and news about our activities

Slides:



Advertisements
Similar presentations
Project Perfect Pty Ltd Project Administrator Overview of Software.
Advertisements

Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Label production Solution with Label Gallery programs Label Gallery is used for general label design and print GalleryForm is used to create data entry.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Plans for next year COSMO General Meeting, 21 September.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
12-13 July 2011, University of Rome "La Sapienza" Rome, Italy pSHIELD Consortium Meeting Przemyslaw Osocha, SESM,
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
SPM review COSMO General Meeting, 13 September 2012.
Deutscher Wetterdienst Status of the COSMO-Web Page COSMO Working Group 6: Reference Version and Implementation Web Page Administrator: Theodore Andreadis.
KICK-OFF MEETING AGENDA Paris, April 13-14, 2005.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
1 Short Report of 28 th Meeting of the COSMO Steering Committee (STC) Rome, 5 September 2011 Detlev Majewski, Head of STC Deutscher Wetterdienst, Offenbach,
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
WG 6 and Support Activities Plans for the next Year.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
10° General Meeting Adriano Raspanti - WG5 – VERSUS PL.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
Session 10 – Summary and Closing remarks
New task within PT Support Activities “Support of COSMO licensees”
Build and Test system for FairRoot
Report from the Scientific Project Manager
Overview on the Work of WG 6
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
ITE Roundabout Task Force
The COSMO Coding Standards Some Highlights
Status of the COSMO-Software and Documentation
Summary of WG6 activities
PT Evaluation of the Dycore Parallel Phase (EDP2)
Working Group Chairs Forum Lunch
PP POMPA status Xavier Lapillonne.
Jerusalem, 14th of September 2017 Andrzej Wyszogrodzki
19th COSMO General Meeting, September 2017, Jerusalem, Israel
Hannah Short CERN, Computer Security
Introduction With TimeCard users can tag SharePoint events with information that converts them into time sheets. This way they can report.
Experience with Maintaining the GPU Enabled Version of COSMO
Managing The Scheduler
External Projects related to WG 6
WG4: interpretation and applications A success story… to be continued… Pierre Eckert MeteoSwiss, Geneva.
Essnet on Methodology for Modern Business Statistics
Implementation of a general tracer treatment
Discussion HPC Priority project for COSMO consortium
20th COSMO General Meeting, 3-7 September 2018, St. Petersburg, Russia
GRIB2 and ecCodes in the COSMO-Model
COSMO-Model New Versions and Plans
PP COLOBOC Final Report
SCA Report for the COSMO-Model
Targeting Wait Statistics with Extended Events
G.Cosmo - URD improvements Gabriele Cosmo (CERN/IT-API)
WG3b Activities A proposal
Status update and testing
Ulrich Schättler Source Code Administrator
The COSMO Coding Standards Some Highlights
Preparing a new Model Version according to Source Code Management
Overview of WG3a activities Upper air physical aspects
TGg Report to the IEEE Working Group
The migration to the new EDAMIS
Activities of WG7 Chiara Marsigli.
Support Activities and WG 6 Overview Status Report
Lunar Calibration Workshop Status of the preparation
PP CARMA Common Area with Rfdbk/MEC Application
Presentation transcript:

and news about our activities Introduction and news about our activities Massimo Milelli & many others 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Agenda Monday PARALLEL SESSION WG6 – Room Hadas (myrtle) Hall (+5) 09:00 - 09:10 M. Milelli, Introduction and overview 09:10 - 09:40 U. Blahak, SCA reports: INT2LM 09:40 - 10:30 U. Schättler, SCA reports: COSMO, grib2 10:30 - 11:00 All COFFEE 11:00 - 11:20 M. Milelli, Web page update 11:20 - 11:40 A. Montani, COSMO LEPS update 11:40 - 12:00 C. Barbu, B. Maco, User Support activities/FAQ page 12:00 - 12:30 D. Cesari, New COSMO setup in Italy 12:30 - 14:00 All LUNCH 14:00 - 14:30 Z. Piotrowski, New PP COSMO-EULAG on GPU 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Agenda Monday PARALLEL SESSION: COSMO Developers Workshop – Room Hadas (myrtle) Hall (+5) 14:30 - 16:00 All, Discussion 16:00 - 16:30 All REGISTRATION with COFFEE PARALLEL SESSION: NWP Test Suite (WG6/WG5 joint) – Room Tapuach (apple) Hall (+3) 16:30 - 17:30 All, Discussion 17:30 All ICE BREAKER 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Agenda Tuesday PARALLEL SESSION: PP POMPA (WG6/WG2 joint) – Room Shezif (plum) Hall (+1) 14:30 - 14:20 X. Lapillonne, M. Baldauf, Evaluation of the Dycore Parallel Phase (EDP2) PT : final report 14:20 - 14:40 P. Spörri, X. Lapillonne, Status of the COSMO-POMPA PP 14:40 - 15:00 U. Schättler, Experience with maintaining the GPU enable version of COSMO 15:00 - 15:20 M. Alemanno, Running the GPU version of COSMO at COMET 15:20 - 15:40 X. Lapillonne, The ENIAC project: Enabling the ICON model on heterogeneous architectures 15:40 - 16:00 O. Fuhrer, The COSMO PASCHA project : task parallelism in COSMO 16:00 - 16:30 All COFFEE 16:30 - 16:50 Z. Piotrowski, Status of the COSMO-EULAG Gridtools port 16:50 - 17:30 All, General discussion: future HPC project in the COSMO Consortium 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Reporting Newsletter: July 2017 (5 contributions) Technical Reports: A Turbulence Kinetic Energy - Scalar Variance Turbulence Parameterization Scheme, D. Mironov and E. Machulskaya (TR30) CALMO - Progress Report, P. Khain, I. Carmona, A. Voudouri, E. Avgoustoglou, J.-M. Bettems, F. Grazzini and P. Kaufmann (TR31) Calibration of COSMO Model, Priority Project CALMO Final report, A. Voudouri, P. Khain, I. Carmona, E. Avgoustoglou, J.M. Bettems, F. Grazzini, O. Bellprat, P. Kaufmann and E. Bucchignani (TR32) V.A.S.T. (Versus Additional Statistical Techniques) User Manual (v2.0), N. Vela (TR33) Common plot activity 2016-2017 TRs from PP CORSO, PP COTEKINO and PP KENDA are pending 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Main web updates after the meeting in March Added filters to publication list (by year and by WG topic) Newly organised Software page New FTE summary tables for PPs and PTs In the main home menu (left side), under “Documentation/Release Notes” now the files misc.global are available (better visibility) PP pages and Events page updated PT pages added in the main home menu (left side) SMC repository added to the “User Support/Repository” page 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Still to be done… There is an idea to include COSMO-LEPS maps (presentation/discussion later) Improvement of the “User Support/FAQs” page (presentation/discussion later) Documentation of TERRA to be included (public wiki) but DWD internal discussion is (still ?) needed To include info about licensees in “Operational” pages Need to update “Operational” pages Comprehensive grib2 page 11/09/2017 – 19th COSMO General Meeting, Jerusalem

One more slide The NWP Test Suite future has to be clarified urgently. There will be a dedicated meeting together with WG5 and anybody else interested in the afternoon PP POMPA has been extended until December 2017 PT EDP2 is closed (info by Xavier) There is a new WG6 PP about COSMO-EULAG on accelerators (PP CEL- ACCEL) by Z. Piotrowski (presentation later) 11/09/2017 – 19th COSMO General Meeting, Jerusalem

Thanks for your attention and for your work ! 11/09/2017 – 19th COSMO General Meeting, Jerusalem