EVLA Computing Reorganization

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Jordan Goodman HAWC Review - December 2007 HAWC A Wide-Field Gamma-Ray Telescope Jordan A. Goodman University of Maryland.
 Information Infrastructure 5 Major Components: - Computer Hardware - General Purpose Software - Networks and Communication Facilities - Databases -
EVLA Computing Schedule, Staffing, Testing, Tracking.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Portal and Proposal Submission Review of SSS Software Readiness for SRO, June 5, 2009 Bryan Butler EVLA Computing Division Head.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
Status of Computing at PDR B.E. Glendenning (NRAO), G. Raffi (ESO)
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Committee, 11 June EVLA Phase II Implementation/Funding P. Napier.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Post-processing Overview Bryan Butler, for Joe McMullin.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
EVLA Software - Overview Bryan Butler NRAO. Bryan ButlerEVLA NSF Review 2006May History of EVLA Computing (1) EVLA computing consists of three parts:
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
Committee Charge Fred K.Y. Lo
Monitor and Control Software
EVLA Overall Software Design
EVLA Computing Software Overview.
Budget, Schedule, Contingency
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
Welcome Introduction of Panel members Charge to Panel
NRAO Computing Re-organization
EVLA Advisory Committee Meeting
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
NRAO End to End Integrated Operations
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
Presentation transcript:

EVLA Computing Reorganization Gustaaf van Moorsel September 8, 2003

EVLA Computing Org Chart 12/9/2018 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Integrated Product Teams Project subsystems allocated to IPTs Goal: strengthen M&C/e2e coordination In one division under common management At one location Typical IPT is mix of M&C and e2e IPT formation under way. Examples: Observing Layer Overall Design Antenna M&C 12/9/2018 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Widen Scope Need wider focus in some areas: Archiving Proposal handling Pipeline Those IPTs coordinated by Interferometry Software Division (ISD) Strong involvement from EVLA Computing 12/9/2018 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

EVLA Advisory Committee Meeting Personnel Resources Soc Ops EVLA ISD total Soc Ops budget 1.7 7.3 0.0 9.0 EVLA budget 4.0 ISD budget 1.0 11.3 14.0 12/9/2018 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003

Questions to Committee Does current structure meet our needs? Can we afford to widen the e2e scope to include other NRAO telescopes? 12/9/2018 Gustaaf van Moorsel EVLA Advisory Committee Meeting September 8-9, 2003