1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Water-to-Wire (W2W) Project Dr. Edward C. Lovelace Free Flow Power

Slides:



Advertisements
Similar presentations
2010 HPRCT Presentation – Optimized Human Error Evaluation June 23 rd, 2010 Presenter: Terry J. Herrmann, P.E. Associate, Structural Integrity Associates.
Advertisements

Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
INFSO/F3 1 The TEN-Telecom Programme Jose Soler INFSO/F3, EC TEN-TELECOM Information Day.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
EMS Checklist (ISO model)
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2.1.3: Effects on Aquatic Organisms Dr. Andrea Copping Pacific Northwest National.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Aquantis 2.5 MW Ocean-Current Generation Device- MHK Alex Fleming: PI Dehlsen.
Research and Innovation Research and Innovation Brussels, 12 November 2013 Types of Action Focus on Innovation Actions and the SME Instrument.
Roadmap for Sourcing Decision Review Board (DRB)
[Sample] Monthly Quad Chart as of MM, DD, YYYY G G Current Customer Business & Strategic Results R Yellow = Potential management action requiredRed = Management.
RISK MANAGEMENT PROGRAM AND PROJECT MANAGEMENT APPLICATION OCTOBER 6, 2006 Presented by Don Devieane, CGA, Manager Risk Management Program.
© 2011 Underwriters Laboratories Inc. Emerging Implications of DC Power & Energy Storage Ken Boyce NFPA Alternative Energy Technologies and Electrical.
State Resource Assessment (SRA) Peter Bautista WATCAC January 2012.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sacramento Municipal Utility District Slab Creek Small Hydro Project PI: Scott.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Underwater Active Acoustic Monitoring (AAM) Network for Marine and Hydrokinetic.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review M3 Wave Energy Systems (TRL System) PI: Mike Morrow M3 Wave Energy Systems.
Presentation to 2007 Tidal Energy Conference Ketchikan, AK January 24, 2007 Providing Diversity for Alaska’s Energy Future A New Source of Emission-Free.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Marine Energy Technology Advancement Partnership (METAP) Hoyt Battey DOE Water.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.
NNMREC National Marine Renewable Energy Centers Hawaii National Marine Renewable Energy Center (HINMREC) University of Hawaii Wave, OTEC Southeast National.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Advanced Anchoring Technology Dallas Meggitt Sound & Sea Technology, Inc.
1 OPSI Raleigh, NC Gas Market & Electric Integration John Lawhorn, Senior Director Policy & Economic Studies October. 8, 2013.
Program Name or Ancillary Texteere.energy.gov Wind and Water Power Technologies Office United States Department of Energy Water Power Program: Hydropower.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Deployment and Testing of the Alden Fish-Friendly Turbine by EPRI, Alden Research.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Active Acoustic Deterrence of Migratory Whales Steve Kopf, Program Manager Pacific.
NNMREC Summary for Congressman Dave Reichart April 22, 2011 Northwest National Marine Renewable Energy Center University of Washington
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Puget Sound Pilot Tidal Energy Project (TRL 7/8) Dr. Brian Polagye (for Craig.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Benchmark Modeling of the Near- field and Far-field Wave Effects of Wave Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Tools & Methods to Measure/Predict Environmental Impacts: Effects on the Physical.
ENVIRONMENTAL MANAGEMENT PLAN
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Modular Wave Energy Transfer (WET) Jane Vvedensky Shift Power Solutions
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Wave Energy Resource Assessment and GIS Database for the U.S. Paul T. Jacobson.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review ADVANCED INTEGRATION OF POWER TAKE-OFF IN VORTEX INDUCED VIBRATIONS AQUATIC CLEAN.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Near Space Systems Inc. Small Hydropower Research and Development Technology.
1 | Wind and Water Power Programeere.energy.gov Development of a wave-actuated electric power take-off device 2011 Water Power Peer Review Meeting Development.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 51-Mile Hydroelectric Power Project PI: Jim Gordon Earth By Design, Inc.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review A First Assessment of U.S. In-Stream Hydrokinetic Energy Resources Since the.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Reedsport PB150 Deployment and Ocean Test Project Dr. Philip R. Hart Ocean Power.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review WET-NZ Multi-Mode Wave Energy Converter Advancement Project Justin Klure, Program.
1 Framework Programme 7 Guide for Applicants
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
Northwest National Marine Renewable Energy Center Presentation before Washington State House Committee on Technology, Energy, and Communications Northwest.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OCGen™ Module Mooring Project Jarlath McEntee Ocean Renewable Power Company
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Ocean Thermal Energy Extraction Visualization Matthew Ascari Lockheed Martin.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review PB500, 500kW Utility-Scale PowerBuoy Project Dr. Philip R. Hart Ocean Power Technologies.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Cycloidal Wave Energy Converter TRL Advancement to Level 4 Dr. Stefan G. Siegel,
APEC ENERGY WORKING GROUP FRAMEWORK PROPOSAL FOR IMPLEMENTING ENERGY INVESTMENT RECOMMENDATIONS (November 2004).
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Ocean Currents along the United.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Poncelet Kinetics RHK100 Prototype Steven Selvaggio Whitestone Power and Communications.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review An Assessment of Lifecycle Cost in the U.S. over Time Mirko Previsic RE Vision.
OIRM Business Process Planning Overview for Business & Operations Advisory Committee May 27 – 28, 2015.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of Energy Production Potential from Tidal Streams in the United States.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices Monty Worthington.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review MHK MA\Categorizing and Evaluating the Effects of Stressors M. Grippo and I.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Assessment of the Environmental Effects of Hydrokinetic Turbines on Fish: Desktop.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Water Power Peer Review
COSA Committee Meeting
Presentation transcript:

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Water-to-Wire (W2W) Project Dr. Edward C. Lovelace Free Flow Power November 1-3, 2011

2 | Wind and Water Power Programeere.energy.gov Purpose, Objectives, & Integration Purpose: evaluate & optimize the performance, environment, and cost factors of the FFP hydrokinetic system for Mississippi River commercial deployment Problem Addressed: - limited data on practical resource potential - commercial immaturity of hydrokinetics; particularly for river applications Relevance to DOE Mission: - resource potential: addressed thru seasonal deployment, surveys, and modeling - commercialization barriers: addressed thru equipment design, electricity generation in a relevant environment, commercial systems financial analysis

3 | Wind and Water Power Programeere.energy.gov Technical Approach Technical Approach/Methods: Phase I: site identification, turbine performance, environmental effects Phase I Methods: - design, fab, test, deployment, & monitoring of generating equipment in a relevant environment - mapping analysis of river bathymetry, overlayed GIS competing use layers, and location of proposed piling arrays - field surveys of bathymetry and velocity and analysis with existing flow data - field observation data for debris, fish, and navigation

4 | Wind and Water Power Programeere.energy.gov Technical Approach Technical Approach/Methods: Phase II: development of commercial infrastructure (links with piling placement effort in Phase I) Phase II Methods: - design of piling, yoke, and cabling systems (conceptual mechanical design, loading analysis, operational analysis for normal and faulted behavior) - supply chain analysis of capital and operations cost

5 | Wind and Water Power Programeere.energy.gov Technical Approach Key Issues/Significance: To-date the key accomplishments are 1. the successful continuous electricity generation in a relevant environment. This addresses some of the concerns/risks peculiar to this market (debris, sediment, velocity) and their impact on practical generation from the resource and equipment performance, 2. contributions towards commercial project development (e.g. licensing studies) Unique Aspects: FFP is one of the few equipment and project developers focused primarily in rivers, with a piling based approach, and with a significant project pipeline in the FERC commercial licensing process

6 | Wind and Water Power Programeere.energy.gov Plan, Schedule, & Budget Schedule Initiation date: 2/15/10 Planned completion date: 2/15/12 Milestones FY10/11: –1Q11: complete USGS Conte Lab testing of turbine –3Q11: deployed turbine and floating mount test bed for in-river electricity generation Budget: Variances have been minor to account for floating mount hardware cost growth and taken from analysis budget Expended as of 7/30/11: – $815,416 DOE funds (59% of total) –$1,381,671 Cost-shared Budget History FY2009FY2010FY2011 DOECost-shareDOECost-shareDOECost-share $1,384,503 $2,318,236 (>50%)

7 | Wind and Water Power Programeere.energy.gov Accomplishments and Results Accomplishments/Significance: - the successful continuous electricity generation in a relevant environment. This addresses some of the concerns/risks peculiar to this market (debris, sediment, velocity) and their impact on practical generation from the resource and equipment performance, - contributions towards commercial project development (e.g. licensing studies) Benchmarks: turbine performance meets design expectations no performance degradation in continuous operation due to river effects steady velocity profile of resource verified (e.g. baseload capability) 4 FERC study reports completed (over 1,500 pages of work available for public review)

8 | Wind and Water Power Programeere.energy.gov Challenges to Date Challenges: cost and schedule management of floating mount test bed scheduling coordination between stakeholders and weather for in-river deployment Impact on Progress delayed in-river deployment 6 months Resolution Approaches: minor cost shifting from analytical tasks contingency planning with alternate deployment scenarios

9 | Wind and Water Power Programeere.energy.gov Next Steps Future Milestones FY12: –2Q12: complete turbine deployments –2Q12: complete piling based systems analysis Potential Future Activities: supporting negotiated study plan - in-situ deployment 4 pilings, 1 turbine/piling 6 months pre-deployment monitoring (fish & hydraulics) 12 months operational monitoring - fish testing - EMF and acoustic testing