Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate.

Slides:



Advertisements
Similar presentations
Presentation on the Agreement on Import Licensing Procedures By Shashank Priya, Director, Department of Commerce.
Advertisements

© 2008 Open Grid Forum Resource Selection Services OGF22 – Boston, Feb
Presentation to Spark NH July 27, 2012 Jack Lightfoot, Child and Family Services Based on materials from NH Center for Nonprofits Alliance for Justice.
Changes in Planning Law Relating to Retention Planning Permission
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Mod 10_11 Interconnector Under Test Mod 14_11 Pumped Storage Under Test Tuesday, 5 th April 2011.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
© 2006 Open Grid Forum Network Services Interface OGF 32, Salt Lake City Guy Roberts, Inder Monga, Tomohiro Kudoh 16 th July 2011.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
T&SC Modification Proposal: Clarification of Outturn Availability
CEAA 2012 EA PROCESS OPTIONS OCTOBER 15, 2012
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
QUALITY ASSURANCE: OCCUPATIONAL QUALIFICATIONS DEVELOPMENT UPDATE AND WAY FORWARD (JUNE 2016)
Network Services Interface
SLIDES TITLE Your name Session Name, OGSA-WG #nn
I-SEM – Market Rules Working Group Meeting XII
Sebago Elementary School Withdrawal Committee
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
FP&M SETA - OCCUPATIONAL QUALIFICATIONS DEVELOPMENT
Transmission Workstream 6 January 2011
RISGE-RG use case template
TECHNICAL ASSISTANCE FUND IIB– Slovak Republic
Major Changes Additional Updates
Content of Tender Dossier - Instructions to Tenderers - Tenders
Transitional Exit Capacity Proposals -Update
Proposer: Matthew Hatch Panel Date: 20/10/16
English Arbitration Act 1996
Capacity Conversion – 616s
Grid Resource Allocation Agreement Protocol
INTERCONNECTION GUIDELINES
WS-Agreement Working Session
Taught Award Regulations
Department of Financial Services Bureau of Auditing
Contractual obligations
Code Governance Review UNC Modification Proposals
Overview of the Electricity Regulation Bill
First Collective Agreements
Information Seminar 04 December Venue: DEA Auditorium Sibusisiwe Hlela
Export Controls – Export Provisions in Research Agreements
Activity Delegation Kick Off
E-bidding for Short Term Open Access by – S
Discussion of Isolated Small Scale Electrical Power Enterprise Regulations Nay Pyi Taw, March 2018 Jakob Schmidt-Reindahl.
Curricular Practical Training (CPT) Tutorial
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
Elections 2013 Modifications Committee June / July 2013
The Necessary Criteria for a UNC Modification Proposal
Interim Suspension Delay Periods
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
TITLE PRESENTATIONDATE AUTHOR JOBTITLE.
Capacity Market Code Modifications
CUSC “Alternate” Proposal process
Introduction to OGF Standards
Overview of standards-related obligations and reporting by Mongolia
Construction Contract Administration
Capacity Market Code Modifications
CMC_05_18 Combining Candidate Units into a Capacity Market Unit
PROCEDURES FOR GRANTING OF A PETROLEUM EXPLORATION LICENCE
Export Controls – Export Provisions in Research Agreements
Capacity Market Code Modifications
Capacity Market Code Modifications
Proposed JSDL Extension: Parameter Sweeps
Correction to No Load Cost - “and” vs “or”
Project Nexus Workgroup
Capacity Market Code Modifications
Capacity Market Code Modifications
OGF 40 Grand BES/JSDL Andrew Grimshaw Genesis II/XSEDE
Slovak Republic - International Investment Bank Technical Assistance Fund
DSG Governance Group Recommendations.
Capacity Market Code Modifications
Presentation transcript:

Mod CMC_03_18 Unique circumstances may arise whereby the Transmission System Operator or Distribution System Operator requires additional time to formulate a Connection Agreement(s) or a Connection Offer(s) for a complex connection. While not expected to be a regular occurrence, a method is needed whereby extenuating circumstances can be recognised and the Candidate Unit may be allowed to participate in the Capacity Auction with agreement from the Regulatory Authorities and which can be done in a non-discriminatory manner.

Mod CMC_03_18 This Modification Proposal introduces the possibility for a Participant to apply to the RAs for proposed New Capacity to be exempt from the requirement to possess or provide a Connection Offer or Connection Agreement for the purposes of Qualification under the CMC. It introduces the following components: Option to apply for exemption Relaxation of the requirement Alternative sources of data Restoration of the requirement

Part 1: Application for Exemption Application to RAs under Exception process. Project needs to be advanced in planning and connection process. (i) evidence of ‘final grant’ of planning permission, or ‘decision to grant’ of planning permission in Ireland or notice of opinion to approve of planning permission in Northern Ireland, or evidence that planning permission already exists, or evidence that planning application has been submitted and the statutory consultation is complete or any outstanding responses are overdue; and (ii) a Connection application validated no less than 90 days before the Qualification Application Date.

Part 4: Adding to Substantial Financial Completion Part 2: Relaxation of requirement to provide Connection Offer / Agreement The requirement to provide a Connection Offer or Connection Agreement is contained in the Information required for an Application for Qualification set out in Appendix D. A clause to relax the requirement is introduced in this section. Part 4: Adding to Substantial Financial Completion The explicit requirement to have obtained any necessary Connection Agreements is introduced as part of the requirements to achieve Substantial Financial Completion.

Part 3: Alternative Sources of information Paragraph C.3.3.1 states that the Initial Capacity (Total) of a Generator Unit (other than an AGU) shall be the lesser of: its expected Registered Capacity and the Maximum Export Capacity specified in the relevant Connection Agreement and/or Connection Offer applicable to the combination of Existing Capacity and New Capacity in respect of the Capacity Year for the Initial Capacity (Total) is to be determined. As the relevant Connection Agreement / Offer applicable has not yet been issued and the Participant has been exempt from providing it, the parts relating Connection Agreements and Connection Offers no longer apply and the Initial Capacity (Total) is simply the expected Registered Capacity. *This is currently subject to a change request

End Questions?