Capacity Allocation Mechanisms

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Access to UKCS Infrastructure Infrastructure access important for continuing development of UKCS Access is by commercial negotiation within a legal and.
1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
EU Energy and Competition Law: Influence On Russian Trade and Investment Interests Ivan Gudkov, MGIMO-University, May, 31, 2013.
Buying Better Outcomes Workshop 4 Equalities and Contract Management If you do not take it seriously, why should the supplier?
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Energy Risk Management – 3 October 2006 Increasing interactions with global energy markets - the impact on the GB gas market Jo Witters Wholesale Markets,
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
1 UPDATE ON THE EPA NEGOTIATIONS CUTS/WTO Regional Outreach Workshop Nairobi. By: Ambassador Nathan Irumba SEATINI (Uganda )
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
New Rail Market Access Rules Directive 2012/34/EU (recast) EUROPEAN COMMISSION.
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
CESEC Energy Community Project Monitoring
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
LNG Study: Is an European Action Plan Necessary? Bucharest, October 24 th, 2008 Pedro Moraleda Energy Markets Advice.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
The EU ETS and the Modernisation Fund: European Power sector’s perspective Krzysztof Laskowski Climate Policy Advisor, EURELECTRIC Brussels, 4 May 2016.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Doug Wood GTE-CEER transit workshop Brussels, 24 January 2007 Doug Wood GTE-CEER transit workshop, 24 Jan 2007 European Federation of.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
International Association of Oil and Gas Producers Europe’s Indigenous Oil and Gas Production GSE Workshop Brussels – 24th May 2007.
Transmission Access Workshop 8 March Workshop agenda 1.Introduction 2.Allocative Efficiency - initial allocation ● Is the length of property right.
Regime to apply regarding financial services, such as banking, credit and insurance Audrius LINARTAS Deputy Chairman Insurance Supervisory Commission of.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Marek Stavinoha Legal officer DG MOVE A4 European Commission
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Views on the EC Draft LNG Paper
M&A Regulation under Competition Law in Japan
The 3rd package for the internal energy market
Maria Price, DPhil. (Oxon.) Head of EU Policies and Public Affairs
Internet Governance Panel
CRE Public Consultation on new exempt interconnectors
GIE Annual Conference Recent developments in Transparency in the EU
26th IG meeting 23th January 2014
Gas Transmission Europe
Background and Process
CESEC Energy Community Project Monitoring
Gas balancing – where next
Introductory Speech FRANCISCO DE LA FLOR - GLE PRESIDENT 26/04/2007
Gas Quality & TSO – LSO Coordination
GIE Annual Conference Bratislava, September 2006
Role of gas storage in the context of SoS
DRAFT DG TREN Staff Working Paper on LNG
Regulation for Smart Grids
Incentives for electricity infrastructure – ERGEG view
Transparency & Services
Review Group 166 End User Perspectives 20 September 2007 Julie Cox.
Meinhard Janssen GIE Board Member
LNG Workshop Bilbao, March 13th 2009 GLE.
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Outline Background: development of the Commission’s position
Presentation transcript:

Capacity Allocation Mechanisms & Anti-Hoarding Rules LNG Workshop, March 13th 2009 GLE

Application of CAM principles to past capacity booking needs GLE

CAM Principles LNG industry remain based in a large majority on long term contracts with underwritten investments ; LNG terminals customers need to be confident on the stability of their contracts with LSOs. Any non agreed modification of already LNG terminal capacity would have tremendous impact : on contractual commitments of LSOs toward their clients, as well as on the upstream supply chain, including security of supply issues. GLE

CAM Principles Therefore, GLE considers that a stable regulatory framework is fundamental for the LNG industry. GLE

Anti-Hoarding notification periods and rules GLE

Anti-Hoarding By “anti-hoarding” the Commission seems to refer to shorter notice actions that may be reasonably taken to ensure optimal use of the infrastructure by giving shippers access to the infrastructure when capacity is physically available, provided this capacity is not used or traded by the primary holder. GLE

Anti-Hoarding GLE agrees with the Commission, when it notes that LNG plays different roles in various European markets, so that the concept of capacity hoarding has to be considered in different way than for pipelines. In fact, as almost each terminal has a specific business model and a specific competition environment, a “one size fits all” approach is not applicable. Therefore, GLE considers it would not be appropriate to impose detailed/prescriptive provisions on access rules, notice periods and effects on capacity rights Only general principles and criteria should be agreed in the context of the GGPLNG; GLE

Anti-Hoarding A general principle could be that the notice periods should be long enough to allow potential third party users of unused capacity to take necessary arrangements to be materially able to use such capacity, without prejudice to the right of the primary terminal user to take advantage of its scheduled capacity. In any case, the principle should be that the notice periods and rules applied by the LSO must be transparent and non-discriminatory and should not constitute a barrier for new entrants. GLE

Thank you for your attention! GLE