Nick Walker (DESY) EU GDE Meeting Oxford

Slides:



Advertisements
Similar presentations
Nick Walker KEK-DESY meeting 7 th March 2005.
Advertisements

Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
ILC Accelerator Technical Issues Nick Walker LCWS 2005 Stanford University
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC-BCD: Cavity Package International Linear Collider - Baseline Configuration Document: Cavity Package DESY -MPY-
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
1 Main Linac Design Chris Adolphsen GDE SLAC April 6-7, 2006 MAC Review at FNAL.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
SRF Industrialization American Region Laboratory Plans Bob Kephart IPAC10/GDE industrialization Kyoto, May, 2010.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Lutz Lilje DESY -MPY- SCRF Infrastructure at CERN? Electron Accelerator R&D for the Energy Frontier Lutz Lilje DESY –MPY-
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
ILC Main Linac Chris Adolphsen SLAC
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Status and plans for the 3.9 GHz section of XFEL
WP5 Elliptical cavities
Rongli Geng Jefferson Lab & GDE
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Chris Adolphsen Sergei Nagaitsev
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Progress in Asia Hitoshi Hayano,KEK,
ILC Global Design Effort
Highlights from EU Global Design Effort
Barry Barish GDE Caltech
Main Coupler R&D at DESY
High gradients in TESLA nine-cell cavities
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

Nick Walker (DESY) EU GDE Meeting Oxford 25.10.2005 European XFEL Nick Walker (DESY) EU GDE Meeting Oxford 25.10.2005

EURO-XFEL 21.09.2005

ILC Projected Time Line 2005 2006 2007 2008 2015… 2010 2012… GDE process Baseline Config. Document (BCD) Ref. Design Report (RDR) + $€¥ TDR construction synergy EU FP7 ?? commissioning physics EURO XFEL preparation construction operation 21.09.2005

20 GeV SCRF linac Primary focus: consolidate basic TTF technology successful tech. transfer to industry cost reduction through industrialisation need extensive effort to achieve high reliability !!! High-Gradient programme continues to be a priority for TESLA Tech. Collaboration Both as part of the ILC and XFEL projects 21.09.2005

TESLA 9-Cell Cavity R&D Established after 10 years R&D Leak check Frequency Tuning Damage Layer Removal Furnace treatments Final Frequency Tuning Final Surface Preparation Final Cleaning Bake-out 120-130° C Low-Power Acceptance Test Tank Welding Assembly for High-Power Operation High-Power Testing Established after 10 years R&D Emphasis on QA/QC Reliable transfer to industry 21.09.2005

Electropolishing @ DESY Results from DESY & KEK Q0 Eacc MV/m New cavity production (30 cavities) will be put through EP Significant increase in statistics Specification / fine tuning of EP parameters (→ XFEL) → Module 6 (35 MV/m cryomodule) High gradient programme also part of XFEL R&D 21.09.2005

Cavity R&D R&D within Europe funded by XFEL project Fabrication from large grain or single-crystal Nb discs May remove the need for electropolishing ( cost!) JLAB (P. Kneisel) DESY DESY R&D within Europe funded by XFEL project Mentioned also single-crystal 21.09.2005

Cavity Package Auxiliaries INFN blade tuner SACLAY tuner (type III) TTF TYPE-III HP Coupler industrialisation – cost – reliability 21.09.2005

Fabrication of TTF-3 Couplers number of couplers machining & welding ceramic TiN coating copper plating final e-beam welding 10 prototypes Desy FNAL Industry 12 first series 40 second series 62 TTF-3 couplers have been fabricated to date 52 in industry 21.09.2005

(XFEL) Coupler Industrialisation Ongoing study at Orsay, France TTF-3 (baseline) XFEL coupler 4 diagnostics removed Motorized tuning 21.09.2005

(XFEL) Coupler Industrialisation Ongoing study at Orsay, France XFEL coupler Reduced part count Design simplification Tolerance studies Assembly processes Mounting sequences 21.09.2005

LLRF 21.09.2005

Lorentz Force Detuning Compensation 21.09.2005

LLRF 21.09.2005

Cryomodule (CM) Variants Main European emphasis is on - industrialisation - reliability - cost optimisation TTF CM already 3rd generation 21.09.2005

The FNAL Modulator 3 modulators have been developed, built and delivered to TTF by FNAL since 1994 They are continuosly in operation under different operation conditions 7 modulators have now been constructed by European Industry Baseline ILC recommended baseline FNAL Modulator at TTF 21.09.2005

Baseline Klystrons Specification: 10MW MBK 1.5ms pulse 65% efficiency Thales CPI Toshiba Baseline ILC recommended baseline 21.09.2005

Summary XFEL preparation pushing SCRF R&D linac tech. R&D in Europe Industrialisation Cost reduction Reliability Much overlap with ILC XFEL specs. and ILC baseline very similar High-gradient programme remains part of XFEL programme 21.09.2005