David Shand PFM Consultant IMF Workshop, Almaty, Kazakhstan

Slides:



Advertisements
Similar presentations
Mutual accountability and aid transparency Mutual accountability and aid transparency Republic of Moldova 1IATI meeting, OECD Conference center.
Advertisements

Mutual Accountability and Aid Transparency - Rwanda – IATI Partner Country Meeting, 4th July 2011 Paris, France Ronald NKUSI Director, External Finance.
The Hungarian Budget Review Daniel Bergvall and Ian Hawkesworth Budgeting and Public Expenditures Division.
Poverty Reduction Strategies: A tool for implementing the BPOA Linda Van Gelder The World Bank.
Improving Budgetary Outcomes
1 The PEFA Program – and the PFM Performance Measurement Framework Washington DC, May 1, 2008 Bill Dorotinsky IMF.
EuropeAid Entry points and models for parliamentary development EC support to governance in partner countries – with a focus on the African continent –
Environment & national PRSs - directions and dilemmas EPD Seminar Series May 2002.
Session 1 UK Department of International Development.
1 Session 3: Aid instruments and the PRSP Finnish Aid in a PRS Context Helsinki Workshop May 2003.
Challenging the Budget Creating Incentives for Results Rwandas Experience Elias Baingana - Budget Director.
Linkages Between NPoA and MTEF
International Monetary Fund Fiscal Affairs Department Holger van Eden
MEDIUM-TERM BUDGETING LESSONS FROM OTHER REGIONS The World Bank Pacific Department 1.
Strategic Financial Management 9 February 2012
Introduction to Program Budgeting Katherine Barraclough Consultant, World Bank Fiscal Management Reform Workshop, Istanbul, Turkey, June 6-8, 2005.
Budget Execution; Key Issues
THE PERSPECTIVE FROM THE SECTORS What would Sectors/Line Ministries (LMs) want from an MTEF? What would Sectors/Line Ministries (LMs) want from an MTEF?
Rollout of Programme Budgeting in Armenia: Experience from the DFID-led project Mark Worledge and Suren Poghosyan February 2009.
Introduction to MTEF in Korea Doyoung Min The World Bank.
MTEF and performance budgeting
Financial Reforms and Accountability in Albania Presented by Dr. Sherefedin Shehu MP, Budget & Finance Committee, Albania International Symposium on the.
The Medium Term Expenditure Framework
1.1 PFM objectives and budgetary approaches
Liberia – Duke University Program PFM reform strategy Duncan Last Public Financial Management Division March 4, 2011.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Public Finance Reform in Slovakia Roland Clarke World Bank Ministry of Finance Slovak Republic September 6, 2005.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
The MTEF in Practice - Reconciling Conflicting Claims Malcolm Holmes.
Focusing and integration PEM reforms to ensure they ‘matter’ Bank work in Armenia, 2005 Matthew Andrews ECSPE.
MKUKUTA/PER Consultations 2007 DPG session MKUKUTA/PEFAR 22 May.
Moving PFM reforms forward: A Strengthened Approach PEM reforms in PRSP countries from Europe and Central Asia Warsaw, February 6-9, 2005 David Biggs DFID.
A Preliminary Review of the MTEF Experience in Africa Philippe Le Houerou Rob Taliercio AFTM1.
INDONESIA BUDGET REFORM (Priorities and Challenges) International Conference Budgeting for Performance-Modernizing PFM in Indonesia May , Hotel.
INTRODUCTION TO PUBLIC FINANCE MANAGEMENT (PFM) Module 1.1 Definitions, objectives of PFM and its context.
1 Joint Donor Staff Training Activity Tanzania, June 2002 Partnership for Poverty Reduction Module 4 - Links between PRSP, Sector Programmes and.
A short introduction to the Strengthened Approach to supporting PFM reforms.
INTRODUCTION TO PUBLIC FINANCE MANAGEMENT Module 2.3 :MTEF and other special issues 1.
Information Flow For MTEF Operation and its implication to the Korean Government March, 19, 2004 Seoul, Korea Junghun Cho World Bank.
MTEF and links to annual budgets Osten Chulu Economist – UNDP Lesotho.
Selected Issues in PRSP Implementation The World Bank and The IMF Thessaloniki May 28, 2005.
Collaborative Africa Budget Reform Seminar Budget Reform in Mauritius
ADE’s 25 th anniversary Economic Governance: Key to Development ? Introduction Bruxelles – Bibliothèque Solvay – 5 October 2015.
1 Highlights of Gaps in the Preparation of MTBF/MTFF/MTEF Governments in Africa introduced: The Medium Term Budget/Fiscal/Expenditure Frameworks (MTBF,
1 Public Finance Management Reform The Georgian Experience 2008 ICGFM Winter Conference December, 2008.
1 Budget Execution Course – Opening Session 3 November, 2003 Overview Comments by David Shand OPCFM.
An Overview of Medium Term Expenditure Framework © July 2016 BUDGET OFFICE OF THE FEDERATION - TRAINING WORKSHOP MODULE 03: OVERVIEW OF MEDIUM TERM EXPENDITURE.
Budget Reform in OECD and Asian Countries
Introduction to Program Budgeting
PUBLIC EXPENDITURE REVIEW CLINIC FOR BENIN 13 December, 1999
Report on Pilot Questionnaire Results
Budget Formulation: good practices
Linking Public Expenditure work with Bank instruments: PRSPs and JSAs
MEDIUM TERM EXPENDITURE FRAMEWORK
Medium-Term Expenditure Framework: Lessons
Linkages Between NPoA and MTEF
Budget Formulation: good practices
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
The role of the Passport Indicators in Monitoring PFM Strategy
Budget Execution Course – Opening Session
Medium Term Expenditure Framework: What is it?
Progress in reforming budget elaboration process
Improving Budget Preparation in KR
PEFA 2016 Slides selected from the training materials of the PEFA secretariat.
MTEFs :objectives and preconditions
Finding A Common Scale: An Overview of PFM Performance Indicators
MTEF Lessons of Experience:
Linking planning, policy and budgets : experience with MTEFs
Making Budget Reform Matter for the Poverty Reduction
Challenging the Budget :- Creating incentives and driving for results
Presentation transcript:

International Experience and Best Practice in Implementing Medium Term Expenditure Frameworks David Shand PFM Consultant IMF Workshop, Almaty, Kazakhstan 26-27 May, 2011

Objectives of MTEF Aggregate fiscal discipline – spending is sustainable and limited by resource availability Budget allocations reflect explicit spending priorities (allocative efficiency) Delivery of goods and services is cost-efficient Also greater transparency and accountability of public finances Including greater involvement of sector ministries in the whole budget process And better linking of the budget with national planning mechanisms These three main PFM objectives are closely linked Traditional (one year, incremental budgeting) typically does not reliably meet these objectives The MTEF exercise is thus the budget exercise – not something separate It must change the annual budget exercise

Other introductory comments Many misconceptions about the nature of an MTEF – are we over-engineering simple concepts ? The simple issue is that expenditure decisions have multi-year implications and must be aligned with resources available in the medium-term In other words medium-term budget planning The record in MTEF implementation is uneven – some successes and some failures Perhaps reflecting misconceptions and confusion Some countries have the MTEF form but not the substance – for display rather than fiscal decision making Unrealistic MTEFs can be used to hide or defer fiscal issues But World Bank research suggests that overall the impact of MTEFs has been positive Most MTEFs extend over 3 years, but some 4 and 5 years

Brief History First formally and transparently introduced in Australia in mid 1980s, (building on a previous forward budget estimates system not clearly linked with the annual budgetary process) Leading to published three year indicative (but relatively firm) budget allocations for all ministries Then adopted by many OECD countries in 1980s and 1990s – Denmark, Netherlands, New Zealand, Norway etc) IMF a strong supporter of MTEF in developed countries Then MTEF developed in many developing countries (starting in Africa) as a key PFM reform component Often at donor (IMF and World Bank) urging to ensure commitment of resources to Poverty Reduction Strategies (PRSPs) By 2008 more than 100 countries had adopted elements of MTEF

Major MTEF Components Medium term macro-fiscal forecasts These forecasts are used to develop a medium-term macro-fiscal plan Realism of this plans is key – reflected in credibility of the budget and budget projections Sector strategies are developed and inform the allocation of resources to, but in particular within, expenditure sectors This means a focus on performance issues The budget may be a medium term budget with formal medium term budget allocations (Russia) Or (more commonly) an annual budget prepared within a medium-term framework (fiscal plan) with indicative expenditure medium-term expenditure allocations (Australia, New Zealand) How “firm” these medium term allocations can or should be is a matter of debate

Statements and Research on MTEF PEFA 2005, Indicator on Multi-Year perspective in fiscal planning, expenditure policy and budgeting - preparation of multi-year fiscal forecasts and allocations of funds by function or program - scope and frequency of debt sustainability analysis - existence of sector strategies with multi-year costing of recurrent and investment expenditures - linkages between investment budgets and forward expenditure estimates IMF Manual on Fiscal Transparency 2001 and Code of Good Practices on Fiscal Transparency (updated) refer to - aggregate fiscal projections 5-10 years ahead should be included in budget documentation - and forecasts two years ahead in the annual budget document - need for fiscal sustainability analysis - relevance of medium-term budget frameworks broken down by spending ministries

Statements and Research on MTEFs World Bank PEM Handbook 1998 – MTEF facilitates better control of expenditure and better value for money within a hard budget constraint Leherou and Taliercio (World Bank 2002) study of MTEFs in 13 African countries questioned feasibility of “fully fledged” MTEFs in many countries and noted lack of attention to institutional aspects But overlooked the issue that MTEFs cannot be expected to work if the annual budget process does not work Holmes and Evans (ODI 2003) conclude more optimistically that MTEFs are progressing, even if unevenly New World Bank research 2011based on econometric and case study analysis – see later slides

Possible MTEF Phases Medium-term fiscal framework (MTFF)- the macro-fiscal basis for budget formulation Medium-term budgetary framework (MTBF) – specifies sector ministry expenditure ceilings based on top-down MTFF and bottom up sector strategies Medium term Program/Performance Framework (MTPF) –specifies program/agency inputs, outputs and outcomes Introduction normally follows this sequence But it is possible to have selective MTBF based on sector strategies before an MTFF But MTPF first requires sector strategies In effect getting to an MTPF means a performance based budgeting system In 2008 71 country MTFFs, 42 MTBFs and 19 MTPFs

Macro-fiscal framework A key component of annual budget documentation Importance of sound technical/professional skills in macro-economic forecasting And budget revenue and expenditure forecasting Not influenced by “political” considerations Ensuring realism – with a tinge of conservatism (?) Note that this is also relevant to input oriented annual budgeting Various institutional arrangements may assist this - Independent fiscal forecasting units (Austria, Chile) - review by independent fiscal councils (Sweden, Romania) - independent role of civil servants in the forecasts (New Zealand, Australia) Fiscal risk analysis is an important component In principle this framework should be developed and owned by the Government In practice the framework by be developed by donors due to country capacity constraints

Macro-Fiscal Framework Many developing countries have formal national planning systems but only loosely linked with macro-economic forecasts Lack of realism and prioritization in these national plans may be a problem Debt sustainability analysis is part of the framework Contingency margins and rolling over of plans, frequency of updating ? Coverage - a comprehensive budget is needed. What about sub-national governments Fiscal Responsibility Laws which require medium-term fiscal targets, will assist Forecast of spending under existing policy may be the starting point in fiscal analysis But forecasts must be translated into plans Some countries have published macro-fiscal targets but no plan of how to achieve them In part this is an issue of what level of detail/aggregation to specify the framework

Sector Strategies World Bank has promoted these as part of Public Expenditure Reviews and MTEF In principle provide an opportunity for input (voice) by sector ministries And for greater predictability of funding for sector ministries The problem is to develop a results mind set Then achieving realism and sensible prioritization (this problem is not confined to developing countries) Do sector ministries actually know what they are doing , what is “policy” and what is happening? Need for sound ex ante definition of the issues based on reasonable data Sound cost information is required – consistency between MOF and sector ministry figures is part of this Need for regular reviews/evaluation of performance under the strategies

Sector Strategies Is there capacity to do all this in MOF – quite apart from sector ministries Planning ministries may often play a key role - must link with the national planning system, including any Public Investment Program (PIP) National plans usually contain major elements of sector strategies And with related strategies such as PRSP And having a fiscal envelope allocated by MOF - both recurrent and capital expenditures Note that there may a legitimate role for sector strategies as “fundraising” documents in discussion with donors Often with a strong emphasis on funding investment expenditures In principle sector strategies should be government owned (MOF and sector ministries) and donor supported In practice they may be donor driven And reflect lack of donor coordination (e.g. multiple, competing strategies for the same sector)

Linking the Macro-Fiscal Framework with Sector Strategies MOF budget circular to spending ministries outlines basis on which they should prepare their medium-term budget requests Circular indicates indicative resource availability through ceilings and indicates economic and other assumptions to be used Bids outside the ceiling will be returned to spending ministries for revision But this does not start from scratch – the following year’s expenditure from the MTEF is rolled over as the starting point In this sense an MTEF is always “incremental” Rules for bidding for new policies or quality improvements to existing ones (based on proposed changes in sector strategies) are set out “Indicative” ceilings for future years also to be determined How “firm” are these indicative ceilings ?

World Bank Study 2011 Investigates the effect of each MTEF phase on achieving the 3 objectives (fiscal discipline, allocative efficiency and operational efficiency) Uses 10 country case studies What initial economic political and other conditions determine the success of MTEFs? Are there key country, PFM and MTEF characteristics critical for success? How should implementation be sequenced and coordinated with other budget reforms? What role should Bank, bilateral donors and other international agencies play? If MTEF is not the solution, then what is?

World Bank Study 2011 Is an MTEF always appropriate, given different country circumstances? What has worked and not worked in MTEF implementation? What design features are likely to result in an MTEF? How to strengthen or reform existing MTEFs? Econometric analysis suggests - MTEFs improve fiscal discipline and allocative efficiency - results on operational efficiency are mixed – MTPF is more significant here Case study analysis suggests - MTEF has made budgeting more strategic - has improved fiscal discipline - has increased recognition of resource constraints - has fostered cooperation between agencies

Common Problems in MTEF Development Lack of data MOF and line ministries not prepared for new roles (skills and incentives) Lack of high level political support for clearer spending choices MTEF system too complex and paper intensive Misconceptions about what an MTEF is – e.g. multi-year estimates only, just a technical MOF exercise Not linked with the annual budget – but a separate exercise, so budget behavior is not changed Not linked with national plans, PRSPs etc No evaluation of performance against plan

Common Problems in MTEF Development Resource envelopes may be over-estimated and ceilings may be ignored by sector ministries That is a hard budget constraint is not achieved or enforced Sector strategies may be pro-forma exercises And not adequately costed MTPF contains too many performance indicators of dubious quality And they are not used in decision making processes This is a general issue in all performance management initiatives