Why a Bus Fee Increase is Needed Texas States current bus contract expires the end of fiscal year 2014 (August 2014). – 10 year bus contract plus one extension.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Fill in missing numbers or operations
Buckeye Local School District State of the District August 05, 2008.
Insure Montana Small Business Health Insurance Program The Small Business Health Care Affordability Act, was requested by State Auditor John Morrison and.
The Center for a Changing Workforce 1 Everyday Low Benefits: Health Insurance in the Age of Wal-Mart The Center for a Changing Workforce Seattle, WA.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Medicaid and CHIP: On the Road to Reform Cindy Mann, JD CMS Deputy Administrator Director Center for Medicaid, CHIP and Survey & Certification Centers.
Motor Vehicle Fleet Performance Audit Jeff A. McMahan, CFE Oklahoma State Auditor & Inspector NSAA Annual Conference 2005 Wrightsville Beach, NC.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Superintendents Recommended Budget: FY Rockingham County Public Schools March 23, 2010.
Supported by ESRC Large Grant. What difference does a decade make? Satisfaction with the NHS in Northern Ireland in 1996 and 2006.
Budget Public Hearing and Budget Adoption Ralph Fortunato Director of Fiscal Services August 28, 2013.
1 Board of Selectmen FY2009 Municipal Operating Spending Plan *Includes Projections/2010 & 2011 *Includes School Requested Amounts.
SUPPLEMENTAL LEVY ELECTION TUESDAY, MAY 17, 2011 Joint School District No. 2.
Unit 11 Insurance North Carolina Driver and Traffic Safety Education Association 1 INSURANCE UNIT 11.
Problem1; Admission Flow
0 1 Best Location The location for geology Located in the northeastern side of Yongkang, Tianan Country The area for industry North to 5km for STSP West.
Construction Impacts Overview of Policy Changes Shuttle Changes Enforcement Faculty/Staff Changes Visitor & Event Parking Changes Resident Student Changes.
Port Authority Update March 15, 2012 Ryan Wolfe Director of Campus Services.
The basics for simulations
An Impact Analysis of Electrifying Florida’s Public Buses
Operating Plans and Rates
Rhode Islands Caseload Reduction Credit in the Temporary Assistance for Needy Families (RI Works) Program FFY12 [ffy11 data]
Housing California California Tax Credit Update William J. Pavão, Executive Director California Tax Credit Allocation Committee 1.
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Introduction to Cost Behavior and Cost-Volume Relationships
Houston ISD Board Workshop March 29, 2012 Performance Audit Report- Contract Recommendation Awards Process Presented by:
Labour market in Midi-Pyrénées EKS Labour market in Midi-Pyrénées EKS Slovakia 21/01/2013.
2013 LID LIFT PRESENTATION. OBJECTIVES DISCUSS ESTABLISHED PROGRAMS. DISCUSS CURRENT CHALLENGES THE DISTRICT IS FACING. PROPOSED PLAN TO OVERCOME DISCUSSED.
Town of Plattsburgh Street Light 2012 Proposal. Sold to Municipalities starting in 1950 Extra Energy was in the grid during off peak hours. NYSE&G began.
MCQ Chapter 07.
NEFE High School Financial Planning Program Unit Three – Investing: Making Money Work for You Investing: Making Money Work for You Investing: Making Money.
Presented to the Board of Trustees March 10, 2010 Financial Indicators.
® Customer Meeting February 28, ® JulAugSeptOctNovDecJanFeb Discovery – Company answers over 800 data requests and performs technical conferences.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Virginia Department of Conservation and Recreation Adopting a Local Program in Accordance with the Revised Stormwater Regulations Appomattox County February.
Sprayer Economics Gary Schnitkey University of Illinois.
Lombard Odier Investment Managers The best way to benefit from the long term out performance of Small & Mid Caps in the European market. Fund Objectives.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Paramus Public Schools 2010 – 2011 Budget Public Hearing Presentation Ms Shelia Criscione, Board President Mr. Anthony Balestrieri, Chairman, Finance Committee.
2 Texas Education Code – Sec   Funding For Certain Excess Undergraduate Credit Hours Texas Education Code – Sec   Appropriations (Doctoral.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
Michigan’s Transportation Funding Act
Pennsylvania Targeted Industry Program (PA-TIP) 1.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
McKinney Vento Transportation Update (Switch from Taxis to Buses) Andrea Foster, SUSD Homeless Liaison Arturo Basurto, SUSD Transportation Director.
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
Subtraction: Adding UP
10b.1 Van Horne and Wachowicz, Fundamentals of Financial Management, 13th edition. © Pearson Education Limited Created by Gregory Kuhlemeyer. Chapter.
Static Equilibrium; Elasticity and Fracture
North Carolina Consortium Renewal Rates April 16, 2012.
Articulation & Transfer Report: AY Tennessee Higher Education Commission Fall Quarterly Meeting November 20, 2014.
Budget Projections April 22, What Will Be Covered Tonight? Update on state legislature and public school funding Preliminary.
Apprenticeship Grant for Employers of 16 to 24 year olds (AGE 16 to 24) Employer Update Presented by Insert presenters name and title Insert date of presentation.
Western ND School District Funding Information Session July 17, 2013 Comfort Inn Bismarck, ND New State School Funding Model ND Department of Public Instruction.
Patient Survey Results 2013 Nicki Mott. Patient Survey 2013 Patient Survey conducted by IPOS Mori by posting questionnaires to random patients in the.
2007 COOPERATIVE INSTITUTIONAL RESEARCH PROGRAM (CIRP) First-Year Student Survey Profile Administered August 2007 West Chester University of Pennsylvania.
FEDERAL STUDENT AID AND COMMUNITY COLLEGE STUDENTS Sandy Baum George Washington University Graduate School of Education and The Urban Institute North Carolina.
May 15, 2009 Texas A&M University - Corpus Christi Fiscal Forum 1.
Transportation Services Budget February 4, 2010 Josh Davis, Director 1.
Rod Weis, Texas A&M University Lana Wolken, Texas A&M University Joe Richmond, University of North Texas Operating Your Own System Versus Contracting.
Transport.tamu.edu TAMING WILD BRONCOS Transit Management Changes, Financing, Training, Staffing Rod Weis, Texas A&M University Lana Wolken, Texas A&M.
Presentation transcript:

Why a Bus Fee Increase is Needed Texas States current bus contract expires the end of fiscal year 2014 (August 2014). – 10 year bus contract plus one extension year

Texas State currently pays $72.42/hour for the cost of service to the contractor. This does not include cost of: – diesel – Texas State staff to monitor the service (one full time manager, 50% for a Director, 50% for Administrative Assistant, student wages) – NextBus system – administrative fee collected by Texas State on every auxiliary account The student fee is currently $78.00

The Board of Regents tuition and fee policy precluded any increases in fees for fiscal year 2014 which covers 9/1/2013-8/31/2014. This resulted in: – A May 2012 motion to increase the bus fee from $78 to $95 for fall 2014, pending a successful student referendum. The legislative cap is $100. – The proposed $95 fee is based on a report from the Texas Transportation Institute at Texas A&M. It is believed the best rate per hour we can expect to receive in a new contract will be 20% higher. ($72.42 x 1.2 = $86.90).

A Request for Proposals (RFP) process is needed to occur to obtain a new contract. – The tuition and fee policy was not announced in time to allow for responses to an RFP to be returned and analyzed by the May 2012 Board of Regents meeting – It would not have been fair to the students to hold a referendum in the summer. – The RFP process began in February 2013 with proposals returned in March 2013 – The new contract will go to the May 2013 Board of Regents meeting for approval – The new contract goes into affect August 2014 – Companies need one year lead time to purchase, outfit and paint the bus fleet

The tuition and fee policy also resulted in a one year extension of the current bus contract (August 2013-August 2014) because of the timing. The minimum increase for the contract extension will be 3.25%. The extension rate is estimated to be $74.77/hour

Many of the current service level problems resulted because: – The age of the current fleet - leading to excessive down time for maintenance and repair (have exceeded their useful life in years), (are at 75% of their useful life in years), (are at 50% of their useful life in years), (used for BTI, in one year have used 12% of useful life in miles, will exceed their useful life in 8 years instead of 12 if the BTI was continued) – Lack of sufficient number of trained drivers (bus contractor penalized $112,500 for missed laps due to no drivers from August thru November)

– The loss of a years service on one of the BTI buses (owned by Texas State) as a result of an accident in November Contractor brought in 3 MCIs for the BTI route that were no longer under contract in Minneapolis. No contractor will purchase additional buses at the end of a contract because they cannot recoup their expense Cost of a bus for in town use is $325,000 Cost of a bus for highway use is $680,000 – Construction on and around the campus (having to reroute the buses south of campus)

What can you expect to get under a new contract with a fee increase? New fleet (fleet costing approximately $13M) 60,000 service hours (current contract is at 51,000 service hours excluding the BTI, resulting in 9,000 more local service hours, or 17.5% increase, or 5 more buses) Point-to-point service from the Quad to the Mill Street Lot and back (no stops) Restoration to the Campus Loop route of service to the Speck Street Lot and Speck Garage

If a fee increase is not approved, what can you expect? Drop in service hours Elimination of Saturday routes 0.1% passenger boardings at $24.49 cost per passenger boarding Elimination of night routes 0.8% passenger boardings at $4.45 cost per passenger boarding Elimination of the Wonder World route 271,143 passenger boardings as opposed to the average of 395,385 of the routes Elimination of the new point-to-point service to Mill Street Lot Elimination of the restored service on the Campus Loop route to the Speck Lot and Speck Garage Modification to other routes (fewer buses per route and/or less frequent service)