Construction Operation

Slides:



Advertisements
Similar presentations
Roles & Responsibilities in Construction Management
Advertisements

ABC Change Orders College of Environmental Design
VISION & MISSION OF KeNHA VISION : Quality, safe and adequate National Road Network. MISSION : Provide quality National Road Network for sustainable social.
Property Management Contract Oversight VDOTs Outsourced Safety Rest Area Program November 15, 2013 Maintenance Division.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Managing a Successful Mechanical System project Following design – what next?
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
SUBMITTALS PROCESSING Fall 2008 ARCH 330
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
PROCEDURES FOR SELECTING THE CONTRACTOR
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Construction Engineering 221 Drawings and Specifications.
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Standards of Practice Course
CONSTRUCTION ADMINISTRATION Changes and Extra Work in Construction Management Dr. Alaattin Kanoğlu Spring, 2013 Professonal Practice Management I.B.U.
Project Diary Missouri Local Programs How to Develop and Use the Daily Diary and Payment Diary for LPA Inspectors.
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
Chapter 4 continued. Intermittent Inspection –Oversight of several projects makes continuous observation impossible –Do weekly reports instead of dailies.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Department of Finance Building Management and Works Trial of Project Bank Accounts 2014.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Bank guarantees or letters of guarantee Know the letter of guarantee or bank guarantee is a written undertaking by a Bank, usually at the request of the.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Agency Construction Management :CM NOT AT-RISK
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
LPA Training Program. LPA Training Program: Construction/Contract Management Module 2.
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
DISTRICT CONSTRUCTION ENGINEER PANEL DISCUSSION Contract Management: Claim Avoidance and Handling Keith Compton, P.E. District 5 Construction Engineer.
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
FMCB Meeting February 29, 2016 GREEN LINE EXTENSION PROJECT 1 PURPOSE OF BOARD REQUEST To request that the FMCB authorize the MBTA General Manager to:
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Administration of a FIDIC Contract - Project Control
Document control MODULE 4.
Safety Responsibilities
Designers’ Manual Overview and Chapter Contents
Construction Materials and Workmanship
Manajemen Konstruksi Bidding & Award
Lecture 10 PROCUREMENT Ferdinand FASSA.
Contract Changes Construction contracts are unique because owner can make unilateral changes to contract (with consideration)
Construction Contracts
Directed Change Constructive Change
The Players OWNER/CLIENT Construction Manager (CM)
Presentation transcript:

Construction Operation Lecture 8 Construction Operation Ferdinand Fassa

Outline Authority and Responsibility of all Parties Time of Inspection and Test Contractor Submittals Instruction to field Suspension or Termination of The Work

1. Authority and Responsibility of all Parties Owner Authorized to award contract To make changes in the work To withhold payments from the contractor for adequate cause To inspect the work as progresses To direct contractor to expedite the work To make payment deductions from incomplete or faulty work

1. Authority and Responsibility of all Parties Contractor Major responsibility is to construct the project in accordance with the drawings, specification, and other contract documents. Resident Project Representative Inspect the workmanship, materials, and manner of construction of all building and appurtenant structures.

2. Time of Inspection and Test Contractor must give the engineer timely notice Tests and inspections required by public agencies must usuaslly be paid for by the contractor Test and inspections, other than those mentioned, that are required by the contract document will be paid for by the owner Extra inspection required as the result of a deficiency noted by the inspector must be paid for by the contractor The contractor firm must provide all materials for testing at its own cost and expense

3. Contractor Submittals All submittals from the contractor should be handled in a systematic, consistent, and orderly manner. Contractor submittals are to be documented both when coming in going out Keep photographic records of progress and all potential claim issue Contractor submittal handled only through Resident Project Representative

4. Instruction to field Inspect the work as it progress No field changes without Project Manager Instruction Instruction to the contractor through superintendent or Project Manager Field orders and change orders must be handled through Resident Project Representative

4. Instruction to field No changes on oral instructions without written confirmation No significant deviations from plans and specifications except by change order-event if no cost or time extension is involved Emergency changes by work directive change followed latter by a change order

5. Suspension or Termination of The Work Suspension of work by the Owner Termination

Question