TOWERS CRESCENT BUILDING B Mike Synnott Structural.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
The Pennsylvania State University Architectural Engineering Structural Emphasis Advisor: Dr. Andres Lepage Steven Stein ROOSEVELT ISLAND SOUTHTOWN BUILDING.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Structural Focus 2007 Senior Thesis Capstone Project Advisor: Prof. Kevin Parfitt University of Rochester Biomedical Engineering / Optics Building River.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
1776 WILSON BOULEVARD ARLINGTON VIRGINIA Penn State University Senior Thesis 2012 Faculty Advisor: Thomas Boothby Joshua Urban Structural Option.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008 introduction overview proposal goals depth.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Ryan Johnson - Structural Option
Acterna Headquarters John M Sekel Germantown, Maryland
the Franklin Square Hospital Center
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
TOWERS CRESCENT BUILDING B
Presentation transcript:

TOWERS CRESCENT BUILDING B Mike Synnott Structural

OVERVIEW Site Information Historical Breadth Existing Structure Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt OVERVIEW Site Information Historical Breadth Existing Structure Proposal Design for Gravity Design of Lateral Resistance Cost Analysis Conclusion

Site Information Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Site Information

Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Location: Vienna, Virginia 9 Stories Height – 122’ 9” Occupancy - Retail/Office 1 of 3 Buildings On Site Red – Towers Crescent Original building Blue – Building B Green – Building C Buildings B & C Based off Original Building

History Breadth Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt History Breadth

Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Original Towers Crescent Building  Original Site Plan to have 3 Identical Buildings Total Square Footage – 450,000 sf/Building New Design to Create 5 Smaller Buildings Total Square Footage – 900,000 sf 2 of the 5 Buildings Built, 1 in Design, 2 in Planning Design of Building B Based Off Original Building Due To Architectural Importance, Height Of Building B Not Considered in Analysis

Philip Johnson Architect of Original Building Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Philip Johnson Architect of Original Building Designer of Such Buildings as: The Glass House – 1949 Crystal Cathedral – 1980 AT&T Headquarters – 1984 Transco Tower – 1983 Transco Tower AT&T Headquarters Crystal Cathedral The Glass House

Existing Structure Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Existing Structure

Floor System: Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Floor System: 210’ x 110’ Footprint 2 Typical Bay: 40’ x 30’ 30’ x 30’ Composite Steel Floor 2” Metal Deck 3 ¼” Slab Shear Studs to Transfer Load

Lateral Resistance System Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Lateral Resistance System Steel Braced Frames 4 Frames North/South Direction 2 Frames East/West Direction Limits Drift to 1.5” < 3.68” Allowable Drift North/South Frames East /West Frames

Proposal Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Proposal

Design 2 Alternate Structures and compare to Existing Structure Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Design 2 Alternate Structures and compare to Existing Structure First Alternate Structure: Column Layout Same As Existing Structure Two Way Concrete Flat Slab Beams Spanning Between All Columns Two Way Post Tensioning Shear Walls

Second Alternate Structure: Addition Row of Columns Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Second Alternate Structure: Addition Row of Columns Two Way Concrete Flat Slab Drop Panels Shear Walls Resisting Lateral Loads

Design for Gravity Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Design for Gravity

First Alternate Structure Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt First Alternate Structure Floor System Typical Bays: 40’ x 30’ 30’ x 30’ 9”, Post Tensioned, Flat Slab Interior Beams – 16” x 18” Exterior Beams – 24” x 24”

Post Tensioning Longitudinal Tendons Lateral Tendons Spaced 10’ O.C. Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Post Tensioning Lateral Tendons Spaced 5’ O.C. 15 Strands Along Beams 2 Strands Between Beams Profile Points: At Ends - 17.5" At Mid-span - 3" Longitudinal Tendons Spaced 10’ O.C. 25 Strands For Most 27 For 40’ Spans Profile Points: At Ends - 21" At Mid-span - 3.5"

Column Design Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Column Design

Second Alternate Structure Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Second Alternate Structure Floor System Typical Bay: 30’ x 27.5’ 7” Flat Slab 7” Drop Panels

Column Design Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Column Design

Design of Lateral Resistance Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Design of Lateral Resistance

Both Alternate Structures Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Both Alternate Structures Shear Walls Located Around All Openings in Slab 12” Thickness Total Drift – 0.79” < 3.68” Allowable Drift Deflection of North/South Facing Walls Deflection of East/West Facing Walls

Cost Analysis Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Cost Analysis

Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Construction Times Existing Structure – 51 Days Alternate 1 – 135 Days Alternate 2 – 126 Days

Conclusion Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Conclusion

When Not Considering Height Changes: Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt When Not Considering Height Changes: Not Considered due to Architectural Constraints Existing Structure Most Efficient Design Lowest Cost Shortest Construction Time Simple Design When Considering Height Changes: Ignoring Architectural Constraints Second Alternate Structure Most Efficient 18” per floor saved - 13'-6" Total Much Lower Overall Cost ~ $45 million vs. $48 million

Questions? Towers Crescent Building B Mike Synnott Structural Option Advisor – Kevin Parfitt Questions?

1st Alternate Structure 2nd Alternate Structure