ASU Solar: Lessons Learned Presented by Robert W. Vandling.

Slides:



Advertisements
Similar presentations
A Path breaking Technology for Network Maintenance and Optimization
Advertisements

Medford Aquatic Center Plan for Energy Efficiency and Solar resources.
Arizona State University – A Leader in Solar “…be the change you want to see in the world…” Mahatma Gandhi Bonny Bentzin Director, University Sustainability.
NEMA. 2 Utility Metering vs. Submetering 10/11/2014 New PowerPoint Template Utility Meter Meter provided by utility with the purpose of measuring.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
HYDRAULICS & PNEUMATICS
Arc Flash: Electrical Safety in the Workplace CCIA Safety Committee SAFETY ROUNDTABLE April 10, 2012 sm 1.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
LAFA Food Distribution July 26, Introduction:
A presentation by the Boswell High School Environmental Club.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
Boxborough and Littleton Solar Program Training 5/15/15 Arnie Epstein – “Solar Coach” Stow Solar Challenge
Photovoltaic “Parallel System” for Duke Farms Group Members Trecia Ashman Paola Barry Mukti Patel Zarina Zayasortiz.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Lesson 25: Solar Panels and Economics of Solar Power
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
ELECTRICITY GENERATION FROM SPEED BREAKER
Electricity: What’s the connection?
Electro-Pneumatics Module 1
Genesis Solar Module Brochure ™
AZ APA Conference September 29, 2011 Solving a Solar Land Use Issue Bruce Plenk, City of Tucson Solar Energy Coordinator.
THE ELECTRIC SUB STATION
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Photovoltaics. Agenda What is PV? System Types Mounting Options Product Options System cost & performance System sizing considerations Advantages of PV.
By A.D.Thirumoorthy Tamil Nadu Electricity Board India.
South Australian Centre for Renewable Energy TAFE SA Regional Whyalla Campus.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
1 Implementation of the Solar RPS in New Jersey ABA Renewable Energy Panel November 16, 2005 Jan Pepper.
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Solar energy a global warming solution By, Shane Horn “I’d put my money on the sun and solar energy. what a source of power! I hope we don’t have to wait.
Electrical Power Systems
PV System Components Advanced Engineering The Technology Landstown High School.
MARK HARNETT VP Complete Solar. PART ONE: Incentives & Industry Tiers.
Business Networking Function – 2 nd July 2015 Proudly Sponsored by:
Converting to Solar Energy on College Campuses Alyson Rae McGonigle
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Electricity Basics: An Introduction to Renewable Energy Remy Pangle Center for Wind Energy James Madison University.
Utility Engineers, PC.  Generation  Transmission  Distribution.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Steady State Analysis Of A Microgrid Connected To A Power System
We hear much about energy problems; supply shortages, pollution issues and high prices, but the solutions to these problems are here now in the form of.
Distributed Generation Registration June 30, 2008.
V3 vs. v4 New Protocols for LEED Tommy Linstroth, Principal.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
Tampa Electric Company
PHY 202 (Blum)1 More basic electricity Non-Ideal meters, Kirchhoff’s rules, Power, Power supplies.
19.2 Domestic electricity Paying for electrical energy  Most of the electrical appliances in your home use mains electricity.  Mains electricity: alternating.
Series and parallel resistances pg. 51. Objectives Calculate the equivalent resistance for resistors connected in both series and parallel combinations.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Session 13 (R) Case Study – Residential System Design, Construction, Operation, and Analysis February 24, 2016.
What Will We Do If Our Oil Supply Runs Out?. What Will We Do Click here to get an answer! If Our Oil Supply Runs Out?
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
Medors.in DESCRIPTION Off-grid refers to not being connected to a grid generally National grid Off-the-grid homes are autonomous, they do not rely on.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Practical Testing Issues Real Life Issues Bob Beavers June 12,
Photovoltaic and Battery Primer
Solar information Session
Photovoltaic Systems Engineering Session 26
The Management of Renewable Energy
Net Metering – Solar Roof Top Solution
Associated Hazards and Safety Practices
PEPCO Energy here Used there
The Joint Accounting Conference 2018
Photovoltaic Systems Engineering Session 22
Simple, accurate tenant sub-metering
Presentation transcript:

ASU Solar: Lessons Learned Presented by Robert W. Vandling

Introduction Here at the Tempe Campus, ASU is currently producing 1.88 MW of Solar power. PS1 = 880 kW DC PS2= 30 kW DC PS5= 711 kW DC Lattie Coor= 108 kW DC BioDesign= 150 kW DC

Introduction As you might have imagined, we had many challenges and obstacles to overcome to make this happen. The following is a brief overview of some of the lessons we learned from this endeavor.

Lessons Learned 1) The original RFP focused on rooftops for our Solar installations. Our parking structures proved to be a better place to start due to their high output as well as the age of our roofs were in question.

Lessons Learned 2) One of our more challenging issues proved to be Time. All of our projects, except for BioDesign, were originally set for completion by the end of Unfortunately, only Parking Structure 5 met this goal while PS1 and Lattie Coor each had challenges of their own. PS1 – Late start do to the construction of PS5 Lattie Coor – Personnel issues with the subcontractors BioDesign – Logistics of access to a secure facility. Per APSES: Different buildings have different challenges associated with them. Specifically, the available construction hours at BioDesign are subject to the security protocol of the building which only allows contractors to work 8 hours a day. This eliminates the possibility of accelerating the schedule through longer workday and/or overtime.

Lessons Learned 3) Electrical Feeders RADIAL Each Feeder has only one source energized at a time If the breaker opens, the feeders source is lost The Customer takes an outage until APS switching can occur NETWORK – Two Source Circuit A network is two or more sources operated in parallel to a common bus If a switch opens, then only one source is lost Power is still supplied to the load by the other source

Lessons Learned 3) Electrical Feeders… cont. APS had concerns of our generation be greater than our load. At the West Sub, a NETWORK fed sub, the concern was raised that we would generate more than the load of the sub. As such, we had to create a Trip Signal system wherein APS could signal ASU to drop any and all generation affecting that sub. RADIAL fed sub stations are not a concern to APS in regards to damaging their gear to necessitate a trip signal system.

Lessons Learned 4) Metering Issues ASU requires the use of their own metering system to verify energy production of solar array. The owner of the system also requires these numbers as does APS. Hence, 3 separate meters were installed since both APS and ASU try and secure access to their meters. Owner = pulls data right from the inverters & their meters APS = their own electric meter ASU = Veris CT meters

Lessons Learned 5) LEED Certification With the BioDesign facility, APSES noted that If the solar system has a certain system size criteria in order to qualify for LEED points, you want to double check the available roof space can support the system size.