFICIENT SPACING. With the right spacing, repairs/ alterations could be done in a jiffy as well as maximizing space limitations Although maze like in appearance, there are still workable spaces for repairs/ alterations

Pipes layed without proper spaces would be next to impossible to be repaired/ altered unless the whole piping system is disassembled. --Pipes layed without proper spaces would be next to impossible to be repaired/ altered unless the whole piping system is disassembled.

8. ALL PIPING 63.5MM (6.35CM) AND ABOVE SHALL BE FLANGED WHILE SMALLER ONES CAN BE SCREWED. Flanged connections Screwed connections

9. ON LONG HEADERS, A PAIR OF FLANGES SHALL BE PROVIDED FOR EVERY THREE- LENGTHS OF 6000MM OF PIPES 63.5MM AND ABOVE.

10. ON LONG HEADERS, A PAIR OF UNIONS SHALL BE PROVIDED FOR EVERY THREE- LENGTHS OF 6000MM OF PIPES SMALLER THAN 63.5MM. UNIONS PLUGS

THREADED PIPE CONNECTORS COUPLING NIPPLE UNION

11. ALL PIPING SUBJECTED TO VARYING TEMPERATURES SHALL BE PROVIDED WITH EXPANSION JOINTS OR EXPANSION LOOPS certain sections prone to thermal expansion are fixed rigidly with respect to a given foundation/ support it would likely develop THERMAL STRESS which could be a reason for failure EXPANSION JOINTS

12.NO GALVANIZED PIPING SHALL BE USED FOR STEAM APPLICATIONS.

13.NO PIPING MATERIAL SHALL BE USED THAT IS EASILY CORRODED BY MATERIAL PASSING THRU. THERMOPLASTIC PIPES/ VALVES/ FITTINGS

14. ALL PIPING SHALL BE CLAMPED BY “U- BOLTS” OR CLAMPS TO SUPPORTING RACKS EXCEPT STEAM PIPING. ALL STEAM PIPING SHALL BE SUPPORTED ON ROLLERS OR SLIDING SUPPORT. U-BOLT ROLLERS

15. PIPING SUPPORTS SHOULD BE PLACED ON A 3000MM INTERVAL OR LESS.

16. ALL PIPING CARRYING PRESSURE SHALL BE OF SUFFICIENT BURSTING STRENGTH FOR THE PRESSURE APPLIED. A MINIMUM FACTOR OF SAFETY OF 4 FOR WORKING PRESSURE APPLIED SHALL BE USED.

17. FOR CONVEYING LIQUIDS SUBJECT TO WATER HAMMER, ADDITIONAL FACTOR OF SAFETY OF 100% OF THE WORKING PRESSURE SHALL BE APPLIED. WATER HAMMER ARRESTER/ ATTENUATOR

WATER HAMMER is a phenomena that is characterized by vibration and distinct sounds within pipes when the valve controlling the fluid flow is suddenly stopped. For fluid to flow it requires force/ pressure. Once the flow is impeded, the flow crashes at the “wall” of the valve. This sends shockwaves chracterized by vibration and distinct sounds.

The end result is catastrophic depending upon the volume flow rate of fluid as well as the pipe diameter. Damaged brought about by water hammer in a hydraulic power plant. From top left; Ruptured valves to a damaged pipeline (top right and bottom)

18. ALL PIPING CARRYING STEAM, HOT WATER, OR HOT LIQUIDS SHALL BE PROPERLY INSULATED.

19. DRAINS FROM STEAM PIPING SHALL BE PROVIDED WITH STEAM TRAPS. STEAM TRAPS STEAM DRAIN

20. ON ALL SCREWED JOINTS, THE THREADED PORTION SHALL ENTER FITTINGS WITH THREE THREADS BY HAND BEFORE A PIPE WRENCH IS TO BE USED.

21. PIPE THREADS SHOULD BE LUBRICATED BY WHITE LEAD, RED LEAD, GRAPHITE, AND OIL OR OTHER APPROVED THREAD LUBRICANTS BEFORE TIGHTENING.

22. NO RUBBER OR RUBBERIZED GASKETS SHALL BE USED FOR STEAM OR OTHER HOT LIQUIDS.

23. A SHUT-OFF VALVE SHALL BE INSTALLED ON EVERY BRANCH FROM HEADERS.

24. ALL PIPING SHALL BE REASONABLY BE CLEANED BEFORE INSTALLATION.

25. ALL PIPING SHALL BE FREE FROM BURRS OR PROTRUDING METALS INSIDE.

26. NO PIPING SHALL BE IMBEDDED IN CONCRETE WALLS OR FLOORS.

27. WHERE PIPING HAS TO BE LOCATED IN TRENCHES, THE PIPES SHALL BE SUPPORTED ON STEEL BRANCHES ON FLOOR OF TRENCH.

28. WHERE PIPING HAS TO BE LOCATED IN TRENCHES, A SUITABLE DRAINAGE OR SUMP FOR REMOVAL OF LIQUID ACCUMULATIONS SHALL BE PROVIDED FOR TRENCH.

29. WHERE PIPING CARRYING STEAM OR HOT LIQUIDS HAVE TO PASS WALLS OF CONCRETE SUITABLE SLEEVES MADE OF PIPES ONE SIZE BIGGER SHALL BE IMBEDDED IN CONCRETE BEFORE THE PIPE IS LAID.

30. PIPING TO ALL EQUIPMENT SHALL NOT BE SUBJECTED TO ANY STRESS ON EQUIPMENT BEING CONNECTED.

31. PIPES CARRYING LIQUIDS WITH SOLIDS SHALL USE LONG RADIUS ELBOWS OR TEES WITH PLUGS IN THE DIRECTION OF FLOW.