Week 35 – Technical Stop and Restart

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
Ion Commissioning: Thursday & Friday
Wednesday
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Saturday 30th June - Sunday: Rocky !
Summary week 36 Coordination by B. Holzer & J. Wenninger
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Summary week 30 Week 30 R. Bailey & J. Wenninger
LHC commissioning Week 38
Mike Lamont, Jorg Wenninger
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
LHC Status Sun Morning 20-Mai
Monday Morning – recovery from cryo.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Tuesday morning 08:30-09:00 Squeeze with probe.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Wednesday morning / afternoon
Daniel, Gianluca and Belen (for the Collimator team)
HI2011 Commissioning Status
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Week 35 – Technical Stop and Restart Monday morning @ 6:00: Begin of Technical Stop #4 after MD period Coordination Julie Coupard Friday afternoon 17:30 Machine Closed – DSO OK Coordination Jorg Wenninger, Jan Uythoven Very smooth start-up without any significant hardware problems! Some controls problems remain to be sorted out – data publication/subscription Special at this start-up Preparation for * = 1 m at IP1/5 Alice polarity reversal 05/09/2011 LHC 8:30 meeting

* = 1 m in IPs 1 and 5: The Context During MD period optics with * = 1 m was tested using Tight collimator settings Reduced crossing angles from 120 rad to 100 rad Beam was unstable during squeeze During same MD period the physical aperture around the triplets in the IPs was found to be larger than initially assumed Decision in LMC last week Continue running with same collimator settings as before the TS TCTs IR1, 5 and 8 @ 11.8  Stay with the crossing angle of 120 rad Confirm the additional physical aperture Start-up program after TS based on this 05/09/2011 LHC 8:30 meeting

Start-up: Friday 2nd September & Night Friday 17:30 Machine Closed – DSO OK Friday 19:30 BIS loop closed. Dry dump. XPOC OK. Friday 22:50 Both beams injected, probes Injection not clean – later ok without touching the LHC Friday 02:45 Beam losses during the first ramp after TS Orbit feedback not working properly, problems Tune feedback, beams lost in the squeeze....sorted out during the night Dump at 3.5 TeV: OK Saturday 12:00 Ramp and squeeze for TCT alignment with * = 1 m Sunday morning: Change of Alice Polarity reversal Start of “Master Plan” 05/09/2011 LHC 8:30 meeting

Conclusions on Aperture so far Aperture confirmed at 1 m – there is enough aperture for *=1m & 120 µrad Xing angles, with around 2 sigma additional margin. We can conclude that for the squeezed/separated case we found >16 sigmas in the separation plane. the crossing plane was only addressed in collision conditions. IP1 (V): triplet at 14.8 -> 15.3 sigmas (collision and lumi scans IN) IP5 (H): triplet at 15.3 -> 15.8 sigmas (collision and lumi scans IN) IP1 (H): triplet at above 16.0 sigmas (squeezed, separated) IP5 (V): triplet at above 16.0 sigmas (squeezed, separated) Betatron loss maps with TCTs at collision settings + 2sigma step out: Only small losses on the TCTs, and no losses on the triplets... Loss maps show a peak in the Q10-R1. To be followed up. 05/09/2011 LHC 8:30 meeting

Probing TCT – Triplet aperture At the step of TCT gap between 14.8 and 15.3 sigmas, the losses move from the TCT to the MQX (light-orange line). BLM TCT BLM triplet TCT position Corrector = aperture bump 05/09/2011 LHC 8:30 meeting

The commissioning blocks Configuration: b* =1m, 120 mrad Xing angles. IR3+6+7 collimators at standard settings, TCTs 11.8s (IR1+5+8) Block A: Aperture at 1m and 120 mrad Block B: ALICE polarity reversal Block C: Validation = loss maps Block D: Intensity ramp up 12/30/2018 LMC - beta* 1 m

Block A : aperture check Fill 1: 1 probe/beam, checkout cycle. b* 1 m and Xing angle 120 mrad. Standard collimator settings IR6+7. TCTs IR1/5 to be adapted to 120 mrad (setup on 100 mrad). Fill 2: 2 nominals/beam, TCT alignment, orbit. TCTs IR1/5 alignment on 120 mrad, separated and in collision. Collision (re-)optimization with 120 mrad, reference orbit. End with loss map (H+V) and asynch dump. TCTs are 11.8s. Fill 3: 1 probe/beam, aperture check @ 1 m. Repeat aperture measurement at 1 m. End with a loss map H, TCTs at 14s. Fill 4: 1 probe/beam, aperture check with loss map. Loss map with TCTs at Xs, X = 13…14. 4h OK 6h OK OK, crossing plane separated beams missing* Q10-R1 ? 8h NOW 5h * Tried missing aperture measurement during last night: fill was dumped by a trip of an RQTD circuit, most likely triggered by the QFB 05/09/2011 LHC 8:30 meeting

Block A: long range BB check Fill 5: 84b with highly asymmetric BB filling pattern (also used for 1 m with 100 mrad). Bring the beam up to collisions. Verify stability and beam-beam effects. 6h Foreseen for this afternoon 05/09/2011 LHC 8:30 meeting

Block B : ALICE polarity Step 1: adjust injection, reference. ALICE on ‘old’ polarity. Injection steering with 12b, then copy to probe and check it. Step 2: revert ALICE polarity. Check/correct orbit. Check/steer injection oscillations with probe, repeat with nominal. Step 2’: re-steer TI2 if necessary. TDI coarse TL setup, TCDI alignment and verification. Step 3: TDI/TCLI alignment. TDI/TCLI alignment with 1 nominal b. Check TDI,TCLI setup – check protection. Check injection 12b. Later 2h OK 4h OK 12h 8h OK 05/09/2011 LHC 8:30 meeting

TDI alignment & angle set-up 05/09/2011 LHC 8:30 meeting

Block B : ALICE polarity continued Step 4: TCTs IR2 at injection. Setup TCTs in IR2 at injection. Step 5: Checkout cycle, 2 probes/beam. Check Xing angle IR2 along the cycle. Correct orbit if necessary. TCTs IR2 ‘open’. Step 6: TCT IR2 alignment cycle, 2 nominal b/beam. TCT alignment on flat top and in collision. Collision orbit, reference. Loss map H+V and asynch. dump. (Step 7: TCT IR2 functions, positions and interlocks ) 2h OK 4h OK 6h OK OK Setting functions for the whole operational cycle were generated. 05/09/2011 LHC 8:30 meeting

Block C Validations (loss maps, asynch dump checks) – to be confirmed with collimation team (Dp/p) Condition Betatron H Betatron V Dp/p + Dp/p - Dump Injection X Flat top ? Squeezed Collisions OK betatron and off-momentum (+500Hz) loss maps were done in physics, at betastar=1m with relaxed collimator settings. Loss maps look good. 05/09/2011 LHC 8:30 meeting

Block D: Intensity ramp up Proposed ramp up for stable beams: 48b – short fill 264 – short fill 480 – short fill 912 – long fill 1380 – finally !! Coordinators this week: Jorg Wenninger (again) & Bernhard Holzer 05/09/2011 LHC 8:30 meeting