Acquisition Planning March 24, 2011 Dr. Sylvia Stokes

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

2 Session Objectives Increase participant understanding of effective financial monitoring based upon risk assessments of sub-grantees Increase participant.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Module N° 7 – Introduction to SMS
OPTIONS Module Lead: OO-ALC/PKCA August 2007 Integrity ~ Service ~ Excellence War-Winning Capabilities … On Time, On Cost Air Force Materiel Command.
Small Purchases and Pricing December FAR Part 13 Simplified Acquisition Procedures Describes Policies and Procedures for acquisitions that do not.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Gaining Senior Leadership Support for Continuity of Operations
Site Safety Plans PFN ME 35B.
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Privacy Impact Assessment Future Directions TRICARE Management Activity HEALTH AFFAIRS 2009 Data Protection Seminar TMA Privacy Office.
Proper Use of GSA Contracts Emile Monette
A GUIDE TO WRITING EFFECTIVE JUSTIFICATIONS
EMS Checklist (ISO model)
ACQUISITION PLANNING.
Acquisition Planning and Adequate Market Research National Oceanic and Atmospheric Administration Acquisition and Grants Office Oversight and Compliance.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
A Roadmap to Successful Implementation Management Plans.
Effectively applying ISO9001:2000 clauses 6 and 7.
NIH RESEARCH CONTRACTS
Effective Contract Management Planning
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
CONDUCTING MARKET RESEARCH Fred Lagunas Procurement Center Representative SBA Office of Government Contracting 4 Mar 09.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Other than full and open competition, Simplified Acquisition Procedures (SAP), and Federal Supply Schedules Brendan Miller OD/OALM/OLAO/AO Operations Branch.
Functional Areas & Positions
Visual 3.1 Delegation of Authority & Management by Objectives Unit 3: Delegation of Authority & Management by Objectives.
Principles of Marketing
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Congress and Contractor Personal Conflicts of Interest May 21, 2008 Jon Etherton Etherton and Associates, Inc.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
New Employee Training Market Research
ASPEC Internal Auditor Training Version
Required Sources of Supplies and Service
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
GWAC Ordering Procedures Overview
Federal Acquisition Service U.S. General Services Administration Federal Acquisition Service: FAS Implications for Section 863 of the Duncan Hunter National.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT Alan Chvotkin Senior Vice President and Counsel Professional Services Council DEFENSE ACQUISITION.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
COMPETITION REQUIREMENTS
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Don Mansfield Professor of Contract Management Defense Acquisition University.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
FAR Part 10 Market Research. FAR Part 10 - Prescribes policies and procedures for conducting Market Research.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
The Administration’s Small Business Agenda Contract Bundling: A Strategy for Increasing Federal Contracting Opportunities for Small Business.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
12.1 Plan Procurement: Introduction
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
1 Fundamentals of Blanket Purchase Agreements Breakout Session # E03 Name: Barbara Kinosky, Esq. Date: Tuesday, July 31 st Time: 2:30 PM – 3:45 PM.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT
The Administration’s Small Business Agenda
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Small Business and Subcontracting.
A Pricing Perspective on Contract Cost/Price Analyst
Presentation transcript:

Acquisition Planning March 24, 2011 Dr. Sylvia Stokes Professor of Contract Mgt DAU South Region sylvia.stokes@dau.mil

Today’s Learning Objectives Enabling Objectives: Determine if a written acquisition plan is required. Identify the purpose of an acquisition plan. Identify the acquisition planning policy. Recognize the acquisition plan process. Determine when a written plan is required. Identify the acquisition planning roles. Identify the preparation and approval process Identify the major elements of the plan Determine how to update an existing plan as necessary. Brown Bag Mar 24, 2011

Agenda Acquisition Plans Acquisition Planning Policy Acquisition Plan Process Requiring a Written Plan Acquisition Planning Roles Preparation and Approval Process Major Elements of the Plan Update the Existing Plan as necessary Summary Brown Bag Mar 24, 2011

Purpose of Acquisition Plans Why do we need a plan?  Anticipate problems “Failing to plan is planning to fail.” It allows all participants in the planning of an acquisition to establish, logically and systematically, an approach for meeting a government need. It also provides the impetus for stakeholders interested in an acquisition to review regulatory requirements in advance. It allows participants to anticipate problems that may arise and to formulate plans to avoid them, as well as to anticipate required approvals, waivers, etc., that may be necessary. “Why do we need a plan?”   Anticipate problems It has been said that, “failing to plan is planning to fail.” Given the complexity of the acquisition business, this seems particularly true. The acquisition plan is a valuable tool because it allows all participants in the planning of an acquisition to establish, logically and systematically, an approach for meeting a government need. It also provides the impetus for stakeholders interested in an acquisition to review regulatory requirements in advance. This review process allows participants to anticipate problems that may arise and to formulate plans to avoid them, as well as to anticipate required approvals, waivers, etc., that may be necessary. Brown Bag Mar 24, 2011

Purpose of Acquisition Plans (Cont) It is used to communicate the requiring activity’s approach to higher management. Senior Leaders want to know the following: Is the plan consistent with current DoD priority policies (i.e., provide for full and open competition, use of fixed-price type contracts)?   Is the plan executable? Are the top-level objectives appropriate and in the best interest of the DoD and the United States? Most important, the plan helps to generate commitment by all stakeholders to support the plan’s execution. It serves as a permanent record of decisions made regarding the acquisition strategy for future reference. An acquisition plan is required by FAR Part 7, Acquisition Planning. Brown Bag Mar 24, 2011

Policy goals Agencies shall perform acquisition planning and conduct market research for all acquisitions in order to promote and provide for—  Acquisition of commercial items or, to the extent that commercial items suitable to meet the agency’s needs are not available, nondevelopmental items other than commercial items, to the maximum extent practicable; and Full and open competition or, when full and open competition is not required in accordance with Part 6, to obtain competition to the maximum extent practicable, with due regard to the nature of the supplies or services to be acquired; and Selection of appropriate contract type in accordance with part 16 (FAC2005-50, Effective Mar 16,2011). Planning shall integrate the efforts of all personnel responsible for significant aspects of the acquisition to ensure that the Government meets its needs in the most effective, economical, and timely manner. Brown Bag Mar 24, 2011

Responsibility of the Agency Head The agency head or a designee shall prescribe procedures to—  Promote full and open competition Encourage offerors to supply commercial items, or to the extent that commercial items suitable to meet the agency needs are not available, non-developmental items other than commercial items in response to agency solicitations. Ensure the acquisition planners address the requirement to specify the needs, develop specifications, and to solicit offers in such a manner to promote full and open competition. Ensure that acquisition planners document the file to support the selection of the contract type (FAC2005-50, Effective Mar 16,2011) Establish criteria and thresholds at which increasingly greater detail and formality in the planning process is required as the acquisition becomes more complex and costly, including for cost-reimbursement and other high-risk contracts (e.g., other than firm-fixed-price contracts) requiring a written acquisition plan. A written plan shall be prepared for cost reimbursement and other high-risk contracts other than firm-fixed-price contracts, although written plans may be required for firm-fixed-price contracts as appropriate (FAC 2005-50, Effective Mar 16,2011) Brown Bag Mar 24, 2011

Responsibility of the Agency Head Ensure that the statement of work is closely aligned with performance outcomes and cost estimates (FAC2005-50, Effective Mar 16,2011). Write plans either on a systems basis, on an individual contract basis, or on an individual order basis, depending upon the acquisition. Ensure that the principles of this subpart are used, as appropriate, for those acquisitions that do not require a written plan as well as for those that do. Designate planners for acquisitions. Review and approve acquisition plans and revisions to these plans to ensure compliance with FAR requirements. For other than firm-fixed-price contracts, ensure that the plan is approved and signed at least one level above the contracting officer (FAC2005-50, Effective Mar 16,2011). Brown Bag Mar 24, 2011

Responsibility of the Agency Head Establish criteria and thresholds at which design-to-cost and life-cycle-cost techniques will be used. Establish standard acquisition plan formats, if desired, suitable to agency needs; and Waive requirements of detail and formality, as necessary, in planning for acquisitions having compressed delivery or performance schedules because of the urgency of the need. Assure that the contracting officer, prior to contracting, reviews: The acquisition history of the supplies and services; and A description of the supplies, including, when necessary for adequate description, a picture, drawing, diagram, or other graphic representation. Ensure that agency planners include use of the metric system of measurement in proposed acquisitions. Brown Bag Mar 24, 2011

Responsibility of the Agency Head Ensure that agency planners-- Specify needs for printing and writing paper consistent with the minimum content standards, Greening the Government through Waste Prevention, Recycling, and Federal Acquisition; and Comply with the policy in regarding procurement of biobased products, products containing recovered materials, and environmentally preferable and energy-efficient products and services. Ensure that acquisition planners specify needs and develop plans, drawings, work statements, specifications, or other product descriptions that address Electronic and Information Technology Accessibility Standards in proposed acquisitions and that these standards are included in requirements planning. Brown Bag Mar 24, 2011

Responsibility of the Agency Head Make a determination, prior to issuance of a solicitation for advisory and assistance services involving the analysis and evaluation of proposals submitted in response to a solicitation, that a sufficient number of covered personnel with the training and capability to perform an evaluation and analysis of proposals submitted in response to a solicitation are not readily available within the agency or from another Federal agency. Ensure that no purchase request is initiated or contract entered into that would result in the performance of an inherently governmental function by a contractor and that all contracts or orders are adequately managed so as to ensure effective official control over contract or order performance. Ensure that knowledge gained from prior acquisitions is used to further refine requirements and acquisition strategies. For services, greater use of performance-based acquisition methods should occur for follow-on acquisitions. Ensure that acquisition planners, to the maximum extent practicable – Structure contract requirements to facilitate competition by and among small business concerns; and Avoid unnecessary and unjustified bundling that precludes small business participation as contractors. Brown Bag Mar 24, 2011

Responsibility of the Agency Head Ensure that agency planners on information technology acquisitions comply with the capital planning and investment control requirements. Ensure that agency planners on information technology acquisitions comply with the information technology security requirements in the Federal Information Security Management Act. Encourage agency planners to consider the use of a project labor agreement. Ensure that contracting officers consult the Disaster Response Registry at www.ccr.gov as a part of acquisition planning for debris removal, distribution of supplies, reconstruction, and other disaster or emergency relief activities inside the United States and outlying areas. Brown Bag Mar 24, 2011

Acquisition Planning Process Obtain procurement-related data from the requiring activity and perform market research. Is a written plan required? No Yes Proceed with the acquisition. Does an existing plan apply? Yes Update the existing plan No Prepare a new acquisition plan: Roles and responsibilities Integrated Product Teams Approval process Major elements of the plan Obtain necessary approvals Update the plan as necessary, but not less often than yearly. Brown Bag Mar 24, 2011

When is a written acquisition plan required? Written acquisition plans are required for … When estimated at … Development When the total cost of all contracts for the acquisition program is estimated at $10 million or more. Production or services* When the total cost of all contracts for the acquisition program is estimated at $50 million for all years or $25 million or more for any fiscal year. Any other acquisition An amount considered appropriate by the department or agency. Plans may be written on either a program or an individual contract basis. *Exception: Written plans are not required in acquisitions for a final buy out or one-time buy. The terms “final buy out” and “one-time buy” refer to a single contract which covers all known present and future requirements. This exception does not apply to a multiyear contract or a contract with options or phases.

Not required? Even though no written acquisition plan is required, remember that acquisition planning to maximize use of commercial items and to maximize competition is still required.

Acquisition Planning role Acquisition Planning should begin as soon as the agency need is identified, preferably well advance of the FY in which the award or order placement is necessary Brown Bag Mar 24, 2011

Roles and responsibilities Responsibility Planner - (Designated person or office responsible for developing and maintaining a written plan.) May be the Program Manager, Project Manager, IPT Lead The Program Manager or other official responsible for the program has overall responsibility for acquisition planning. Shall form the team. Review previous plans for similar acquisitions and discuss them with key personnel involved in those acquisitions. Shall review the plan and revise it, if appropriate at key dates specified in the plan or whenever significant changes occur, and no less than annually. Must rely on the expertise and input from the various functional activities involved in the acquisition process for assistance in the preparation of the plan. Shall coordinate with and secure the concurrence of the contracting officer in all acquisition planning. If the plan proposes using other than full and open competition when awarding a contract, the plan shall also be coordinated with the cognizant competition advocate. Shall coordinate the acquisition plan or strategy with the cognizant small business specialist. Shall ensure that a COR is nominated by the requirements official, and designated and authorized by the contracting officer, as early as practicable in the acquisition process. (FAC2005-50, Effective March 16, 2011)

Roles and responsibilities Responsibility Contracting officer The contracting officer must coordinate closely with the program manager to ensure the acquisition complies with statutory and regulatory requirements. The contracting officer shall designate and authorize a COR as early as practicable after the nomination. (FAC2005-50, Effective March 16, 2011) All acquisition team members The acquisition team members actively participate in the planning process by providing input in their areas of expertise, such as: budget and funding, logistics, manufacturing, engineering, fiscal and legal counsel. Requirements and logistics personnel should avoid issuing requirements on an urgent basis or with unrealistic delivery or performance schedules, since it generally restricts competition and increases prices. Early in the planning process, the planner should consult with requirements and logistics personnel who determine type, quality, quantity, and delivery requirements. Brown Bag Mar 24, 2011

Roles and responsibilities Team effort keys to success: Plan first, then document the plan.   The most effective plans are the result of a comprehensive team effort. The process of planning involves working together, proactively, to develop a good acquisition strategy with the user, the supporter, and the various functional experts assigned to the requiring activity. In addition to using the team of specialists from the requiring activity, you may be able to obtain the advice of experienced, senior managers as a forum to discuss and refine all planning issues. Generate commitment of team members Brown Bag Mar 24, 2011

Phases of the process Step 1 - Drafting determine your acquisition strategy, then document that strategy using the format and content assistance provided by your agency. Bring together your team (those who will play a part in carrying out the acquisition) to discuss the issues to be addressed in the acquisition plan.   This should be done early in the process. The table shows phases of the preparation and approval process that may be required. This process is general in nature and should be tailored as needed to satisfy local policy requirements. The estimated time to complete each phase is dependent on the complexity of the acquisition. Brown Bag Mar 24, 2011

Phases of the process Step 2 – Consultation Local procedures determine which offices (such as the competition advocate) coordinate and/or sign the acquisition plan. Your contracting activity may have developed a process to efficiently obtain the required coordination and valuable inputs to the plan. Brown Bag Mar 24, 2011

Phases of the process Step 3 – Resolution The goal of the resolution phase is to resolve all significant comments. Three possible results are: The Planner concurs with the comment and makes the recommended change. The comment may be withdrawn if the reviewer agrees with the program manager or planner’s position. The comment may be elevated for resolution by the approving authority. Brown Bag Mar 24, 2011

Phases of the process Step 4 – Local Signature The planner is responsible for adequate resolution of all comments.   The program manager or planner and the contracting officer sign and date the plan. Step 5 – External Approval External coordination with higher headquarters may be needed.   Your office may have a designated focal point for this function. Brown Bag Mar 24, 2011

Drafting the plan Start with a planning meeting to discuss major strategy issues, then begin to draft the plan. Preparing a detailed planning document will be much easier once the following major issues are resolved: What are your performance, cost, and schedule objectives? What are the user’s requirements? Have they been addressed? What are the risks of not achieving them? What contract type is appropriate given the risks? How should the end item be tested and evaluated? Brown Bag Mar 24, 2011

Rest of the plan Other major issues which must be resolved are: How will the user maintain the items? How will the user/support command keep the items operational? What kinds of data do, we the user, and the supporter need? Is there a competitive market for the effort? How can we develop/sustain competition through follow-on and support efforts? Do we need a warranty? Brown Bag Mar 24, 2011

Transition Once the major strategy issues are decided, writing the acquisition plan is more of an administrative exercise. At this point, format and completeness become the predominant themes Brown Bag Mar 24, 2011

Content of the Written Acquisition Plan According to FAR 7.105, an acquisition plan contains: The acquisition background and objectives; and a plan of action. The plan should address all the technical, business, management, and other significant considerations that control the acquisition, and identify the milestones at which decisions should be made. The specific content of plans will vary, depending on the nature, circumstances, and stage of the acquisition.  Acquisition plans for service contracts or orders must describe the strategies for implementing performance-based acquisition methods or must provide rationale for not using those met  Your agency may have a set format you must follow. If not, you can follow the outline as described in FAR. Instructor Note: Acquisition plans for service contracts or orders must describe the strategies for implementing performance-based acquisition methods or must provide rationale for not using those met Brown Bag Mar 24, 2011

Content of the Written Acquisition Plan Acquisition background and objectives -- Statement of need Applicable conditions Cost Life-cycle cost Design-to-cost Application of should-cost Capability or performance Delivery or performance-period requirements Trade-offs Risks Acquisition streamlining Brown Bag Mar 24, 2011

Content of the Written Acquisition Plan Plan of action -- Sources Competition Contract type selection (FAC2005-50) Source-selection procedures Acquisition considerations (FAC2005-50) Budgeting and funding Product or service descriptions Priorities, allocations, and allotments Contractor versus Government performance Inherently governmental functions Management information requirements Make or buy Test and evaluation Logistics consideration Government-furnished property Government-furnished information Environmental and energy conservation objectives Security considerations Contract administration Other considerations Milestones for the acquisition cycle Identification of participants in acquisition plan preparation Brown Bag Mar 24, 2011

Follow on actions After the plan is drafted and written, incorporate good ideas from the consultation phase and obtain any necessary approvals. Instructor Note: Emphasize this is a tool often overlooked. Have students share experiences.

Updates and changes Updates and changes are necessary after acquisition plan approval when significant program changes occur which exceed authority granted in the original approval. Examples include, but are not limited to changes in: contract type quantity scope or work required period of performance, or funding requirements. Brown Bag Mar 24, 2011

Updating an existing plan When conducting your initial research, analyze previous contract files for the same or similar requirements to determine whether a plan exists.   You do not need to develop a new plan if there is an existing plan that may only require a few updates.   There is no need to “reinvent the wheel” for repetitive requirements. When reviewing an existing plan, typical areas to update are: Dates Quantity(s) Set-asides Justification and Approval(s) (J&A) Market conditions Dollar amounts Source list Determination and Findings (D&F) Brown Bag Mar 24, 2011

summary Remember that acquisition planning is a team effort. It takes the active participation and expertise of the whole acquisition team to effectively plan the best course of action.   Normally, a planning meeting is the best way to begin. Plan first, then document the plan. Figuring out the big strategy issues first will make the balance of the planning easier. Active participation of all acquisition team members yields the best results. Obtain the commitment of those who have a stake in the outcome to execute the acquisition plan. Seek advice and assistance of knowledgeable senior acquisition personnel to act as consultants for your plan. Brown Bag Mar 24, 2011

references FAR Part 7 DFARS 207 PGI 207 DAU Course Material Brown Bag Mar 24, 2011