Designing More Contractor- Friendly Storm Water Pollution Prevention Plans April 6, 2005 Joan M. Meitl
Basic Principles Schedule to minimize soil exposure Control runoff to prevent erosion Install drainage ways early in construction Keep sediment on-site Understand capabilities and limitations of BMPs
Think Like a Contractor Develop plan for contractor Include detail sheets and notes for ESC controls Include instructions on installation and maintenance Educate
Communicate Clearly Hold preconstruction conference Provide regular on-site supervision and inspection Meet to discuss problems and modify plans Provide mailbox for inspection reports or fax number where reports can be sent Provide telephone numbers for key developer and contractor personnel
Limit Chances for Erosion to Occur Minimize the amount of earth disturbed Direct runoff away from exposed soil surfaces Control water that falls onto the site Include staging
Other Pointers Cooperate with Mother Nature Include pay items for ESC work in your specs Provide money for maintenance Expect to change your plan
For Additional Information Contact Misha Vakoc, EPA Storm Water Coordinator, (206) Construction General Permit Fact Sheet Forms and Directions noi