Exit Overruns in the Enduring Regime - draft MOD principles

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Advertisements

UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Interactions with the implementation of RIIO-T1
Exit Capacity Release Methodology Statement
Exit Capacity User Commitment – Transmission Workstream update
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Capacity Methodology Statements
Mod 0452 (PARCA) – Further thoughts
PARCA Security and Termination Amounts
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
MOD Flow Swap Scenario’s – Initial Thoughts
Consideration of issues raised by UNC Modification Proposal 0244
Draft Capacity & Connection Plan
Update on Exit Capacity Substitution and Revision
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Consideration of issues raised by UNC Modification Proposal 0244
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Transmission Workstream - EU 3rd Package Update
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
Transmission Workstream 1st February 2007
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Assignment of NTS Entry Capacity – Work currently being Undertaken
Exit Overruns in the Enduring Regime
Entry Capacity Transfers - Constrained Period
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

Exit Overruns in the Enduring Regime - draft MOD principles Transmission Workstream – 5th August 2010

Background Issue was discussed at July Transmission Workstream: Highlighted an issue where repeated exit overruns could result in cumulative deemed enduring applications in excess of the Users highest historic exit overrun: Agreement reached that cumulative issue was an unintended consequence Concern at Y+4 fixed lead time National Grid to progress solution/business rules

Current deemed application rules UNC B3.2.25 “Where a User incurs an Overrun charge on a quantity greater than 100,000 kWh in any 12 month period (ending March 31st) they are deemed to have made an enduring application in the following July window (effective Y+4) for the highest overrun quantity for that User at that exit point in that 12 month period”. Note this is in addition to the overrun charge mechanism (conceptually similar to Entry)

Draft UNC MOD initial thoughts Cumulative issue addressed by: Taking into account historic chargeable exit overruns that resulted in a “deemed application” e.g. History is only taken into account where the highest exit overrun being assessed occurs prior to the lead time of the previous “deemed application” for that same User at that same Exit Point. Example follows. talk around why for 2nd bullet. i.e principle is that post lead time any overruns occurring would be measured against users capacity entitlement, inclusive of that resulting from previous deemed applications.

Draft UNC MOD initial thoughts Example:

Draft UNC MOD initial thoughts Y+4 lead time At July workstream concerns were raised around the fixed Y+4 lead time Draft MOD brings lead time principals for Deemed Enduring applications in line with “normal” enduring applications as detailed in UNC and the ExCR methodology statement (to be updated in the future to take into account deemed applications) Potentially allows early release of incremental (and unsold baseline where incremental is triggered) Also potentially provides scope to extend lead time if necessary