SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Landfill transfer stations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
NDEQ Industrial Storm Water General Discharge Permit Presentation for: Nebraska Aviation Symposium January 27, 2011 By: Bill Imig, Environmental Scientist.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Developing a Stormwater Pollution Prevention Plan (SWPPP)
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Metropolitan Council Environmental Services A Clean Water Agency Info Item: Waste Discharge Rules Presented to the Environment Committee September 14,
Phase II Municipal Separate Storm Sewer System (MS4) Permits Patricia Foran & Cindy Hooper Storm Water & Pretreatment Team.
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Storm Water Permit Compliance Susan Murphy. Storm Water: To See or Not To See… We submit a Notice of Intent for Coverage (NOI) Prepare and Implement a.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
Effective October 1, 2011 New Connecticut General Permit for the Discharge of Stormwater Associated with Industrial Activity October 5, 2010 Connecticut.
MT Department of Environmental Quality (DEQ) Water Protection Bureau February 12, 2014 Christine Weaver.
What is NPDES? “National Pollutant Discharge Elimination System”
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
2014 Industrial General Permit Summary of Key Updates Order DWQ Sandy Mathews August 19, 2014.
MCM #6: Pollution Prevention and Good Housekeeping for Municipal Operations What to expect during an MS4 INSPECTION.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Stormwater Regulations
Pretreatment, Pollution Prevention and Storm Water Committee California’s Storm Water Program Bruce A. Fujimoto State Water Resources Control Board February.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
An Overview of the Proposed Multi-Sector General Permit (MSGP)
RIPDES Storm Water Program: Large and Small Construction.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Purpose of Stormwater Pollution Prevention Plans (SWP3s) for Industries Richard Smith Resource Management Conference Tulsa Garden Center March 26, 2015.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
Test Your Storm Water Knowledge!
An Overview of our Community’s Stormwater Management Program
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Urban Runoff Greg Gearheart Christine Sotelo Eric Berntsen State Water Resources Control Board.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Stormwater Pollution Prevention Program Compliance
Municipal Separate Storm Sewer System (MS4) Permit
MS4 On-site evaluations & common findings
Texas Pollutant Discharge Elimination System Stormwater Multi-Sector General Permit (MSGP) TXR Dan Siebeneicher Texas Commission on Environmental.
Summit County MS4.
EPA Public Meeting Dallas, Texas May 10, 2005
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
Rule 5 and 13 Conversion Impacts
TPDES Construction General Permit Compliance
Multi-Sector General Permit: MSGP
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
VPDES Industrial Stormwater General Permit
Presentation transcript:

SW101 The NPDES Industrial Storm Water Program

What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l Storm Water - includes storm water runoff, snow melt runoff, surface runoff and drainage l Discharge - a point source discharge from any conveyance to a municipal separate storm sewer system (MS4) or Waters of the U.S.

Storm Water Discharge Associated with Industrial Activity F Definition found at 40 CFR (b)(14)(i)-(xi) F 11 categories of industrial activities F Related to manufacturing, processing, or materials storage areas F Includes Federal, State, and municipally- owned and operated facilities

Regulated Industrial Activities F Facilities Subject to Standards (i) F Heavy Manufacturing (ii) F Mining/Oil and Gas (iii) F Hazardous Waste Facilities (iv) F Landfills (v) F Recycling Facilities (vi) F Steam Electric Power Plants (vii) F Transportation Industries (viii) F Sewage Treatment Plants (ix)

Regulated Industrial Activities: Construction F Found under Category (x) F Land Disturbance of five or more acres l Clearing, grading or excavation F Activities part of a larger common plan of development l Multiple activities within a contiguous area l Includes activities taking place on different schedules

Regulated Industrial Activities: Light Manufacturing F Found in Category xi F Identified by SIC code F Was the original No Exposure category that got challenged

What is the No Exposure Provision? F Original no exposure exemption l Only available to Category (xi) facilities with no exposure l No certification required F 9th Circuit Court Decision l Remanded for further rulemaking F Final Phase II Rule l No exposure provision – Applies to all Categories, except construction – Requires certification of no exposure

How Does the No Exposure Certification Work? F EPAs No Exposure Form asks a series of Yes/No questions to help determine if no exposure exists l May submit only if answer no to all l Applies in States where EPA is the permitting authority F NPDES-authorized States will adopt own form after updating State rules

How Do I Determine If an Industrial Facility Needs a Storm Water Permit? F Does the facility have a storm water discharge to Waters of the U.S. or an MS4? F Is the industrial activity described in the regulations? F Does the facility qualify for a conditional exemption?

ISTEA Exempted Municipally Operated Industrial Sources F Intermodal Surface Transportation Efficiency Act of 1991 F Delayed permitting for industrial activities operated by municipalities with populations less than 100,000 F Phase II set the deadline to obtain permit coverage to be no later than 3 years and 90 days from publication of the rule – March 2003

What Industrial Permit Options are Currently Available? F Individual Permit l Depends on the state in which a facility is located F General Permit l EPA permitted states: – Multi-Sector General Permit (MSGP) – Submit a Notice of Intent (NOI) for coverage l Authorized NPDES states: – Applicable general permit

EPAs Multi-Sector General Permit (MSGP) F Developed using industry-specific data from previous permit application process F Consolidated industry data into 29 industry sectors with tailored requirements F Focuses on development and implementation of storm water pollution prevention plans F Should get reissued late summer 2006

What Facilities are Eligible for Coverage Under the MSGP? F Facilities with a storm water discharge associated with industrial activity (Categories i-ix, xi) F Eligibility restrictions regarding adverse impact on Endangered Species or Historic Places

Contents of the MSGP F Notification requirements F Special conditions and requirements F Storm Water Pollution Prevention Plan (SWPPP) F Numeric effluent limitations F Monitoring and reporting F Specific requirements for industrial activities

Endangered Species Act and the MSGP F Permittees must certify on the NOI that no impacts to endangered species are likely or have previous ESA authorization for adverse effects F Addendum of MSGP l ESA certification instructions l County-by-county list of species

National Historic Preservation Act and the MSGP F Must certify: l That discharges do not affect property that is listed, or eligible for listing, under the NHPA; or l That facility can obtain, and maintain compliance with, a written agreement with the State or Tribal Historic Preservation Officer F Addendum contains guidance

Storm Water Pollution Prevention Plans (SWPPPs) F Common requirements l Planning and organization l Site evaluation l BMP identification l Implementation l Evaluation and monitoring F Sector-specific requirements F Remains onsite at facility

MSGP Monitoring Requirements F Three types of monitoring l Visual examinations l Analytical (chemical) monitoring l Compliance monitoring F Basic Regulatory Requirements l 40 CFR Part 136 methods l Representative storm event

Visual Monitoring F Quarterly examination of discharges l Color l Odor l Solids l Foam l Sheen F No analytical tests F Results submitted only if requested

Analytical Benchmark Monitoring F Required only for certain industry sectors/sub-sectors F Quarterly sampling required in years two and four of the permit l MAY CHANGE IN 2006 PERMIT F Required to submit results F Not limitations

Compliance Monitoring F Required annually for facilities subject to numeric effluent limitations F Grab samples within the first hour of discharge l Prior to mixing with other discharges F Required to submit results

Alternate Certification F Exempts facilities from analytical monitoring requirements l If no sources of a pollutant are exposed to storm water l Pollutant-by-pollutant and outfall-by-outfall basis l Not available for compliance monitoring F Certification retained onsite and submitted to the permitting authority

Representative Discharge Provision F Applicable to analytical and visual monitoring requirements l Compliance monitoring not eligible F Discharge from one outfall may represent discharge from other outfalls l Consideration of several factors l Quantitative data applies to other outfalls F Required to document in SWPPP

Sampling Waivers F Adverse Weather Conditions/ Inaccessibility/Climatic l Allows substitute samples l No prior approval required F Unstaffed and Inactive Sites l Analytical Monitoring Waiver l Visual Examination Waiver l No prior approval required F No Representative Storm Event

How Does a Facility Apply for Coverage Under the MSGP? F SWPPP in place prior to NOI submittal F Complete ESA and NHPA screening F Complete and submit NOI form l Facility information and certifications l MS4 notification l Deadlines F Use a Notice of Termination (NOT) to discontinue coverage