Totally Precast Concrete Bridges

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

SEMINAR ON SEGMENTAL CONSTRUCTION OF BRIDGE
July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
2013 Northcentral Region Construction Conference
Work Zone Safety Using Accelerated Bridge Construction (ABC) Rukhsana Lindsey, UDOT Presented by Jim McMinimee Principal Engineer, Applied Research Associates.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Concrete Construction Part 1
Bridge Engineering (6) Superstructure – Concrete Bridges
Concrete and Masonry Work Different forms of concrete work Each has it’s own unique hazards – Lift Slab – Pre-stressed Concrete – Concrete Pumping – Masonry.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Fundamentals of Building Construction, Materials & Methods, 5 th Edition Copyright © 2009 J. Iano. All rights reserved. Plant-Cast Precast Concrete Concrete.
SHRP2 Project R04 Bridge Designs for ABC
Spliced Precast Girders
Chapter 34 Bridge Construction.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
Bridge Projects PCEF Meeting Dover, DE Aug 25, 2009 Troy M. Jenkins, P.E. Chief Engineer Northeast Prestressed Products, LLC.
Bridges unit 101.
Totally Precast Concrete Bridges
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
Reconstruction of the Eads Bridge Highway Deck
 Project Delivery  Design Considerations  Lessons Learned.
Trestle Rebuilds The Continuing Quest to Fill the Gap
Reinforced Concrete VS Steel
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
Optimizing “Big Box” Construction Lauren Hughes Josh Hogan Kevin Hanson Joseph Garrott Rose-Hulman Institute of Technology.
Chapter 19 Floors.
The Future FORWARD. Material properties, such as corrosion resistance, fire resistance and durability are being continuously improved and exploited. These.
Schematic Design of an Accelerated Bridge Construction Project Michael P. Culmo, P.E. Vice President of Transportation and Structures CME Associates, Inc.,
PRE-FABRICATED STRUCTURES
RM Product Update October 2009 Alexander Mabrich, PE, Msc Senior Engineering Consultant.
St. Anthony Falls Bridge By: Timothy Brewer St. Anthony Falls Bridge Backround Location: Minneapolis, Minnesota Design: Steel Truss Arch Bridge I-35.
ABC/PBES COSTS by Mary Lou Ralls, P.E., Principal Ralls Newman, LLC (formerly Texas State Bridge Engineer)
BRIDGE DESIGN SAIF HAROON BY Post-Doctoral Research Associate
Introduction Advantages Dis-advantages Methods of Pre-stressing Mix Design Curing Laboratory Test Visit Report.
THE MITCHELL FRAMING SYSTEM A building system that encourages homeowners to have a direct involvement in driving building growth and expansio n Neal Mitchell.
BRIDGE BUILDING.
TYPES of BRIDGES.
WVDOH Accelerated Construction Concepts Benjamin Beerman, PE.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Bridge Engineering (5) Substructure – Abutments and Piers
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
A Marketing Approach to Bridge Longevity All about being specifically wrong … while being generally right Presented by: Heinrich O. Bonstedt Executive.
Advantages of Prestressed Concrete Bridges. Owners and designers have long recognized the low initial cost, low maintenance needs and long life expectancy.
土木工程概论 Introduction to Civil Engineering 第五、六、七章 交通、桥梁与港口工程 Chapter 5 Transportation, Bridge and harbor Engineering.
Totally Precast Concrete Bridges
Engineering Technical English
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Offsite manufactured Bridges
Replacement of Vehicle Bridge over Spring Creek
Engineering Terms Bridge Unit.
Design & Engineering CAMS South
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Danube Bridge Vidin – Calafat
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Bridge modelling with CSI software.
Wrangle Hill Elementary School New Castle, DE
Precast/Prestressed Bridges LIVE14BRID100
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Construction Engineering and Management National Central University
The Future FORWARD BRIDGES -section 5 -- revised
By: Clarence Fragoso and Jonathan Lopez
Presentation transcript:

Totally Precast Concrete Bridges FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES Is it possible to design an “Instant Bridge?” Almost! There are many ways to put a bridge together quickly with precast concrete products. BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES The speed and variety of precast prestressed products and methods give designers many options. Consider these advantages of an all-precast bridge… BACK FORWARD

Benefits to Owner Agencies: TOTALLY PRECAST BRIDGES -- CASE STUDIES Fast construction benefits owner agencies by reducing the duration of the work zone. Fast construction reduces traffic handling costs and accident exposure risks. There’s less inconvenience to the traveling public, fewer delays, and fewer motorist complaints. According to a report by the Texas Transportation Institute, costs incurred by drivers passing through a work zone (along with engineering costs) can be $10,000 to $20,000 per day. A recent Federal report indicates user costs of $50,000 per day for work zones in urban areas. Benefits to Owner Agencies: Reduction in the duration of work zones Reduced traffic handling costs Reduced accident exposure risks Less inconvenience to the traveling public Fewer motorist complaints BACK FORWARD

Benefits to Contractors: TOTALLY PRECAST BRIDGES -- CASE STUDIES Contractors benefit from reduced exposure to traffic hazards. More work can be accomplished in less time, with fewer weather delays. Costs are lower for forms, skilled field labor, scaffolding and shoring, and cranes. Benefits to Contractors: Reduced exposure to hazards More work -- less time Fewer weather delays Lower costs Less skilled labor BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES After foundations have been completed, scheduling can be controlled by a single contractor working with a familiar material. Scheduling Control BACK FORWARD

Plant-produced Elements TOTALLY PRECAST BRIDGES -- CASE STUDIES Precast concrete structural elements should always be plant produced under carefully controlled conditions…by plants that are Certified by PCI. Plant-produced Elements BACK FORWARD

Quality and Corrosion Resistance TOTALLY PRECAST BRIDGES -- CASE STUDIES … so all structural elements benefit from the excellent quality and corrosion resistance of prestressed concrete. Quality and Corrosion Resistance BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES Fully-cured precast concrete structural elements can be stockpiled in advance of need… Stockpiled in Advance BACK FORWARD

Immediate Delivery and Erection TOTALLY PRECAST BRIDGES -- CASE STUDIES …and can be scheduled for “just-in-time” delivery and erection… Immediate Delivery and Erection BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES There’s no curing time required at the jobsite, as with cast-in-place concrete. Bridge piers can be erected in a day, and beams can follow immediately. No Curing Time BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES The following photos illustrate the many products and construction methods that enable very rapid project completion. In addition to the often-used superstructure elements of girders and deck slabs, substructure components such as these piers can also be precast. BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES Precast concrete piles are quite popular in much of the country. They come in different sizes and shapes, ranging from 10-inch square piles to 66-inch diameter hollow cylinder piles. BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES Pile caps also can be precast concrete, reducing exposure, forming and curing in the field. BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES Piers can be made of precast concrete pieces quickly assembled in the field. BACK FORWARD

Abutments can also be made of precast. TOTALLY PRECAST BRIDGES -- CASE STUDIES Abutments can also be made of precast. BACK FORWARD BRIDGES -section 5 -- revised 6-10-02

Sucker Creek Bridge in Hague TOTALLY PRECAST BRIDGES -- CASE STUDIES The Sucker Creek Bridge in Hague, New York, consists of precast concrete box beams supported on precast concrete abutments assembled into a jointless, rigid frame. Sucker Creek Bridge in Hague BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES In San Juan, Puerto Rico, the totally precast concrete Baldorioty de Castro Avenue bridges were built in record-setting time, attractively, and economically.   Puerto Rico MAIN BACK FORWARD

A totally precast bridge TOTALLY PRECAST BRIDGES -- CASE STUDIES Each of four bridges, ranging in length from 700 to 900 feet, was erected in about 24 hours. This was well within the owner’s construction allowance of 72 hours per bridge, a condition established to minimize disruption to one of the city’s highly traveled corridors.   Puerto Rico - A totally precast bridge BACK FORWARD BRIDGES -section 5 -- revised 6-10-02

TOTALLY PRECAST BRIDGES -- CASE STUDIES In addition to speed, the bridges also met the city’s budgetary needs. The four box-beam bridges were constructed for $2 million less than the next lowest bid for another material. Puerto Rico BACK FORWARD

Confederation Bridge New Brunswick, Canada TOTALLY PRECAST BRIDGES -- CASE STUDIES Totally precast bridge systems may be the only viable solution in harsh field conditions. The Confederation Bridge connecting Canada’s Prince Edward Island to mainland New Brunswick is such an example. The bridge spanned the eight-mile-wide Northumberland strait, which experiences severe winters and is covered with ice floes for five months of the year. Confederation Bridge New Brunswick, Canada BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES Even in such harsh conditions, precast concrete was able to meet the owner’s requirements of a 100-year service life, a 3½-year construction period, and attractiveness. Confederation Bridge BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES It just makes economic sense to evaluate conversion of cast-in-place to precast concrete. This was done for the Edison Bridge in Florida. Precast piers and beams were spliced to produce tall pier bents. Edison Bridge Florida BACK FORWARD

TOTALLY PRECAST BRIDGES -- CASE STUDIES The state of Texas has constructed several bridges with segmental precast concrete piers. The attractive piers and pier caps are hollow members. Some are made of high-performance concrete. Such segments may be match-cast, similar to segmental box girder bridges, or separated by a thin mortar bed, much like giant masonry units. Texas - Precast Piers BACK FORWARD

Louetta Road Bridge Texas TOTALLY PRECAST BRIDGES -- CASE STUDIES In Houston, the Louetta Road Overpass utilized precast concrete match-cast piers, as well as precast, prestressed U-beams and stay-in-place deck panels. Louetta Road Bridge Texas BACK FORWARD

Sunshine Skyway Bridge TOTALLY PRECAST BRIDGES -- CASE STUDIES Another famous bridge is the Sunshine Skyway Bridge over Tampa Bay in Florida. The piles, piers and pier caps were constructed of precast concrete elements connected together with post-tensioning threadbars. Sunshine Skyway Bridge Florida BACK FORWARD

Thank You for Your Attention BACK