LAL meeting on e+ studies, Oct. 2010

Slides:



Advertisements
Similar presentations
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Advertisements

KEK : Novel Accelerator TYL Workshop M. Yoshida, M. Nozaki, K. Koyama, High energy research organization (KEK) -Collaboration -IZEST (CEA) :
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Proposal for Japan-US collaboration on New Test Facility for Novel Accelerator R&D (FACET at KEK) M. Yoshida, K. Nakajima, M. Sato, S. Matsumoto, M. Nozaki,
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
K.Furukawa, Apr , Super B-factory Workshop SuperKEKB Injector Linac 1 Injector Linac Kazuro Furukawa, for e – /e + Linac Group Present Status Upgrade.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
1 Positron Target R&D at KEK Plan and Status AD&I Meeting 2009/8/27 KEK Hybrid Target Test at KEKB Linac Liquid Lead Target Test at ATF Linac Window Test.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Study of High Intensity Multi-Bunch  -ray Generation by Compton Scattering ATF TB 28/May/2006 presented by Tsunehiko OMORI (KEK) on behalf.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Injector Commissioning Masanori Satoh (Accelerator Laboratory, KEK) for the Injector Linac Commissioning Group The 20th KEKB Accelerator Review Committee,
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
K.Furukawa, KEK, Nov Injector Linac Progress towards SuperKEKB Progress of Injector Linac Kazuro Furukawa for Injector Linac 1.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Status of the CLIC main beam injectors LCWS, Arlington, Texas, October 22 th -26 th, 2012Steffen Döbert, BE-RF Overview of the CLIC main beam injectors.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Capture and Transport Simulations of Positrons in a Compton Scheme Positron Source A. VIVOLI*, A. VARIOLA (LAL / IN2P3-CNRS), R. CHEHAB (IPNL & LAL / IN2P3-CNRS)
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
MAX IV linac overview and scope of automation Sara Thorin.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
SABER Longitudinal Tracking Studies P. Emma, K. Bane Mar. 1, 2006
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
S.M. Polozov & Ko., NRNU MEPhI
Expected hardware status and Priority of the commissioning task
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Injector Linac Experiences at KEKB / SuperKEKB
Positron Sources of Next generation B-factories (SuperKEKB, SuperB)
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Test of Hybrid Target at KEKB LINAC
Sara Thorin, MAX IV Laboratory
Injector and positron source scheme. A first evaluation Thanks to O
Status of the CLIC main beam injectors
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
Tango status at Elettra
Utilization of KEKB for ILC R&D
Junji Urakawa (KEK) for ATF International Collaboration
Injection facility for Novosibirsk Super Charm Tau Factory
SuperB project. Injection scheme design status
CLIC source update CLIC main beam injectors reminder
Overview of SRF system of Ring and Linac (1)
Capture and Transmission of polarized positrons from a Compton Scheme
Electron Source Configuration
CEPC Injector Damping Ring
CEPC Injector positron source
LCLS Commissioning Parameters
WBS 5.0 LCLS Strategic Projects Division
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Linac/BC1 Commissioning P
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
High Charge Low Emittance RF Gun for SuperKEKB
J. Seeman Perugia Super-B Meeting June 2009
Kicker and RF systems for Damping Rings
CEPC injector beam dynamics
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
SuperKEKB required (e+ / e-)
Electron mode A B C D > 4 GeV e- θ g e- DR α PS
Presentation transcript:

LAL meeting on e+ studies, 25-26 Oct. 2010 Prospect for KEKB linac operation -Present status and near future- 26 October 2010 Tsuyoshi Suwada Accelerator Laboratory, KEK Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

LAL meeting on e+ studies, 25-26 Oct. 2010 Introduction The KEKB operation has been finished in the end of June 2010. It was decided to approve the Super KEKB project in KEK in the end of June based on “the Funding Program for Next Generation World-Leading Researchers” established within the Japan Society for the Promotion of Science (JSPS). One third in total budget required for whole the construction was approved. Discussions for the upgrade and R&D plans towards the Super KEKB have been started just now. It is expected that the channeling experiments will be considerably disturbed during the construction of the Super KEKB. Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

experimental site KEKB LINAC Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010 3

Super KEKB Accelerator Complex Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

Mission of Injector Linac for four rings towards Super KEKB project Ring Energy Charge [GeV] [nC] PF (w top-up ope.) e- 2.5 0.1 PF-AR (w/o top-up ope.) e- 3 0.2 (w top-up ope.) ? e+? 4? 0.2 SKEKB (KEKB) LER e+ 4(←3.5) 4(←1) SKEKB (KEKB) HER e- 7(←8.0) 5(←1) Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

Linac Parameter change key upgrade parameters are in red letters Based on Kamitani, SuperKEKB Review 2010 Linac Parameter change key upgrade parameters are in red letters KEKB Achieved (e+/e-) SuperKEKB Required (e+/e-) beam energy 3.5 GeV / 8.0 GeV 4.0 GeV / 7.0 GeV stored current 1.6A / 1.2A 3.6A / 2.62A beam lifetime 150 min / 200 min 10 min / 10 min bunch charge 10 -> 1.0 nC / 1.0 nC 10 -> 4.0 nC / 5.0 nC # of bunches 2 / 2 beam emittance (ge)[1s] 2100 mm / 300 mm 10 mm / 20 mm energy spread sE/E 0.125 % / 0.05 % 0.07 % / 0.08 % bunch length sz 2.6 mm / 1.3 mm 0.5* mm / 1.3 mm e+ primary e– e+ e– primary e– e– Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010 *(assuming bunch compression after DR)

LAL meeting on e+ studies, 25-26 Oct. 2010 Injector Upgrade idea (e-) High intensity Low emittance Photo-cathode RF gun (e+) High intensity Low emittance AMD matching device (or Superconducting coil) + L-band Large-aperture capture section Damping Ring ( e–& e+ ) Misalignment, RF kick, CSR Alignment, etc. (PF, PF-AR) Pulse-by-pulse switching Timing control Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

LAL meeting on e+ studies, 25-26 Oct. 2010 Present KEKB Injector Based on Kamitani, SuperKEKB Review 2010 e– B A Pulse-by-pulse beam switching for HER, LER & PF Target bypass bump orbit (5 mm height) Compatible optical setting for different beam energies Switching of RF phases, ACC/DEC/STDBY timings & gun parameters Independent orbit control with pulse steerings for PF 2.5 GeV 0.1nC x 1 A1 gun 1.7 GeV @J-arc for HER 8.0 GeV 1nC x 2 C 1 target bypass bump orbit 2 3 4 5 3T gun moved from CT C-band module for AR 3.0 GeV 0.1nC x 1 e+ 10nC electron drive beam hit target at 4GeV 10% yield from electron to positron for 1nC positron Positron to be accelerated to 3.5GeV A1 gun B A for LER 3.5 GeV 1nC x 2 4.0 GeV 10nC x 2 C 1 2 3 4 5 e+ target & S-band capture section ECS (Energy-spread Compression System) Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

LAL meeting on e+ studies, 25-26 Oct. 2010 SuperKEKB Injector Based on Kamitani, SuperKEKB Review 2010 e– B A low emittance RF gun for PF 2.5 GeV 0.1nC x 1 RF gun emittance growth ? in e– / e+ beams 1.7 GeV @J-arc for HER 7.0 GeV 5nC x 2 C 1 2 3 4 5 target bypass bump orbit e- bypass line for DC separation bend for AR e– or e+ ? e+ Present A1 gun for 10nC e– beam Damping ring A1 gun 1.1 GeV@DR B A Nominally S-band acceleration 160MeV / RF unit (nominal) + 8m C-band at 4-4 Target moved to 1-4 for e+ energy margin new matching dev. & L-band capt. section for e+ intensity upgrade for LER 4.0 GeV 4nC x 2 C 1 2 BCS ECS 3 4 5 3.5 GeV 10nC x 2 e+ target, matching dev. & L-band capture section C-band module x 2 ECS (Energy-spread Compression System) Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

Injector upgrade gross plan (not yet fixed) JFY2010 JFY2011 JFY2012 JFY2013 JFY2014 KEKB oper. HER, LER upgrade SuperKEKB commissioning DR component fabrication DR tunnel construction Conflicting items Installation DR building construction DR commissioning 1 Apr. 2011 31 Jan. 2012 DR-Inj Connection No beam delivering 8-GeV beam delivering under limited condition e+ matching device R&D e+ matching device & capture section construction e+ beam commissioning L-band and LAS development L-band & LAS module construction RF-gun & laser system design study @A1&elsewhere e- beam commissioning Full-spec RF gun and laser Establish at A1 A1 gallery extension Laser alignment study Actual alignment system Keep PF, AR injection with 3T gun and/or A1 gun, then add SuperKEKB from JFY2014 Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

LAL meeting on e+ studies, 25-26 Oct. 2010 Summary Discussions on the construction & R/D plans for the upgrade of the KEKB injector towards the Super KEKB has been started just now (October 2010). The tentative plan has been now developed and maybe it will be fixed by the end of 2010. A lot of R&D works will start soon. It is expected at least that the channeling experiments are not available during the term from 1 Apr. 2011 to 31 Jan. 2012, and even after this term it will be considerably limited for the use of 8-GeV electron beams up to the start of the commissioning which will be scheduled at the middle of FY2013. The next scheduled chance to perform the experiment is the beginning of Jan. 2011. Another chance is not clear at present. Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010

KEKB Accelerator Complex (+PF, AR) Tsuyoshi Suwada/KEKB Linac LAL meeting on e+ studies, 25-26 Oct. 2010