Capacity Planning.

Slides:



Advertisements
Similar presentations
Capacity Planning For Products and Services
Advertisements

Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
CAPACITY LOAD OUTPUT.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
DOM 102: Principles of Operations Management Operations Scheduling
WEEK 05A – CAPACITY PLANNING AND CONTROL (CHAPTER 7S) Definitions, capacity measurement, MRP II and capacity, utilization, efficiency, breakeven SJSU Bus.
Rev. 11/30/03SJSU Bus David Bentley1 Chapter 5 – Capacity Planning and Control Definitions, capacity measurement, MRP II and capacity, utilization,
Perencanaan Kapasitas Produksi
Chapter 5 – Capacity Planning and Control
Ch 3 Manufacturing Models and Metrics
Facilities and Aggregate Planning. Overview As you know there are 24 hours a day, 7 days a week. What can you get done in a week period? Firms need to.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Production and Service Systems Operations
Production Activity Control
Production Planning and Control Introduction
Production planning and control is the organization and planning of the manufacturing process. It co-ordinates supply and movement of materials and labor,
SchedulingProducingControllingSchedulingProducingControlling.
Topic on Production and Cost Functions and Their Estimation.
Capacity Requirements Planning (CRP). Capacity requirements planning (CRP) “A computerized system that projects the load from a given Material Requirements.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
Production Activity Control
Resource Requirements Planning:
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 12a Resource Requirements Planning: MRP and CRP.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
SchedulingProducingControllingSchedulingProducingControlling.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Activity Scheduling and Control
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Production Planning and Scheduling. Production Planning Also Known as Aggregate Planning Problem in Game: Set Production Every Period, Allocate Resources,
Part 1 Study Unit 7 Review Jim Clemons, CMA.
SchedulingProducingControllingSchedulingProducingControlling.
Basics of Supply Chain Management
Material Requirements Planning (MRP)
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
AXUG Partner Showcase – Introducing Preactor
FDFPLSCP4A Manage and schedule production
Strategic Capacity Management
Facility Inventory Old Facilities Modern Facilities Classroom Size
COMPUTER INTEGRATED MANUFACTURING
Chapter 14 Aggregate Planning.
Analytical Tools for Process Analysis and Improvement
Warm-Up Draw a correctly-labeled firm in monopolistic competition in long-run equilibrium. Mark the equilibrium P and Q for both monopolistic and perfect.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Introduction to Materials Management
Capacity Planning.
Chapter 7 Capacity Planning and Management
Manufacturing Planning and Control
Outline Questions? Quiz on Thursday Any Questions on MRP Records?
Capacity Planning For Products and Services
Capacity Planning.
Capacity Planning For Products and Services
Operations Management Capacity Design
OUTLINE Questions? Quiz Results New homework MRP Capacity.
Manufacturing Production Planning
Capacity Planning For Products and Services
Incorporating lot sizing into MRP
Production and Operations Management
Capacity Planning For Products and Services
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

Capacity Planning

Capacity Capacity is the amount of work that can be done in specified time period Capacity is a rate of work done, not quantity of work done Two types of capacity: (1) capacity required or load and (2) capacity available

Diagram of Capacity

What Makes Up Capacity Facility Machines Labor Force Hours of Working Time (Shifts, Overtime) Vendors (Materials)

Capacity Planning Determine capacity available at each work center in each time period Determine the load at each work center in each time period Translate MRP or MPS into hours of work required at each work center in each time period Sum up capacities for different items on each work center Resolve differences between available capacity and required capacity

Capacity Inputs Open Order File MRP (or MPS) Routing File Work Center File

Determining Capacity Available A work center consists of 4 machines and is operated 8 hours per day for 5 days a week. Utilization (1-idle time) is 85% and labor efficiency is 110%. Available time = (4)(8)(5) = 160 hours Rated capacity = (160)(.85)(1.1) = 149.6 standard hours

You Do One Work Days = 5 Number of 8-Hour Shifts = 2 Number of Machines = 2 Labor Efficiency = .7 Machines Efficiency = .7 ?? Standard Hours ??

Determining Capacity Required or Load A work center processes 150 units of item Z. Set up is 1.5 hours and runtime is 0.2 hours per item. Efficiency is 120% and utilization is 80%. Standard time is 1.5 + (150)(0.2) = 31.5 standard hours Actual time is 31.5 / (1.2)(0.8) = 32.8 hours

You Do One Units of Item X = 300 Set Up = 2 Hours Run Time = .3 Hours per Item ?? Standard Hours ??

Comparing Load with Capacity Available Be consistent with times, either all standard or actual Example of work center load report: Week 20 21 22 23 24 Total Released Load 51.5 45 30 25 181.5 Planned Load 100.5 120 100 90 510.5 Total Load 152 165 130 125 692 Rated Capacity 140 700 (Over)/Under (12) (25) 10 15 8

Correcting Capacity Problems Short Term: Control Capacity Overtime Outsourcing Alternate Routings Flexible Work Force Reschedule (Expedite) Overlap Lot Splitting

Correcting Capacity Problems Medium Term: Plan Capacity Make/Buy Decisions Plan Alternate Routings Add Tooling Retrain Work Force Long Term: Model Capacity Facility Changes Capital Equipment Changes