Operating Plans and Rates

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
EuroCondens SGB E.
Flexible Budgets, Variances, and Management Control: II
Cost Behavior, Operating Leverage, and Profitability Analysis
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
2.11.
Supported by ESRC Large Grant. What difference does a decade make? Satisfaction with the NHS in Northern Ireland in 1996 and 2006.
The 5S numbers game..
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
The Farm Bill 2013 Land Values Conference ISPFMRA Nick Paulson University of Illinois.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Break Time Remaining 10:00.
The basics for simulations
Discussion Topics Overview of Water Rates in California Legal Framework of Water Rates Water Consumption Patterns Empirical Data – City of Fresno The.
Water Distribution Systems – Part 1
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Introduction to Cost Behavior and Cost-Volume Relationships
Solve Each Question before you click
PP Test Review Sections 6-1 to 6-6
Network TV Scatter vs. Spot TV Cost Comparison A25-54 CPMs Q Q TVB Analysis of SQAD National and Local Market Cost Estimate Data 1 Updated.
1 Proposed User Rate Adjustments March 11, 2008 Kathleen Gammell Director of Public Works Operations Evaluation.
MCQ Chapter 07.
2013 Fox Park Adopt-A-Hydrant Fund Raising & Beautification Campaign Now is your chance to take part in an effort to beautify our neighborhood by painting.
® Customer Meeting February 28, ® JulAugSeptOctNovDecJanFeb Discovery – Company answers over 800 data requests and performs technical conferences.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
FY 2009 First Quarter Update & Economic Impacts on the City’s Budget December 8, 2008.
City of Miami PROPOSED Fiscal Year 2009 BUDGET. 2 Budget Focus To prepare a structurally balanced general operating budget. To provide a budget, which.
1 Town of Colchester FY 12 Budget. 2 Current Financial Challenges Vermont and the nation are coming out of a recession Expenses rarely go down.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
25 seconds left…...
Lesson Menu Five-Minute Check (over Lesson 5–5) Main Idea and Vocabulary Example 1:Estimate Percents of Numbers Example 2:Estimate Percents of Numbers.
: 3 00.
5 minutes.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Week 1.
Let’s take a 15 minute break Please be back on time.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
“Reading Measurement Scales”. MNI = marked number interval AMI = adjacent number interval.
Select a time to count down from the clock above
WARNING This CD is protected by Copyright Laws. FOR HOME USE ONLY. Unauthorised copying, adaptation, rental, lending, distribution, extraction, charging.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Long Beach Water Department Review of FY 12 Budget.
Presentation transcript:

Operating Plans and Rates City of Inglewood Water and Sewer Rate Discussion Operating Plans and Rates Public Works Department

72 five-gallon water bottles What is HCF? HCF refers to Hundred Cubic Feet. It’s how we measure water usage. So, what does it really mean? The average residence uses 15 HCF per month, which is… 11,220 gallons of water, or About 360 gallons of water per day. This is equivalent to… Areas of usage… 72 five-gallon water bottles

Why the Increase in Rates? The last rate increase was in 2003, and it was less than 3%. The system on average brings in $338,000 per month less than what it costs to operate. The proposed March increase only allows us to breakeven, and the October increase lets us begin repairs. As a comparison, in February the City of Los Angeles approved an increase of 14% for residential and 12% for commercial customers. Cumulatively, rates have increased 70% since 2003.

Proposed Water Rate Increase—Issues Raised Is this a hidden tax increase? No, this is not a tax. The cost the City pays for water has continually increased, and the City’s General Fund can not subsidize the cost. There is nothing secret or hidden. The City is following Proposition 218. Notice has been sent to all water customers as prescribed by law. Furthermore, notice was published in the local newspapers and placed on the City’s Website. Finally, today is the public hearing on the matter.

Proposed Water Rate Increase—Issues Raised Is the typical residential increase 58%? No! It’s 28% and 12%. While the proposed water rate increases for a typical household are approximately 28% ($14) and 12% ($6.60) over the next two fiscal years (March and October), some households may see higher rates because the new tiered rates charge low-volume users less than high-volume users. NOTE: The proposed rates are still 10% less than what Golden State Water charges, which is 57% higher than our current rate and slated to increase again in July of 2012.

Monthly Residential Water Bill Comparison

Water Bill Comparison: Inglewood vs. GSW Current February 2012 Items Inglewood Customer Golden State Customer   3/4" meter $9.00 $21.40 Water Use (15 hcf) $38.35 $44.48 Utility Tax / City Tax $4.74 $7.16 California PUC Fee $0.00 $1.07 Surcharge $5.75 Total $52.09 $79.86 Proposed March 2012   Items Inglewood Customer Golden State Customer 3/4" meter $12.00 $21.40 Water Use (15 hcf) $48.00 $44.48 Utility Tax / City Tax $6.00 $7.16 California PUC Fee $0.00 $1.07 Surcharge $5.75 Total $66.00 $79.86 Both consume 15 hundred cubic feet of water each month.

Water Bill Comparison: Inglewood vs. GSW Current February 2012 Items Inglewood Customer Golden State Customer   3/4" meter $9.00 $21.40 Water Use (15 hcf) $38.35 $44.48 Utility Tax / City Tax $4.74 $7.16 California PUC Fee $0.00 $1.07 Surcharge $5.75 Total $52.09 $79.86 Proposed March 2012   Items Inglewood Customer Golden State Customer 3/4" meter $12.00 $21.40 Water Use (15 hcf) $48.00 $44.48 Utility Tax / City Tax $6.00 $7.16 California PUC Fee $0.00 $1.07 Surcharge $5.75 Total $66.00 $79.86 $3 $10 $1.25 $14 Both consume 15 hundred cubic feet of water each month.

Proposed Water Rates for October (FY 2012-2013) Inglewood vs. GSW Proposed October 2012   Items Inglewood Customer Golden State Customer 3/4" meter $13.50 $23.20 Water Use (15 hcf) $52.50 $55.86 Utility Tax / City Tax $6.60 $8.59 California PUC Fee $0.00 $1.07 Surcharge $5.75 Total $72.60 $94.47 $6.60

In general, the area north of Century Blvd In general, the area north of Century Blvd., is served by the City, and south of Century Blvd., is served by Golden State Water.

Comparisons Inglewood Rates vs. Golden State Water (GSW) Rates Inglewood Current Inglewood March 2012 Inglewood October 2012 GSW Current GSW Proposed

Proposed Water Rate Increase—Issues Raised We need to defer some of these water system upgrades for a few more years until the economy picks up. This is not prudent nor advisable. This would be catastrophic depending on transmission or distribution line failure and could result in non-availability of water for several days. Additionally, since most of the pipes are 40 to 50 years old and far beyond their useful life, water quality is a big concern.

Proposed Water Rate Increase—Issues Raised The money required to build the wells can be used from the $8 million water reserve account and the $2.1 million current 2011/2012 budget line item for design and construction of two (2) wells. There is no $8 million water reserve account. There was a beginning fiscal year fund balance of $6 million. If no rate increase is approved, there will be a deficit of $3.4 million by September 30, 2012.

Proposed Water Rate Increase—Issues Raised The City sold 2,000 acre feet of water rights at $70 per acre foot, and we are buying water at $964 per acre foot resulting in a loss of $1.8 million. This is not a valid comparison. The water rights lease at $70 per acre foot is for raw water from the ground. The costs to pump it, treat it (e.g., make it usable), and transport to your home are not included. The City pumps, treats, and transports water at a cost of $700 per acre foot. Without the necessary infrastructure, the City is forced to buy water at a higher price.

Water System Condition Water pipelines and fittings were built in 1940 – 1990. We have exceeded the expected life of pipes and fittings. 30 miles of pipes are cast iron and need to be replaced. Water breaks occur in each area due to aging pipes. Leaks in different areas result in city water losses. We need to do pipeline replacement in conjunction with street projects.

Example: Leaking Pipe

Pipe After Extraction

Water System Improvement Plan Conservation Additional technologies are required to improve the system. Improvement projects are outlined in the water master plan. Conservation Replacement and improvement projects are needed to meet the water conservation plan in 2015 and 2020. Defective pipes, fittings, meters and other water transmission- related items will increase water losses.

Sewer System Overview Built in the 1920s. We have exceeded the expected life of the sewer pipes. Some pipe segments are lined but many areas have big cracks and holes, and need to be replaced. Approximately 150 miles of sewer pipe and 3,635 manholes need improvement. City spends an average of $1 million a year to maintain the system.

Questions