Engr 1202 ECE Project Cost Analysis.

Slides:



Advertisements
Similar presentations
Compexa IT Solutions New Delhi. Get Your Rice Mill Computerized.
Advertisements

Unit 5 Spreadsheets 5.01 Introduction to Spreadsheets.
Accounting for a Service Business Unit 1.8 The Ledger.
Dilbert.
Financial Mathematics I Week 8. Start on stage 3 of final project. –Paper copy is due week 10 (include all stages, including before and after revisions).
EXCEL PART1. Objectives  Understand spreadsheet software  Tour the Excel 2010 window  Understand formulas  Enter labels and values and use the Sum.
The Islamic University of Gaza
Accounting #4 Bank Reconciliation
In Engineering Project must define budget as well and project expectations and monitor them. Personal Financal model is example to make it real (and other.
Stock Market Game Grading. Stock Journal Rubric Week #ComponentPossible Points 1 Table, list & rationale for at least 5 purchases 20 2 what new stocks.
Charter Partners Institute eVenture Financial Case Guide Note: This is only a guideline. Presentations should be adapted to bring out the important financial.
Translating Word Problems into Equations. Avoid the nervousness! Follow these steps: Read the problem carefully and figure out what it is asking you to.
1 The Role of the Finance Department Higher Grade Business Management 2009.
McGraw-Hill/Irwin The Interactive Computing Series © 2002 The McGraw-Hill Companies, Inc. All rights reserved. Microsoft Excel 2002 Exploring Formulas.
Chapter 12 Savings.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
Chapter 14 Managing Projects.
J. K. Dietrich - FBE Fall, 2006 Performance of Financial Services Firms Week 2 – August 31, 2006.
Chapter 2 Basic Managerial Accounting Concepts
 Work Sheets Chapter 8. Fiscal Periods  A “fiscal” period (a/k/a “accounting” period) is the amount of time for which a business reports financial information.
IE 475 Advanced Manufacturing Costing Techniques
Course information Real estate finance (RE410). Erwan Quintin Grainger Hall Office.
Excel – a spreadsheet program that allows you to organize, calculate, make decisions, graph, develop reports, and publish information to the Web. Worksheet.
Dilbert. Next steps in the antenna fabrication process Create a dielectric surface. The antenna must sit on a dielectric or insulating surface,
Check it out! : Differences Between Populations and Samples.
Server Storage Gets Cheap Engr 1202 ECE Project Cost Analysis.
IT 499 Bachelor Capstone Week 3. Adgenda Administrative Review UNIT two UNIT threeProject UNIT four Preview Project Status Summary.
Board Activity Make a list of at least five products that students and/or faculty in your school would want to buy at your school site and use daily or.
INTRODUCTION TO SPREADSHEETS MICROSOFT EXCEL. Spreadsheets Allows users to perform simple and complex sorting Allows users to perform calculations quickly.
Server Storage Gets Cheap Engr 1202 ECE Project Cost Analysis.
Business Information Management I 1. “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted.
CHAPTER 12 FINANCIAL MANAGEMENT Financial Planning FINANCIAL PLANNING Ongoing Operations Revenue – all income that a business receives over a period.
Chapter 4 Marketing Implementation. Implementation:Putting the Plan into Action Good marketing plan is future oriented and needs workable and realistic.
Chicago Excel Classes - On Site Microsoft Office Training Published by:
Chapter 3 Basic Cost Concepts McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. 3-3 Learning Objectives Explain the cost.
FIN 420 TUTORIALS Learn by Doing / fin420tutorials.com.
 Two types of analysis based on the data that is generated.  Quantitative or  Qualitative  Basic descriptive statistics such as mean, median, and.
Project Management Lecture 22 Readings Chapter 14 Lecture 22 Short Project Management.XLSX Lecture 22 Project Management.XLSX Lecture 22 Event Management.XLSX.
Accounting November 7, 2014 Begin Chapter 6 notes WT/OYO/Application for 6-1 and 6-2.
FIN 575 Final Exam
Job-Order Costing: A Microsoft Excel-Based Approach
TCM: HOW TO CREATE A BUDGET UNIT
Chapter 22 Master Budgets
Cengage – Century 21 Accounting -- Edited for Advanced Accounting
Project Management Lecture 22
Dilbert.
Copyright ©2008 The McGraw-Hill Companies, Inc. All rights reserved.
Cost Allocation: Joint Products and Byproducts
Financial Literacy Savings
DEVELOPING A BUSINESS PLAN FOR A MANUFACTURING COMPANY: BUDGETING
Measurement in Experiments
Standard Cost Systems: A Financial Reporting Perspective Using Microsoft Excel Appendix 10B.
Reporting and Interpreting Cost of Goods Sold and Inventory
The Islamic University of Gaza
Inventories and Cost of Goods Sold
ACC349PAPERExpert Level -acc349paper.com
4. Finding the Average, Mode and Median
The Role of the Finance Department
Chapter 7: Financial Statements
Project Management.
FIN 420 TUTORIALS Education for Service--fin420tutorials.com.
Cost Accounting-I Recording System.
Agricultural Microeconomics Lesson 7: Intro to Spreadsheet Modeling
Marketing Implementation
Understanding your retirement account statement
Study Skills Organisation, time management and preparation LSS 1003
PowerPoint presentation
Ex 2 Inventory? Inventory 10,000 Cash 10,000 What type of account is it? On what financial statement will it show up?
Excel for Educators Class Notes
Presentation transcript:

Engr 1202 ECE Project Cost Analysis

Two Categories of Business Expenses Direct (Manufacturing Cost) Material Cost Factory Cost Labor Cost Indirect Sales/Marketing Staff Phones Insurance Advertising Travel Lawyers Accounting Benefits

Cost Analysis for Engr 1202 ECE Project For purposes of the Engr 1202 ECE project, we will deal only with direct costs. Final cost is ALWAYS important Direct costs will include tooling, labor, materials, and losses during manufacturing (Yields) Lowest cost with highest quality is the goal Market will determine success, not technology innovation

The cost analysis will be done using the Excel software Excel is a spreadsheet program Excel provides a simple way to do arithmetic calculations and value changes to get final calculations Changes to any value ripple through the entire spreadsheet to adjust final answers Once the spreadsheet is set up, it can be used over and over (for different years, months, semesters, etc.) Excel is good for check book balancing, budgets, stock portfolio history, financial assets, grading for classes, etc.

Sample grading spreadsheet Final Grade 85(.2) + 86(.4) + 90 (.2) + 80 (.2) = 85 “B”

List processing steps used

Determine maximum lot size – the maximum number of wafers that can be processed at once

Determine tooling cost for each process

Determine tooling hours per process step

Total tooling cost is calculated Tooling cost/hour x Tooling Hours = Total Tooling Cost Sum of each process

Choose a labor cost per hour

Determine labor hours per process step Note - labor hours will be different from tooling hours. Labor can be used for other tasks while parts are being processed in the tool

Total Labor Cost is calculated

Tooling plus Labor cost are added

Manufacturing cost per wafer is calculated Manufacturing cost = cost per step / lot size

Approximate Wafer cost Cost is now per wafer Approximate Wafer cost 4” - $10 6” - $24 8” - $75 12” - $150 Find your conductor cost per gram on the conductor attributes chart on the web site Note- Use of larger wafers would require higher tooling cost due to the tooling being much more expensive Manufacturing cost per wafer + material costs

Wafer losses are factored in One wafer in 10 gets broken Finished wafer cost x wafer yield = yielded wafer cost

Final manufacturing cost of one antenna is calculated Yielded wafer cost is divided by yielded total number of complete antenna on wafer to give individual antenna cost

Title must be added to spreadsheet

Assignment – HW 11 due next class Each student is to create a manufacturing cost spreadsheet for your antenna design – due next week Count or calculate number of complete antenna on a 4” wafer Each spreadsheet must have a title with the team number and the individual student name Spreadsheet must have gridlines Spreadsheet must fit on one page Each team must assign one of the listed options to each student Labor at $ 0.00 Labor at $ 10.00 Labor at $ 50.00 Labor at $100.00 or any labor cost over $100 All equipment tooling cost at $150/hour Wafer size at 6” – multiply antenna quantity for 4” wafer by scale factor Use wafer cost of $24 for 6” wafer Wafer size at 12”, multiply antenna quantity by 4” wafer by scale factor Use wafer cost of $150 for 12” wafer Determine the labor cost you will use for your presentation/report Evaluate if cost is reasonable Redesign to improve cost if necessary