IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER.

Slides:



Advertisements
Similar presentations
Construction Damage & Prevention Construction damage is one of the greatest causes of tree death and decline in urban areas. Presented by: Courtney Blevins,
Advertisements

Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Slips and Falls for Van Drivers
Sharing the Roadway Chapter 11.
Assessing and Managing Risk
Sharing the Road Look for Motorcycles Motorcycles Motorcycles have the same privileges as other vehicles on the road. The chances of being involved.
December 2009 Movement & Activity Recommendations: 1.Promote & Increase Stair Usage 2.Promote Bicycle Commuting 3.Promote Walking Great Places to Work.
By Taylan Çetinkaya & Cem Baki. OUTLINE Introduction Main Part  Some Problems That We Observed Conclusion.
Chapter 10: Negotiating Intersections
Land of Imagination Playground for Children of All Abilities Howarth Park Santa Rosa, CA.
Safety for Workers on Foot. Safe Practices  Consider worker behavior when developing the ITCP. Determine locations where workers are likely to go.
Barriers to Use of Fixed Route Transit Services Janet M. Barlow Certified Orientation and Mobility Specialist Accessible Design for the Blind NCAMPO conference.
Crime Prevention Through Environmental Design
 Most pedestrian deaths and injuries are traffic related. Children from birth to two are more likely to be hurt in driveways, parking lots and on sidewalks.
IMPROVING THE SAFETY OF NON-MOTORIZED ROAD USERS Antida Aversa Automobile Club of Italy.
EQUAL-PLAY PLAYGROUND Manatee High School Key Club.
Playground Project.  Sloping ground provides drainage problems  All slides need replaced (cracked)  Several gaping holes in play structure  Steps.
1 Starting a Project – Looking for footpaths or pushed down ROW fences Plan for your pedestrians or they will be walking through your project on the edge.
Urban renewal in central Linköping Draft version 21 November 2007.
Slip, Trip and Fall Prevention
Campaign “Road Safety for a Better Environment” Prepared by SAAS “Marina” Grade 9 “A”
INFRASTRUCTURE FOR CHILDREN SAFETY IN PUBLIC PLACES B.G.Sreedevi Director,
NEGOTIATING INTERSECTIONS
Proposal to Renovate the Gunter Park By Brooke Hogan By Brooke Hogan.
Office of Traffic, Safety, and Operations Application Guidelines Warning Signs Signing Plan Design (At-Grade) June 20, 2012.
New Jersey Crossing Guard Training Part 3. HAZARDS, INCIDENTS, EMERGENCIES Post Review Hazards Hazardous Conditions Reporting Hazardous Weather Traffic.
Standard 29 CFR Part Vehicle Mounted Elevating and Rotating Work Platforms.
Value of a Well Planned Space. Goals of a well planned space 1.Provides a physically safe environment for children 2.Provides children with areas that.
Objective 1.03: Explain ways to adapt housing to meet special needs.
Assistive Technology In Physical Education Nicole Marincola Jean Collado.
Highways and Airports Engineering Project Lecture 2 Highway Signs and Markings Cairo University Faculty of Engineering Public Works Department Dr. Dalia.
lesson 2.3 ROADWAY MARKINGS
Video Tour of Head Start Preschool Classroom +to+arrange+a+preschool+classroom&view= detail&mid= B69F8029C
NEGOTIATING INTERSECTIONS
Accessibility Checking at Pung-Waan Resort Kanchanaburi Saiyoke District, Kanchanaburi Disabled Peoples' International Asia-Pacific (DPI/AP) Ms. Saowalak.
 Since 2008, approximately 150 pedestrians have been killed annually in traffic related crashes on New Jersey roadways.  Vehicle-pedestrian collisions.
Intersections.
Falls From Height. Identifying fall hazards Falls are a major cause of workplace fatalities and serious injuries. There are many jobs that require people.
Access for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind 2015 Walking Summit October 29, 2015.
Chapter 9 Working with Young Children. Developmentally appropriate programs value outdoor areas as much as indoor areas The outdoor required area per.
Bridge to Equality: Informal Settlement Redesign Model Brenda Lugano Final Capstone Presentation
APPROPRIATE SPACE ARRANGEMENT. Physical Effects  Floor Coverings  Permanent fixtures,  Storage  Color  Children’s display  Child-size furniture.
ROADWAY MARKINGS A roadway marking gives a warning or direction. Roadway markings are usually lines, words, or symbols painted on the roadway. Some markings.
2.02-Preventing Injuries away from Home Ways to Prevent Injuries Away from Home.
Chapter 5 Sharing the Road.  When following a large vehicle, stay out of its "blind spots". Position your vehicle so the driver can see it in the side.
Welcome to. What is the Playscape? The Playscape at Ripley is a new nature park for all ages and abilities in Concord, Massachusetts. It is a unique,
My Community By Michael Chirco and Kelcey Parks. The Park’s Positives This is the park in my neighborhood. My neighborhood is Princess Anne Quarters.
 U.S. Consumer Product Safety Commission  Public Playground Safety Handbook 325  New edition adopted in November 2010  More consistent with ASTM F1487.
 Research Findings and need for Outdoor Safety Policies for Healthy Development  Organizing for Outdoor Safety  Outdoor Environmental Hazards -  Playground.
Planning Healthy Neighbourhoods Presenter: Stephanie Knox.
Lesson Plan For Day Two Power point presentation 30 min Video– AAA- signs, signals, etc. 20 min Quiz- Signs Etc 10 min Correct 10 min H/O- Signs 10 min.
As you can see, low frequencies are not absorbed as well. This means low frequencies will travel farther. That graph comes from this extremely detailed.
Jeopardy $100 Chapter 1,2,3 Chapter 4,5 Chapter 6,7 Chapter 8,9,10 Signs and signals/ Emergency Situations $200 $300 $400 $500 $400 $300 $200 $100 $500.
Intersections.
TEACHING YOUNG CHILDREN Chapter 10 Planning the Physical Environment Outdoors.
How easy is your building to use?
Playground Analysis by Stephen Thomas
Public Playground Safety Handbook 2008
United Cerebral palsy of mobile - preschool
Crime Prevention Through Environmental Design
A CITY ORIENTATED TOWARDS THE PEOPLE
Construction Management & Inspection
Site Based Preconstruction – Enabling Work
Chapter 15: Driving in Rural Areas
Project Schematics Circuit Working Principle and Equations
How easy is your building to use?
Your ideas your initiatives
Playground Research Project
lesson 2.3 ROADWAY MARKINGS
Ways to Prevent Injuries Away from Home
Presentation transcript:

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER

Actual situation

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Projected situation

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER

Repairing refers to: The basketball field, where it is planed to repair the damaged baskets, mark the ground and repair the existing urban furniture. The field for combined sports, where it is planed to level the ground adequately, repair the baskets, install the goals, mark the ground and repair the existing urban furniture. Since there is a basketball field nearby, intervention implies the reduction of the basket standard height to enable younger children to play this sport. The surfaces of the existing pedestrian paths. Surfaces for the vehicles parking and their adjustment to the needs of persons with disabilities (at least a few parking spaces near the field, that is, the access to pedestrian paths).

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER

The surface this equipment is located on is planed to be covered by Ecoflex, the material resistant to different weather conditions, which is not slippery and has a certain level of flexibility which prevents injuries. Ecoflex is planed to be dark gray with the white lines drawn on it. The surface between the handrails on the ramp and the walking and playing area with handrails is colored, enabling the children with sight impairment to be better oriented in the space. A color is also planed in one part of the pedestrian path, going through a fencing part of the playground, leading to the area for the children to play. It is planed for part of the ground to be covered by sand and for the slide exit and the playing tables to be projected on this area.

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER

Reconstruction refers to: The children playground area, implying the construction of the new spaceship-like installation - system for the children to play outside. This solution is anticipated because this type of the installation is very interesting, especially to children, encouraging their imagination. The installation is also accessible to the persons with physical disabilities (wheelchair users) over a ramp which is the only way to reach the installation (in this way the children wouldnt be separated). As far as the equipment within the children playground is concerned, there are: swings, with three places for swinging, with specially projected sits, the area for playing and for walking with handrails and a slide within the installation. The surface this equipment is located on is planed to be covered by.

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities

IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER

The Project anticipates fencing one part of the area for its maintenance and protection. One part of the fence would be a 2m wall in the part of the area looking towards the large traffic artery and Bezanija graveyard. In addition to this the solid obstacles would be followed bu reinforced police protection, especially at night. The additional funds for fence will be made bu ISDC from other donators, as National Investment Plan, Municipality, etc. Final look of the park