HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.

Slides:



Advertisements
Similar presentations
Underground Storage Tanks at Duke Duke Medical Center –8 permitted USTs located on medical campus –Range in size from 2,000 gallons to 30,000 gallons Proper.
Advertisements

ABC Chemical Complex1 Pipeline Repair ABC Company ABC Chemical Complex Engineering Specification.
Drew Hevle. NACE Houston Section Principal Corrosion Engineer
ABC Chemical Complex1 PIPELINE SPECIFICATIONS ABC Company ABC Chemical Complex Engineering Specifications.
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
Above Ground Storage Tanks &
Pipeline Operator Qualification Regulations 49CFR Part 192, Subpart N (Gas)49CFR Part 192, Subpart N (Gas) 49CFR Part 195, Subpart G (Liquid)49CFR Part.
Call Before you dig Safe digging is no accident. Alberta Damage Prevention Council.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
Subpart R Steel Erection
NPMA Alan Watson Alexandria May 2012 Tank foundations Presenting
Petroleum Equipment Institute
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
POWERPOINT PRESENTATION
Gas Transmission Pipelines
1 Resources for Integrity Management Marty Matheson, American Petroleum Institute OPS Public Meeting August 8, 2001 Houston, TX.
COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Louisiana State Police Emergency Services Unit. The Emergency Services Unit is comprised of: Explosives Control Explosives Control HazMat HazMat Right-to-Know.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
HOUSTON, TEXAS1 Corrosion Control and Monitoring ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Regulation of Pipelines
ABC Chemical Complex1 Maintenance of DOT Regulated Valves ABC Company ABC Chemical Complex Engineering Specification.
Hazardous Liquid Pipelines
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
Other Construction Projects
Reducing the Threat of Fuel Release from the Red Hill Fuel Storage Facility A Unique Engineering Challenge.
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
1 Twelve Steps to Engineering Safe Oil and Gas Facilities Based on SPE By: Jim Johnstone and Jim Curfew – Contek Solutions LLC Presenter: Mike Leonard.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
HOUSTON, TEXAS1 Hazardous Liquid Pipelines ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
RAILROAD COMMISSION OF TEXAS Steven Rios Corpus Christi Area Manager September 2015.
HOUSTON, TEXAS1 Pipeline Repair ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Pipeline Safety Trust Fort Worth Natural Gas Production Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
MODULE 6 Vehicle Parking, Servicing, and Security.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
HOUSTON, TEXAS1 Maintenance of DOT Regulated Valves ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
TRENTON Casing Filler Presentation
PIPELINE SPECIFICATIONS
The work of CEN/TC 305 Potentially explosive atmospheres-
RAILROAD COMMISSION OF TEXAS Chairman David Porter Commissioner Christi Craddick Commissioner Ryan Sitton September 15-17, 2015.
Pipeline Safety Different Pathways to a Common Goal New Orleans, Louisiana November 4 th & 5 th, 2010.
Transportation Systems
JSC CTC Metallokonstruktsiya Corrugated structures.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
The Pipeline Safety Trust “Restoring Trust In Pipeline Safety” New Orleans, LA November 2-3, 2006 Nate Muehl Damage Prevention & ROW Relations Manager.
1Fall FALL PROTECTION. 2Fall CONTENTS  Introduction  Purpose  Same Level Falls  Lower Level Falls  Fall Prevention  Summary.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
Marine Dock Facilities. Marine Dock Facilities Project Experience  Design and inspection of construction of New Oil Docks – Port of CC  Rehabilitation.
Portable Tanks TCIU ACROLEIN INHIBITED Acrolein Stabilized
Grounding the Electrical System
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Melissa Holbrook Cell:
Maintenance of DOT Regulated Valves
PIPELINE SPECIFICATIONS
Grounding the Electrical System
Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.
Excavation.
SD INTRASTATE PUBLIC EDUCATION
TRENTON Casing Filler Presentation
Factors to Consider when Designing a Reliable Power Grid
Locating Gas Structures
Corrosion Control and Monitoring
Field Testing for Shorted Casings
PIPELINE SPECIFICATIONS
ABC Company ABC Chemical Complex Engineering Specification
Gas Transmission Pipelines
Maintenance of DOT Regulated Valves
SD INTRASTATE PUBLIC EDUCATION
Presentation transcript:

HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification

HOUSTON, TEXAS2 Pipeline Protection During Construction/Repair Activities u SCOPE AND INTENT –Scope »Provides requirements for protection of LCCC pipelines during construction and repair activities performed by the Company, Company contractors, or other owner-users of the right-of-way. –Intent »Provide engineering methods to prevent damage to pipelines and pipeline components (above and below ground).

HOUSTON, TEXAS3 Pipeline Protection During Construction/Repair Activities u REFERENCES –ANSI B31.4, Hazardous Liquid Pipelines –ANSI B31.8, Gas Transmission Pipelines –API RP 1102, SteelPipelines Crossing Railroads and Highways –API RP 1109, Marking Liquid Petroleum Pipeline Facilities –LCCC Engineering Specification, Corrosion Control and Monitoring

HOUSTON, TEXAS4 Pipeline Protection During Construction/Repair Activities u DEFINITIONS –Carrier pipe –Casing pipe –Load Bearing Devices –Pipeline Markers –Protective Barriers –Louisiana One Call –Pipe Pad

HOUSTON, TEXAS5 Pipeline Protection During Construction/Repair Activities u GENERAL REQUIREMENTS –Markers for Buried Pipelines »Design and install in accordance with API RP »Place directly above the pipeline whenever possible. »Place along the pipeline at designated intervals, at all road crossings, river crossings, at all entrances to the pipeline right-of-way, and at any change in direction of the pipeline. »Use adequate number of markers to allow other right-of-way owner-users to locate pipe by line of sight.

HOUSTON, TEXAS6 Pipeline Protection During Construction/Repair Activities u GENERAL REQUIREMENTS (Continued) –Protective Barriers »Locate barriers to protect above ground equipment such as regulator stations, metering stations, and vent pipes. »Design barrier locations to allow free access to vehicular traffic on the right-of-way, if necessary.

HOUSTON, TEXAS7 Pipeline Protection During Construction/Repair Activities u GENERAL REQUIREMENTS (Continued) –Load Bearing Devices »Use heavier wall pipe in lieu of load bearing devices if possible. »Concrete tiles are preferred to steel casing. »Specify 3000 psi concrete for concrete tiles. »Specify red color for concrete tiles. »Specify tile width to be at least 1.5 x pipe diameter. »Install tiles at least 1.5 x pipe diameter above the top of the pipe.

HOUSTON, TEXAS8 Pipeline Protection During Construction/Repair Activities u GENERAL REQUIREMENTS (Continued) –Preventing accidental damage to other owner- users equipment »Use Louisiana One Call to locate and mark buried pipelines. »Call other owner-users and ask them to locate and mark their underground pipelines.

HOUSTON, TEXAS9 Pipeline Protection During Construction/Repair Activities u GENERAL REQUIREMENTS (Continued) –Review and follow instructions in the Company Warehousing and Purchasing Procedure for handling materials of construction during transportation. –Review and follow instructions in the Company Corrosion Control and Monitoring Specification for handling pipe, coating material, and consumables during construction.