Financial Rules. Reference documents to be consulted regularly: Grant Agreement Consortium agreement Guidelines for the use of the grant Frequently Asked.

Slides:



Advertisements
Similar presentations
Learning and development - consultancy - research European Institute of Public Administration - Institut européen dadministration publique © EIPA, January.
Advertisements

DG Justice Financial Analysis FRC Kick-off meeting.
INTERREG and Tacis budgets Main differences: No breakdown of the Tacis budget between the partners is required; No strict limits for the project management.
LEONARDO DA VINCI Transfer of Innovation Sofia Vocational Training for Sports Centres Employees with European Certificate Project no BG1-LEOO
SECTOR SKILLS ALLIANCES TOURISM AND CATERING GRANT AGREEMENT NO. EAC PRESENTED BY DR SHYAM PATIAR.
1 MW - Sonet Partners virtual session 12 th of October, 2009 Financial Issues.
Financial management of projects funded under the TEMPUS programme Experience of WEBIN  TEMPUS TEACH kick off meeting  February 2014  Vrsac, SERBIA.
1 Financial Procedures in FP7 Projects Reporting and Audits Karolina Lis Research Assistant DCU, Finance Office
Culture2000 Programme Presentation of the application’s budget and interim/final report.
GRIP- IT Governance of Regionally Integrated Projects using Innovative Tools. (Structural Funds implementation in an integrated approach )EXPENDITURES.
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
Workshop Financial Rules Tempus project representatives’ meeting Antwerp 6-7 December 2010.
GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES.
Contractors’ Day, June 2008 to the Framework Partnership Agreement & the Specific Grant Agreement Financial Guidelines for co-ordinators and co-partners.
European Found Accounting Women in the main deck.
Vilte Gridasova, Alina Ivanovaite Project Meeting 3 Cyprus Sep 2007 FINANCIAL AND ADMINISTRATIVE REQUIREMENTS FOR THE INTERIM REPORT.
LIFE Platform meeting Denmark 2008 Tommy Sejersen, Financial Desks EC DG ENV – LIFE Unit Telephone
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Financial, Reporting and Practical issues Per Mogensen, DASTI.
1 Master program in Educational Leadership (EdLead)
Some figures about Disabled People in Turkey Financial Rules Asist. Prof. Mahmut Geyik.
SOCRATES PROGRAMME ADMINISTRATIVE AND FINANCIAL HANDBOOK FOR BENEFICIARIES Selection 2005.
Enhancing Mobility of the Croatian Academic Community M O B I L SCM-C018B Administrative Details and Contractual Issues European Project Center.
«Tempus IV implementation: coordination, management, reporting» Anastasia Akhramovich Deputy head of International Department Omsk State Medical Academy.
OSSCOM Partnership with Enterprises Towards Building Open Source Software Communities and Rejuvenation of Technical Education and Innovation Nadine Kutz,
DAPHNE II Programme An investigation into forms of peer-peer bullying at school in pre-adolescent and adolescent groups: new instruments and preventing.
Kick-off Meeting INT COMP, ViennaSeite 1 LEONARDO DA VINCI Information on Administrative & Financial Issues PROCEDURE B LEONARDO DA VINCI.
J. VRETTAROS DEDALOS PROJECT DEDALOS st meeting ATHENS 5 ST JUNE NCSR DEMOKRITOS LEONARDO DA VINCI II ADMINISTRATION AND FINANCE.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
TEMPUS ME-TEMPUS-JPHES “IMPROVEMENT OF PARTNERSHIP WITH ENTERPISES BY ENHENCEMENT OF A REGIONAL QUALITY MANAGEMENT POTENTIALS IN WBC” Project.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Management and Financial Issues NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project.
Ramo Šendelj Dean of Faculty of information technology Financial aspect of the project.
Member of German Institute for Adult Education (DIE) Administrative Aspects for VisuaLearning Project CP DE-Grundtvig-G1 Information on.
6 September 2012 GUIDE FOR APPLICANTS CORE 2012 CALL – ELIGIBLE COSTS AND FINANCIAL ISSUES ANNA FASTYN CHIEF EXPERT SECTION FOR BILATERAL PROGRAMMES AND.
Management of the Project Teacher Education - Innovation of Studies in Mathematics and IT (TEMIT) Chavdar Lozanov University of Sofia.
Development of Intercultural Competence of Students and Trainers in EU VET institutions/INCOM-VET No. LLP-LDV-TOI-2013-LT-0145 Key issues for submission.
School Leadership Toolkit for Accelerating Achievement London 17 th November 2014.
1 An introduction to Project Cycle Management PCM DAY 3 Gori, 31/3 – 3/4/2015.
1 Tempus Project Representatives Meeting 15 and 16 March 2010.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
Name, Surname, Position Event, Date, Place Financial issues.
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the.
PROGETTO Leonardo BLENDED LEARNING TRANSFER Rationalising, Learning and Transferring the use of technological platforms to enterprise-based learning strategies.
REPORTING, BUDGET, ELIGIBLE COSTS. Main steps of the financial management of the project.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Grant contract and annexes Training for Auditors Estonia/Latvia/Russia ENPI CBC Programme Riga, Tartu, April 2012.
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
1. TEMPUS PROGRAMME PROJECT REPRESENTATIVES’ MEETING Brussels, March 2010 Management of the Grant Agreement.
Practical work (simulation) Financial forms Peter Jany.
DG Justice and Consumers Project Modifications DG Justice and Consumers.
Faculty of Technical Sciences, University of Priština in K. Mitrovica Administrative Issues (from the guidelines) – Siniša ILIĆ – Belgrade, The School.
MATcHES Project Ruse, February 26, 2014 Nohelia Morales Martínez Project number: TEMPUS BG-TEMPUS-JPHES This project has been funded with.
Enhancement of HE Research Potential Contributing to Further Growth of the WB Region Project finance and financial reporting Dr. Saša S. Nikolić,
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
Management of the Grant Agreement By Philippe Ruffio & Nathalie Hoste-Luxen Tempus project representatives’ meeting Brussels December 2011.
PROJECT FINANCE AND FINANCIAL REPORTING Prof. Dr Vera Marković University of Niš Faculty of Electronic Engineering FUSE kick-off.
Waste Train Meeting in Dresden – financial issues Marzo 2007 Elmo De Angelis
Financial Rules CCNURCA. CONTENT Budget and contractual ceilings Budget headings Co-financing Rule of origin Exchange rate.
Guidelines for the Use of the Grant
Faculty of Electronic ingeneering
Financial management of DBBT project
INTERREG IPA CBC “GREECE ALBANIA ”
Technical and Financial Reporting
Financial and Administrative presentation on PARTICULATES project
Presentation transcript:

Financial Rules

Reference documents to be consulted regularly: Grant Agreement Consortium agreement Guidelines for the use of the grant Frequently Asked Questions For national partners:

Budget headings Staff costs (incl. replacement costs) Travel costs and Costs of stay Equipment Printing & Publishing Other costs Indirect costs Co-financing

STAFF COSTS Max 40% of the total eligible direct costs Co-financing is subject to the 40% limit Daily rates stated in project application should not be increased as they are just below maximum eligible rate Increase number of days, not salary rate!!!

STAFF COSTS Staff categories: Manager Researcher/Teacher/Trainer Technical Administrative Maximum eligible daily rates for EU staff or Tempus partner country staff (in ) is given Local salary rates to be applied

STAFF COSTS Country Manager Researcher Teacher/Trainer TechnicalAdministrative UK IT SI RS

To cover the costs of staff directly necessary for the achievement of the results and not covered by other sources: Administrative or academic tasks (3.1 Guidelines): Course development, maintenance of online courses/website, Language / IT courses, translation services, evaluation activities when performed by internal staff (if sub-contracted Other costs) Replacement costs for EU staff (3.3 of Guidelines) Purpose Contractualrules Staff costs should respect local salary rates and reflect the employing institution's usual policy on remuneration. Maximum reference daily rates: Guidelines/Annex 3. Supportingdocuments The beneficiary shall retain: For staff members: Staff Convention (Guidelines/Annex 1) For replacement of EU teaching staff: confirmation of engagement from EU institution and Staff Convention The beneficiary shall provide: Explanation & supporting documents (final report) if higher salary rates are applied (Guidelines/Annex 3).

TRAVEL COSTS & COSTS OF STAY Actual costs per person for: –Travel costs –Daily allowance Actual travel costs including visa fee and related obligatory insurance, travel insurance etc. Basic principle : the cheaper option

TRAVEL COSTS & COSTS OF STAY (Travel costs) Eligible travel costs –Expenses for travel by private or company cars –The price of a rail, bus or plane ticket Expenses for travel by private or company cars (whichever the cheaper option) will be refunded as a rate per km in accordance with the internal rules of the organization concerned up to a maximum of EUR 0.22 per km

TRAVEL COSTS & COSTS OF STAY (Cost of stay) Cover the daily allowance per person Expenses will be refunded with the internal rules of the organization concerned up to a maximum of the ceilings per person indicated at point of the Guidelines must be respected

TRAVEL COSTS & COSTS OF STAY (Cost of stay) Maximum costs of stay per person:

To cover the costs of travel and subsistence allowances of staff for mobilities linked to: teaching/training assignments, retraining, update of courses, practical placements, short visits for coordination and planning, language training, dissemination visits. Purpose The budget for Travel Costs and Costs of Stay should: cover only actual travel costs (including visa fee and related obligatory insurance, travel insurance and cancellation costs if justified) cover the daily allowance: the ceilings per person indicated at point of the Guidelines must be respected Travel for research activities is not allowed Contractualrules Supportingdocuments The beneficiary shall retain: a SIGNED & filled-in Individual Mobility Report for each mobility using the standard form (Guidelines, Annex 2) readable copies of travel tickets, invoices, boarding passes, receipts. The beneficiary is not requested to send any supporting documents with the Final report.

EQUIPMENT Only the purchase of equipment which is directly relevant to the objectives of the project can be considered as eligible expenditure. This could include – books and periodicals, – fax machines; –photocopying machines; –computers and peripherals, –software; –machines and equipment for teaching purposes; –video-projectors (hardware) and video-presentations (software); –television sets, – installing/setting up of communication lines for internet connection/Skype; –access to databases (libraries and electronic libraries outside the partnership); –consumables required to ensure the smooth functioning of equipment; –equipment maintenance, – insurance, – transport and installation costs.

EQUIPMENT Only for non EU partners For Serbian partners unique tender procedure is obligatory Requested tender procedure in Serbia will be conducted by University of Belgrade

Purpose To cover the costs of equipment directly relevant to the projects objectives (hardware and software), books, the costs for installing internet connection, for access to databases, for equipment insurance/transport/installation, for maintenance of equipment. Prior authorisation required for hire of equipment. Contractualrules The equipment must: be exclusively for PC universities included in the partnership (JP) be exclusively for PC universities/institutions/organisations included in the partnership (SM) Not public administration! be exempt from VAT and custom duties (they are not eligible) be recorded in the inventory of the institution where it is installed Total expenses for equipment cannot exceed the 30% ceiling (Co- financing is also subject to the 30% ceiling. Supporting documents The beneficiary shall retain: all invoices for all equipment declared costs proofs of tendering procedure (min. 3 quotations) for purchases above EUR 25,000 (no saucissonage!). The Beneficiary shall provide: Readable copies of invoices if the purchase is above EUR 25,000. The names of the firms consulted (min. 3) have to be indicated in the Financial statement (Final report).

Printing & Publishing Printing & Publishing budget heading can cover: –paper and electronic productions (electronic form) –design, development, –establishment and maintenance of website (external subcontract) –photocopying of teaching materials/documentation

Printing & Publishing Non eligible costs: –General photocopying –Internal staff costs (i.e. web updating, web maintenance, translation etc)

Purpose Printing & Publishing budget heading can cover: paper and electronic productions (electronic form) design, development, establishment and maintenance of website (external subcontract) photocopying of teaching materials/documentation General photocopying Indirect Costs Contractualrules Internal staff costs may not be covered by this budget heading (i.e. web updating and web maintenance), VAT ineligible. Supporting documents The beneficiary shall retain: all invoices (internal invoices to be issued for in-house printing and publishing) and subcontracts. The beneficiary shall provide: Copies of subcontracts and invoices if the contract or remuneration exceeds EUR 25,000 (3 quotation to be retained) The names of the firms consulted (min. 3) have to be indicated in the Financial statement (Final report).

Other costs Other costs budget heading can cover: –Costs related to dissemination of information (advertising in media, promotional materials such as pen, bags, posters, etc.) –Inter-project coaching (maximum of EUR 2,500) –Bank charges (including bank guarantee charges where requested) –External audit fees – Costs of subcontracting for specific tasks –Travel costs and costs of stay related to subcontracted service providers –Hire of premises for dissemination events (prior EACEA authorisation needed).

Purpose Other costs budget heading can cover: Costs related to dissemination of information (advertising in media, promotional materials such as pen, bags, posters, etc.) Inter-project coaching (maximum of EUR 2,500) Bank charges (including bank guarantee charges where requested) External audit fees Costs of subcontracting for specific tasks Travel costs and costs of stay related to subcontracted service providers Hire of premises for dissemination events (prior EACEA authorisation needed). Contractualrules Ineligible costs: hospitality costs, costs related to the use of materials & equipment incurred by institutions when hosting students/ staff, registration fees for courses/conferences, exchange losses, VAT, etc. Supporting documents The beneficiary shall retain: invoices, subcontracts, mobility supp. docs., bank statements The beneficiary shall provide: Copies of subcontracts and invoices if the contract or remuneration exceeds EUR 25,000 (3 quotation to be retained) The names of the firms consulted (min. 3) have to be indicated in the Financial statement (Final report).

INDIRECT COSTS Indirect costs include: –stationery, –general photocopying, –office supplies, – postage and telecommunication costs directly related to the project. –the cost of using internet and other computerized communication software Exception : the cost of installing an internet connection can be covered under equipment

INDIRECT COSTS The total amount for indirect costs is fixed at 7% of the total eligible direct costs. Formula accepted by Serbian Universities: Indirect costs per partner = No supporting documentation is required.

CO-FINANCING Costs equivalent to at least 10% of the total eligible costs and identified in the estimated budget of the action contained in Annex II as co-financing, must be financed from sources other than the European Union.

Summary table: supporting documents per budget headings Budget heading Supporting documents To be submitted to EACA To be submitted to project coordinator I. Staff Costs Formal justification for higher salary rates Staff Conventions for staff members For replacement costs, confirmation from the EU institution that the vacated role was filled for the period in question + Convention for each staff member filling the vacated role. II. Travel Costs & Costs of Stay None Individual mobility reports and all copies of travel tickets, boarding passes, invoices, receipts. III. Equipment Copy of invoices for equipment with a total value above 25,000* All invoices Three estimates / quotations for equipment purchases obtained by tender procedures Pictures of equipment

Summary table: supporting documents per budget headings Budget heading Supporting documents To be submitted to EACA To be submitted to project coordinator IV. Printing & Publishing Copy of the sub-contract and invoice when a sub- contract is above 25,000* All invoices Sub-contracts and invoices for external staff For all sub-contract, docs on the tendering procedure (min 3 quotations). V. Other Costs Copy of the sub-contract and invoice when a sub- contract is above 25,000* All invoices, bank statements Sub-contracts, invoices and travel supporting documents for external staff For all sub-contract docs on the tendering procedure (min 3 quotations). VI. Indirect Costs None None, but should be identifiable and justifiable (Art. II.14.3)

Supporting documents - Requested for Serbian partners (1) SERBIAN partners STAFF Staff convention Ugovori o Autorskom honoraru 1. Ugovori o autorskom honoraru (pojedinačno po autorima) 2. OPJ obrasci za svaki obračun sa dokazom da su predati poreskoj upravi 3. Izvodi koji dokazuju da su isplaćeni honorari i pripadajući porezi Ugovori o delu 1. Rekapitulacija zarade za učesnike projekta čije se zarade priznaju kao trošak projekta 2. Izvodi koji dokazuju isplatu neto zarada kao i pripadajućih poreza i doprinosa 3. OPJ obrasci za svaku isplatu 4. OD obrasci za svaku isplatu TRAVEL COSTS AND COSTS OF STAY IMR / individual mobility report/ Putni troškovi 1. Putni nalozi 2. Obračuni troškova po službenom putu 3. Sve fakture koje se odnose na putni nalog(putarine, hotelski računi, karte za prevoz, boravak na terenu, kotizacije za seminare/kongrese, dnevnice) 4. Dokazi plaćanja – i akontacije po konačnom obračunu (izvodi banaka i blagajnički izveštaji) 5. Računi koji nisu obuhvaćeni putnim nalozima i izvodi koji dokazuju njihova plaćanja (avio karte, hotelski računi...)

EQUIPMENT - all invoices for all equipment declared costs - proofs of tendering procedure Nabavka opreme 1. Dokumentacija koja dokazuje postupak javne nabavke 2. Fakture dobavljača* 3. Izvodi koji dokumentuju isplatu dobavljačima * priznaje se samo vrednost usluge, bez PDV-a PRINTING AND PUBLISHING Invoice for printing and publishing Troškovi štampe1. Dokumentacija koja dokazuje postupak javne nabavke 2. Fakture dobavljača* 3. Izvodi koji dokumentuju isplatu dobavljačima * priznaje se samo vrednost usluge, bez PDV-a OTHER COSTS All InvoicesOstali troškovi1. Fakture dobavljača 2. Izvodi koji dokazuju isplate faktura Supporting documents - Requested for Serbian partners (2)

The following costs are considered ineligible: return on capital; debt and debt service charges; provisions for losses or potential future liabilities; interest owed; doubtful debts; exchange losses; VAT costs declared by a beneficiary and covered by another action or work programme receiving a European Union grant; equipment such as: furniture, motor vehicles of any kind, equipment for research and development purposes, telephones, mobile phones, alarm systems and anti-theft systems; hospitality costs; costs related to the use of materials (computer, laboratory, library, etc.) incurred by universities, institutions, industries or companies when hosting staff; registration fees for courses, seminars, symposia, conferences, congresses; costs linked to the purchase of real estate;

Be aware Do not assume that all activities in your project application are automatically eligible. Before implementing any activity, please check first that the activities indicated in your project proposal are. An Audit Report on the action's financial statement and underlying accounts must be submitted for grants > 750,000

Be aware Any conversion of actual costs into euros shall be made by the beneficiary at the monthly accounting rate established by the Commission and published on its website applicable on the month of the first pre-financing until the second pre-financing is received, after which the rate of the month of the second pre- financing must be appliedhttp://ec.europa.eu/budget/inforeuro Dates of validity Currency Rate

REQUESTED DOCUMENTS

Staff Costs

Travel costs and costs of stay

o Boarding Pass for travel by plane most important document o Invoices for air plane tickets (electronic reservations) o Other transportation tickets and bills o Hotel bills ( not obligatory)

Thank You For Your Attention!!! Msc. Marija Šola International Relation Office, University of Belgrade