Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management,

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

Utility Planning Perspective For A Solar Feed In Tariff (FIT) February 3, 2009 Gainesville Regional Utilities.
Garden State Paper LLC Quarterly Report to Executive Committee and Board of Directors Q
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
The Canadian Experience with Income Trusts. Outline What are income trusts? Tax policy implications Experience in selected countries Revenue implications.
Credit Cards 101. Shopping for A Credit Card Comparison shop credit cards Dont take the first offer that comes to you: –Pre-approval Means nothing No.
Indian Institute of Management, Ahmedabad
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
Cross-Border Infrastructure: A Toolkit Financial Analysis Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed.
1 MORTGAGE SYMPOSIUM June 30, 2009 ECCB 5.30 p.m.
Power sector policies and regulations, and future plans
Credit Card Traps and PowerPay Debt Reduction Program.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
INTERNATIONAL FINANCIAL CONSULTING EGTT Workshop, September 27-29, 2004 Montreal, Canada Are Export Credit Agencies and Other Traditional Sources of Infrastructure.
CREDIT Chapter 16.
Credit. Lending Institutions Banks Mortgage Companies Finance Companies Credit Unions Insurance Companies Brokerage Companies U. S. Government Check Advance.
City of North Liberty North Liberty Area Development Corporation University of Iowa Community Credit Union Economic Development Partnership Project October.
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
CHAPTER 10: REPORTING AND ANALYZING LIABILITIES
Research Department 1 Global Economic Crisis and the Israeli Economy Herzliya conference Dr. Karnit Flug Research Director, Bank of Israel February 2009.
FI3300 Corporation Finance Spring Semester 2010 Dr. Isabel Tkatch Assistant Professor of Finance 1.
The Social & Economic Development Policy and Its Changes to the Livelihoods: A Case of Nam Theun 2 Hydropower Project 3 rd August 2011 Bounpheng Duangmala.
1 Foreign Exchange Liquidity Facilities World Economic Forum - Financing for Development Workshop Tuesday, October 26, 2004 São Paulo, Brazil.
OMV Gas Move & more. Financing the Nabucco Gas Pipeline Project Brussels, November 9th, 2006 Reinhard Mitschek OMV Gas International GmbH Head of International.
Financial Sector Review Questions
Reporting and Interpreting Owners’ Equity
Policy Design and Implement in Developing Countries Le Thu Trang (MET11305)
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
Sector Planning & Policy Issues: The Energy Sector
Hydropower Development: Experience of Nepal
NHA | ADVISORS Strategy. Innovation. Solutions. Pajaro Valley Water Management Agency Financial Review and Initial Assessment October 22, 2014.
Slide 1 Policy Alternatives to Stimulate Private Sector Investment in Domestic Alternative Fuels Wally Tyner with assistance from Dileep Birur, Justin.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
Lesson 8. 1.Estimate the amount of debt needed to achieve the firm’s goals. 2.Understanding the balance sheet and operating statements. 3.Make the needed.
CHAPTER 8 A framework for interpretation
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
DEVELOPMENT OF A REGIONAL ENERGY MARKET IN THE MEKONG AREA by Piyasvasti Amranand National Energy Policy Office, Thailand ENERGY WEEK April 1999,
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
1 Module 2 Mekong Resources, Benefits to people, and Planning Issues session 1 : The Mekong and its water resources.
Instruments of Financial Markets at Studienzentrum Genrzensee Switzerland. August 30-September 17, 2004 Course attended by: Muhammad Arif Senior Joint.
MULTILATERAL INVESTMENT GUARANTEE AGENCY WORLD BANK GROUP 1 MIGA: Managing Risk in a Challenging Environment Pristina, Kosovo, May 2013.
Project Planning and Capital Budgeting
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Financing of Infrastructure Projects:
Town Of Douglas A Review of the Town’s Proposed Tax Incentive Financing (TIF) Agreement With American Pro Wind, LLC Presented To The Douglas Finance Committee.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
FINANCIAL FINANCIAL ACCOUNTING ACCOUNTING A U s e r P e r s p e c t i v e A U s e r P e r s p e c t i v e Third Canadian Edition Third Canadian Edition.
1 Transaction Exposure Transaction exposure measures gains or losses that arise from the settlement of existing financial obligations whose terms are stated.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Hydro Power 102. Hydroelectric Models in the Northwest.
CDA COLLEGE BUS235: PRINCIPLES OF FINANCIAL ANALYSIS Lecture 10 Lecture 10 Lecturer: Kleanthis Zisimos.
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
NATIONAL LOAN GUARANTEE FUND FOR SMEs GUARANTEES OF NLGFSME – A WAY FOR FACILITATING THE ACCESS OF SMEs TO FINANCING International Forum for Investments.
Financial Markets, Instruments, and Market Makers Chapter 3 © 2003 South-Western/Thomson Learning.
(C) 2007 Prentice Hall, Inc.2-1 The Balance Sheet-Liabilities and Shareholders’ Equity “Old accountants never die; they just lose their balance” --Anonymous.
The International Financial Institutions and Nam Theun 2 International Stakeholder Workshops Bangkok, Tokyo, Paris, Washington, Vientiane 31 August-24.
Analyzing Financial Statements
El Gallo Hydroelectricity Project PDD Analysis
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Grade 12 Family Studies.  Do you have a credit card?  What is it used for?  How is it like a loan?
©2009 McGraw-Hill Ryerson Limited 1 of International Financial Management Prepared by: Michel Paquet SAIT Polytechnic ©2009 McGraw-Hill Ryerson Limited.
1. Thailand - Electricity Consumption and GDP Growth The economy grew 3.1%/yr. and electricity demand 6.5%/yr.
Erdeneburen HPP Project Implementation Unit
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
NextGen Energy Board Meeting Lending Observations Jim Jones August 30, 2007.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
Damitha Kumarasinghe Director General
Corporations: Organization, Stock Transactions, and Dividends
How Green Bonds are Mobilizing Climate Finance at Scale: the experience of the Asian Development Bank.
Presentation transcript:

Cross-Border Infrastructure: A Toolkit Project Finance Structuring: Case Study - Nam Theun 2 Session on Finance Sidharth Sinha Indian Institute of Management, Ahmedabad The views expressed here are those of the presenter and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Directors, or the governments they represent.

Cross-Border Infrastructure: A Toolkit Project History 1970s - Mekong secretariat identified the hydropower potential of the Nam Theun River 1989/91 - World Bank feasibility study undertaken by Snowy Mountains Engineering Corp Government of Lao PDR (GOL) and private sponsors (leader: Transfield) sign an agreement to develop the project GOL asks World Bank to participate to the project financing A first series of environmental and social safeguard documents is produced 1997/98 - Asian crisis: Laos and Thailand agree to delay the project development EGAT and NTPC (leader: EDF) agree on a proposed electricity tariff (May 2000)

Cross-Border Infrastructure: A Toolkit Project History ( continued ) Shareholders agreement signed between EDFI, EDL, EGCO and ITD (September 2001) NTPC is created as a Lao company (September 2002) Concession agreement signed (October 2002) Joint work between GOL, World Bank and NTPC to finalize safeguards documents Power purchase agreement signed (November 2003) Project financing activities Completion of safeguards documents with the participation of WB, ADB and AFD Financial close (June 2005) and beginning of full construction activities Beginning of commercial operation (December 2009)

Cross-Border Infrastructure: A Toolkit Schematic Diagram

Cross-Border Infrastructure: A Toolkit Project Details The development, construction, and operation of a 1,070 MW transbasin diversion power plant on the Nam Theun, a tributary of the Mekong. The project site is in the central provinces of Khammuane and Bolikhamxay, about 250 kilometers southeast of Vientiane, and stretches from the top of the annamite mountain chain along the Lao PDR-Viet Nam border, to the Nakai Plateau, and ultimately to the confluence of the lower Xe Bang Fai with the Mekong. It will capture the flow of water from the watershed of the Nam Theun and the Nakai Plateau by building a dam 39 meters (m) high at the northwestern end of the plateau.

Cross-Border Infrastructure: A Toolkit Project Details ( continued ) The project will create a reservoir of 450 square kilometers (km2) on the Nakai Plateau. Water from the reservoir will drop about 350 meters to a powerhouse at the base of the Nakai escarpment near the town of Gnommalat. The water discharged from the powerhouse will then flow through a 27 km channel to the Xe Bang Fai, which drains into the Mekong approximately 150 km south of the Nam Theun confluence. A regulating pond will be constructed downstream of the powerhouse to ensure smooth release of water into the downstream water courses.

Cross-Border Infrastructure: A Toolkit Sponsors Franco-Lao-Thai partnership with multilateral support Nam Theun 2 Power Company Limited (NTPC) is a Lao company established in Sept 2002 with the following shareholders: 35% EDF International (EDFI) 25% Electricity Generating Public Company Limited (ECGO) 25% Government of the Lao PDR (GOL) 15% Italian-Thai Development Public Company Limited (ITD) EDF is also acting as head contractor, managing three civil work subcontracts and two electromechanical works subcontracts.

Cross-Border Infrastructure: A Toolkit Contractual Arrangements Concession agreement signed between GOL and NTPC on 3 October 2002 for a 25 year period following the beginning of commercial operation Power purchase agreements signed on 11 November 2003 for a 25 year operating period between EGAT and NTPC (5,600 GWh per year), between EDL and NTPC (300 GWh per year).

Cross-Border Infrastructure: A Toolkit Contractual Arrangements ( continued ) Head construction contract between NTPC and EDF- CIH provides for a date certain, fixed-price turnkey contract and comprises five major sub-contracts NTPC will take full responsibility for O&M for the project All environment and social commitments described in the concession agreement: Long term Binding E&S : ~ 10% of total project costs

Cross-Border Infrastructure: A Toolkit

Summary of Project Base Cost Estimates ($ million)

Cross-Border Infrastructure: A Toolkit Project Capital Structure

Cross-Border Infrastructure: A Toolkit Financing Plan

Cross-Border Infrastructure: A Toolkit Exchange Rate Risk Debt and equity are denominated in a mix of dollars (63%) and baht (37%) to match the composition of the two currencies in project base costs. The 50/50 mix of US dollar and baht debt is designed to match the tariff paid by EGAT and EdL. EGAT and EdL will carry exchange rate risk. To the extent the Lao PDR government will receive royalty and taxes in dollars some of the risk will be mitigated.

Cross-Border Infrastructure: A Toolkit Hydrology Risk Historic Flow Records

Cross-Border Infrastructure: A Toolkit Hydrology Risk The annual inflows have varied historically, on average, by approximately 20 percent from the long-term average of 7,526 million m3. This is almost double the capacity of the reservoir, so that in an average year, the reservoir should be fully replenished even after operating the plant at full capacity during the dry season. The minimum water flow recorded was 3,776 million m3 in This was the result of El Nino that brought droughts over much of Southeast Asia.

Cross-Border Infrastructure: A Toolkit Hydrology Risk ( continued ) The reservoirs probable maximum capacity is 3,910 million m3 amounting to an annual mean energy of 5,700 GWh would have been the only year since 1950 when the flow would not have been sufficient to fill the reservoir from empty. However, as the reservoir will not be fully emptied during operations but will always retain a minimum water level, even in 1998 the reservoirs probable maximum active storage of 3,530 million m3 could have been filled by the water inflows

Cross-Border Infrastructure: A Toolkit At full supply level (FSL) at an elevation of m, the reservoir would have an area of 450 sq km and would hold 3,910 million cubic meters of water. The powerhouse would have an installed capacity of 1,070 MW. Annual energy generation of 5,462 GWh.

Cross-Border Infrastructure: A Toolkit

Declarations NTPC makes periodic declarations to EGAT. Declarations contain information as to the energy availability which may be provided by NTPC. Declarations serve two main functions: to determine the amount of NTPCs revenues payable by EGAT; and to determine the amount of liquidated damages payable by NTPC to EGAT. Any unavailability reduces the revenues payable by EGAT, whilst any outage results in liquidated damages payable by NTPC

Cross-Border Infrastructure: A Toolkit Dispatch EGAT has the flexibility to dispatch NTPC on a unit by unit basis as it requires, subject only to certain operational constraints. As EGAT is not required to dispatch all of NTPCs declaration, if it dispatches less, dispatch shortfall occurs. As EGAT would have paid NTPC based on all of that declaration, it has the right to make-up subsequently, i.e. the right to dispatch for electrical energy without incurring any additional payment obligation. Dispatch excess: EGAT may dispatch more than all of NTPCs declaration, subject to the limitations to be observed by EGAT in NTPCs declarations

Cross-Border Infrastructure: A Toolkit Excess Dispatch An excess energy month is: any month in which there is spillage of water from the reservoir; August or September and the water level is above m ASL on the last day of the preceding month; or as elected by NTPC. Increased risk of spillage during an excess energy month. All the dispatch excess energy as determined at the end of an excess energy month shall be accounted as SE2, provided, however, that the outstanding amount of accumulated dispatch shortfall energy is below 200 GWh.

Cross-Border Infrastructure: A Toolkit

Offtake Risk Thailand now has surplus generating capacity, because of the economic downturn in the late 1990s and the large amount of capacity that was then under development and could not be stopped on reasonable terms. On the basis of demand forecast, excluding new plant from end-2003, the capacity surplus will be consumed by By the time of NT2 COD, the project will supply about one-half year of energy demand growth. NT2 would provide about 6 percent of the incremental energy requirement over 2009 to 2016.

Cross-Border Infrastructure: A Toolkit Offtake Risk

Cross-Border Infrastructure: A Toolkit

Graph shows comparative economic costs for the most prominent large-scale generation options available to Thailand. A screening curve shows the cost per kWh of a generation plant at a range of capacity utilization rates (or CU rates). While CCGT has a lower investment cost per kW of capacity than does NT2, it has variable operating and fuels costs that NT2 does not have. At CU rates above 30 percent, NT2 is the least-cost alternative for Thailand.

Cross-Border Infrastructure: A Toolkit Liquidity Risk The debt has to be repaid within 15 years - much less than the life of the project. The royalty and tax rates to be applied in each year have been designed specifically for the project on the basis of NTPCs debt repayment schedule. NTPC is exempt from income tax over the 2009–2014 period and then pays the following the rates over the remainder of the concession; 5.0% between 2015 and 2021, 15.0% between 2022 and 2027, and 30.0% between 2028 and 2034.

Cross-Border Infrastructure: A Toolkit Liquidity Risk The royalty and tax rates...( continued ) The increase in the income tax rate from 5.0% to 15.0% is not implemented until immediately after all NTPC debt is repaid at the end of The royalty is applied at 5.2% between 2009 and 2024, 15.0% between 2025 and 2029, and 30.0% over the remainder of the concession.

Cross-Border Infrastructure: A Toolkit Country Risk Loans are guaranteed by World Bank, ADB Export Credit Agencies Development agencies loans Only THB loan not guaranteed