How long must the plant operate on peak days?

Slides:



Advertisements
Similar presentations
Storage Reservoirs for Urban Water Supply/Chapter 9 LowLift Intake Conduit Treatment High Lift ConveyanceConduit DISTRIBUTIONRESERVOIR Distribution Supply.
Advertisements

Three Key Process Measures: Flow Rate
Exponential Distribution
3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice
Module C8 Queuing Economic/Cost Models. ECONOMIC ANALYSES Each problem is different Examples –To determine the minimum number of servers to meet some.
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
National Cranberry Cooperative
INDR 343 Problem Session
Queuing Models M/M/k Systems. CLASSIFICATION OF QUEUING SYSTEMS Recall that queues are classified by (Arrival Dist.)/(Service Dist.)/(# servers) Designations.
Lesson 3: Time Worked Consumer Math: Pages 4-7.
LOGO Process Flow Measures MM – OM Session 2a Henry Yuliando.
Queuing Models Basic Concepts
Queuing Models Economic Analyses. ECONOMIC ANALYSES Each problem is different Examples –To determine the minimum number of servers to meet some service.
Histograms & Summary Data.  Summarizing large of amounts of data in two ways: Histograms: graphs give a pictorial representation of the data Numerical.
Simulating Single server queuing models. Consider the following sequence of activities that each customer undergoes: 1.Customer arrives 2.Customer waits.
QUEUING MODELS Queuing theory is the analysis of waiting lines It can be used to: –Determine the # checkout stands to have open at a store –Determine the.
24 Hour Clock Activities.
24 Hour Clock Grade 6 Math.
Problem 3.4 MBPF A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At his or her.
Slide - 1 Dr Terry Hinton 6/9/05UniS - Based on Slides by Micro Analysis & Design An example of a Simulation Simulation of a bank: Three tasks or processes:
The Essence of Process Flow Process Measures
Operations management using System Dynamics Part II.
Modeling the Grocery Checkout System COP 4232 © Dr. David A. Workman School of Electrical Engineering and Computer Science October 3, 2005.
ENERGY SYSTEMS YEAR 13 Physical Education. By the end of today you will Be able to:  Understand and explain how ATP is used to create energy  Explain.
OPSM 405 Service Operations Management
1 3. Process Flow Measures A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At.
Process Scheduling, Resource & Inventory Tracking.
MINGZHE HAN (CMP TUTOR) COMM 204 Review Session. Outline T ABLE OF C ONTENT (Basic Information) (Process Analysis) (Multiple Types and the Product Process.
Homework Assignment Simulation Modeling The Cobbler Problem MGMT E Operations and Logistics Management Due September 25 th.
Matching Supply with Demand: An Introduction to Operations Management Gérard Cachon ChristianTerwiesch All slides in this file are copyrighted by Gerard.
Trauma center moves to diversion status once all servers are busy (incoming patients are directed to other locations) Figure 7.1.: Process flow diagram.
1 By: Prof. Y. Peter Chiu POM Chap-8: Scheduling ~ Homework Problems ~
 Recall your experience when you take an elevator.  Think about usually how long it takes for the elevator to arrive.  Most likely, the experience.
Famous Frank’s Queuing Michael Dettloff- Sam Ross Marc
Introduction to Transportation Systems. PART III: TRAVELER TRANSPORTATION.
Topic V. Multiple-Channel Queuing Model
HOW CAN I USE A CLOCK TO HELP TELL ELAPSED TIME? UNIT 7 CONCEPT: MCC.4.MD.1 Elapsed Time.
PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014)
12hour and 24hour time Can you convert the times?
Key Learnings: Little’s Law
Example: A Hospital Emergency Room
Preview Warm Up California Standards Lesson Presentation.
Queuing Models Economic Analyses.
Pipeline Design Problems
Exam 3 Review MATH 140: David Gerberry.
Created by Mr. Lafferty Maths Dept.
FLOOD ROUTING Topic 5 River/Stream Routing Muskingum Method.
Process Analysis Guanyi Lu September 18, 2018.
Time Revision.
Every minutes one customer comes in and one customer leaves.
IV-2 Manufacturing Systems modeling
MATS Quantitative Methods Dr Huw Owens
Derivatives are slopes…
R’(45) represents the slope of the curve at t = 45.
Liquid-Liquid Extraction
Floods and Flood Routing
Problem 8.3 John Doe has promised a total service time of 20 minutes. Processing time at the oven = 15 min Preparation = 2 min At most 3 minutes waiting.
Flood Routing.
MDP / DHU - DR Usage vs downlinks -
Capacity rate = 100 customers/hour Input Rate Customers/hour Time 12pm 2pm 10am Capacity rate = 100 customers/hour Inventory Waiting.
A film starts at 13:45 and lasts for 1 hour and 35 minutes
Goal: Solar and Lunar Eclipses
Do you have the time to review?
Secondary My sleep diary Name: __________________
B-Trees.
GATORADE MX Production
Aim: Full House Grid: 9 Grid Play: Calculate answer & cross it off
Elapsed Time Using Benchmarks.
Presentation transcript:

How long must the plant operate on peak days? 3.7 How long must the plant operate on peak days? From 7am-6pm, oranges come in at a rate of 10,000kg/hr and are processed, and thus leave the plant, at 8000kg/hr. Because inflows exceed outflows, inventory will build up at a rate of DR = 10,000-8,000kg/hr = +2,000 kg/hr. Because we cannot have oranges stored overnight, we start with an empty plant so that inventory at 7am is zero: I (7 am) = 0. Because inventory builds up linearly at 2,000kg/hr, the inventory at 6pm is I(6pm) = 2,000 kg/hr * 11 hr = 22,000kg.

3.7 After 6pm, no more oranges come in, yet processing continues at 8000 kg/hr until the plant is empty. Thus, inflows is less than outflows so that inventory is depleted at a rate of DR = 0 - 8,000 kg/hr = - 8,000 kg/hr. Thus, since we have that I(6pm) = 22,000kg, we know that inventory depletes linearly from that level at a rate of -8,000 kg/hr. Thus, to empty the plant, inventory must reach zero and this will take an amount of time Dt where: 22,000 kg = 8,000 kg/hr Dt or Dt = 22,000/8,000 hr = 2.75 hr = 2 hr 45min. Thus, the plant must operate until 6pm + 2hr 45min = 8:45pm. This can all be graphically summarized in the inventory build up diagram shown below.

3.7 b) At what point during the day must a truck first wait before unloading into the storage bin? Inventory builds up in the bins. When the bin is full, then the trucks must wait. This happens at: 2,000 kg/hr Dt = 6,000kg, The first truck will wait after Dt = 6,000/2,000 hr = 3 hr, which is at 10am. c) What is the maximum amount of time that a truck must wait? The last truck that arrives (at 6pm) joins the longest queue, and thus will wait the longest. It will be able to start dumping its contents in the bins when the bins start depleting. This is at 22,000 kg - 8,000 kg/hr Dt = 6,000. Dt = (22,000-6,000)/8,000 hr = 2 hr, after 6pm. The maximum truck waiting time is therefore 2 hours, and that is 8pm.

3.7 e) Among trucks that wait, how long is the average wait? Procedure1: The first truck among those that wait, will wait for 0 hour. The last truck among those that wait, will wait for 2 hours. On average a truck waits for (0+2)/2 = 1 hour Procedure2: The maximum inventory is 22,000. But 6000 of it is in the bin. So the waiting inventory on trucks has a maximum of 22,000 – 6,000 = 16,000 Therefore, the average inventory for those trucks that wait is 8,000. This inventory is depleted at the rate of 8000/hrs I = RT 8,000 = 8000T T = 8000/8000 = 1 hour

3.7 d) How long a truck wait on the average? The average wait among trucks that wait is 1 hour. But this is for the last 8 hours of the day. In the first 3 hours no truck waits. Therefore the average wait is 0 hour. Therefore, the average wait among all trucks is (3×0 + 8×1)/11 = 0.727 hour or 43.6 minutes

Truck Inventory 16 Bin capacity 6,000 kg 7 am 10 am 6 pm 8 pm