State Waters and Stream Buffers

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Wasco County Soil and Water Conservation District 1 WASCO RIPARIAN BUFFER PROJECT Briefing for CBFWA Anadromous Fish Committee by Ron Graves.
Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (HBA) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.
Alaska Coastal Management Program (ACMP) Consistency Review Process House Resources Committee Hearing 1.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Well Permitting & Approvals
National Center for Construction Education & Research Affiliated with the University of Florida Greening the Workforce.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
401 Water Quality Certification South Carolina Department of Health and Environmental Control.
ABC Technology Project
Ag Wetland Banking A Win-Win Opportunity for MN Les Lemm Wetland Conservation Act Coordinator Minnesota Board of Water and Soil Resources January 18, 2012.
Management of Drainage Water in Illinois
Buffers and Special Water Quality Protections
Stakeholder Meeting for Focused Feedback February 10, w-swrule2-05.
MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5.
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Flood Hazard Areas & the NJPDES Rule s © 2009 Fox Rothschild Land Use and Environmental Regulation in New Jersey October 14, 2009 Flood Hazard Areas &
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Upper Merion Township’s New Storm Water Management Program
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
1 Role of Local, State and Federal Agencies in E&SC Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Requirements for Individuals.
Notices of Violation, Orders to Cease Operation and Consent Orders.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
State Waters Determination and Stream Buffers
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
BUFFERS, PERMITS, VARIANCES STREAM IMPACTS Level 1A: Fundamentals July
2016 UPDATES Level II Recertification July 2016 GESA & NPDES 1.
Level 1B Recertification July 2016
Level 1A Recertification July 2016
For Storm Water Discharges Associated with Construction Activity
Hudson Wetlands Protection Bylaw
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Stormwater Best Management Practices
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Level 1B: Advanced Fundamentals Effective August 2018
Overview of US EPA & State Manure Management Regulations
MS4 OVERVIEW 2015.
Request Permission to Proceed to the EMC for Approval of Delegation of the Neuse Buffer Program to Johnston County and Delegation of Further Approval Authority.
Presentation transcript:

State Waters and Stream Buffers Re-certification Training For Level IA Fundamentals Certified Personnel State Waters and Stream Buffers Issued May 2009

Overview What is a State Water? Who determines State Waters? Functions of State Water buffers Stream buffer requirements What if I need to do work within a State Waters buffer? Give overview of what will be covered in this 20 minute presentation

What is a State Water??? According to the GA E&SC Act of 1975, “State Waters” includes any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State, which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation. This is the definition from the E&SC Act of 1975, as amended

Who determines State Waters? In areas where there is a certified local issuing authority, State Waters determinations are made by the issuing authority. In areas where there is not a certified issuing authority, GA EPD will confirm State Waters and buffer delineations as shown on ES&PC plans. Self explanatory

Normal Stream Flow Definition Intermittent headwater streams with base flow during any period of the year will retain the 25-foot buffer protection Base Flow: The rate of discharge of a stream where the only contribution is subsurface ES&PC plan preparers and determining governments determine existence of base flow, based upon site topography, soils, and vegetation Only true stormwater ditches are exempt from stream buffer requirements. This is a feature that flows only in DIRECT response to precipitation. Refer to the “Field Guide for Determining the Presence of State Waters that Require a Buffer” when it is issued by EPD.

Defined Channel Wrested Vegetation This feature has a well defined channel, a point of wrested vegetation, and an obvious base flow component. Therefore it is a State Waters and must retain the 25’ undisturbed buffer. Wrested Vegetation

State Waters Shown on Plans State Waters and buffers properly shown on plans

Stream Buffers Rules Measured horizontally from point where vegetation has been wrested by normal stream flow or wave action 25 Feet - Warm Water streams* 50 Feet - Trout (cold) streams* Self explanatory *Local issuing authorities may require additional buffers!

Self explanatory

Picture showing the 25’ buffer measured horizontally from the point of wrested vegetation.

Picture showing the 50’ buffer measured horizontally from the point of wrested vegetation.

Coastal Areas Buffers for saltwater marshes and tidally influenced streams are measured from the marsh jurisdictional line Determined by the Coastal Resources Division of the GA DNR, pursuant to the Coastal Marshland protection Act. Self explanatory

What if I need to work in the buffer? The minimum 25’ or 50’ (Trout Streams) undisturbed State Waters buffer shall be maintained, except where the Director of GA EPD determines to allow a variance that is at least as protective of natural resources and the environment. Variances may only be issued by GA EPD, not by local issuing authorities. Be sure to obtain all necessary Federal permits (U.S. EPA, U.S. Army Corps of Engineers) Variances into the State minimum buffer can only be issued by EPD and there are no verbal variances!

Activities exempt from stream buffer variance requirements: Piping of small trout streams (average annual flow < 25 gallons/minute) Water line, sewer line crossings within 25° of the perpendicular Drainage structures on warm water streams Roadway drainage structures on warm and trout water streams These activities are exempt from applying for a variance. Here are a couple of definitions: ‘Drainage structure’ is a device composed of virtually nonerodible material, such as concrete, steel plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for storm-water management,… etc. if space allows. The structure that is placed in the buffer must meet this definition to be considered exempt. A drainage structure is not exempt unless it meets this definition. Any land disturbance associated with the drainage structure requires a variance. ‘Roadway drainage structure ‘is a device composed of virtually nonerodible material such as concrete, steel plastic or other such material (for example a bridge, culvert or ditch) that conveys water under a roadway…etc. if space allows. The structure that is placed in the buffer must meet this definition to be considered exempt. The exemption is for the roadway width only, not for buildable land.

Submitting for an GAEPD Stream Buffer Variance Stream buffer variance application and checklist of required information can be found at www.gaepd.org click on Documents Publications and Forms Watershed Protection Branch Erosion and Sedimentation Recommend consulting design professional for assistance with the variance process Contact Peggy Chambers, Michael Berry or Jean Shepherd at (404) 675-6240 with stream buffer questions. DNR Coastal Resources Division at (912) 264-7218 Here is the link for the variance application. It is highly recommended that professionals familiar with the variance application process be consulted for assistance.

Submitting for an GA EPD Stream Buffer Variance Within 60 days of receipt of a COMPLETE buffer variance application, the Division will either: Provide written comments to the applicant, or Propose to issue a variance Public notice required Just because a variance application has been submitted, it does not mean that the variance will be approved. The project may not proceed until the variance has been approved in writing by EPD.

Summary Buffers on state waters are valuable in protecting and conserving land and water resources. Some activities are exempt from stream buffer requirements i.e. drainage structures, sewer crossings, etc. All non-exempt activities within a state water buffer require a GAEPD stream buffer variance Summarize presentation

Examples

Location: Glascock County Date of Issue: July 05,2007 Cause of Order: Violations of Rules for Erosion and Sedimentation Control and General NPDES Permit for Storm Water Discharges Associated with Construction Activity/buffer encroachments   Requirement(s) of Order: Implement proper E&S controls of Erosion, Sedimentation and Pollution Control Plan, to prevent soils from reaching waters of the state; submit approvable Buffer Zone Rehabilitation Plan Settlement Amount:$40,000.00 

Location: Treutlen County Date of Issue: July 09,2007 Cause of Order: Violations of Rules for Erosion and Sedimentation Control and Water Quality Control/buffer encroachment   Requirement(s) of Order: Implement proper E&S controls of Erosion, Sedimentation and Pollution Control Plan, to prevent soils from reaching waters of the state; submit approvable Buffer Zone Rehabilitation Plan   Settlement Amount:$5,900.00 

Questions?