Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6: Developing a Project Plan
Project Management 6e..
Developing the Project Plan
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Time Management
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Finding the Critical Path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Project Management CPM/PERT Professor Ahmadi.
Developing a Project Plan
Project Scheduling: Lagging, Crashing, and Activity Networks
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Quick Recap.
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
3 Project Management PowerPoint presentation to accompany
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
PSSA Preparation.
Introduction to Management Science
3 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
WEEK 4 Introduction to Project Management 1. Communication Plan Objectives Objective is to determine: ◦ Who needs to know what? ◦ How will they be told?
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Chapter 3 Project Management. Chapter 3 Project Management.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
University of Mediterranean Karpasia
Chapter 3 (Continued) Outline Recap CPM (continued)  Assign time estimates to each activity  Compute the longest time path through the network.
Project Management Chapter 13
6. Project Management.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
Operations Management
Operations Management
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 13-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 13.
MANA 705 DL © Sistema Universitario Ana G. Méndez, All rights reserved. W6 6.2 Operation Management Operation Management Managing Projects Techniques.
3 Project Management PowerPoint presentation to accompany
Project Management. Learning Objectives  Discuss the behavioral aspects of projects in terms of project personnel and the project manager.  Discuss.
3 - 1© 2011 Pearson Education 3 3 Managing Projects PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global Edition Principles.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall  Complex and temporary task of many related activities. (not ‘business as usual’)  May.
1 Project Management Seminar Project Scheduling. 2 Importance of Project Management Three Components of Project Management Project Evaluation and Review.
3 Project Management PowerPoint presentation to accompany
WEEK 4 Introduction to Project Management. Agenda Phase 2: Planning ◦ Communication Plan ◦ Scheduling Preparation  Build an AON Diagram  Determine Critical.
© 2006 Prentice Hall, Inc.3 – 1 Operations Management Chapter 3 – Project Management Chapter 3 – Project Management © 2006 Prentice Hall, Inc. PowerPoint.
Project Management Techniques
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Time Planning and Control Activity on Node Network (AON)
OPSM 301 Operations Management Class 18: Project Management: Introduction and CPM Koç University Zeynep Aksin
Operations Management Project Management Chapter 3.
© 2007 Pearson Education Project Management. © 2007 Pearson Education Bechtel Group, INC.  Bechtel is a $16.3 billion-a-year construction contractor.
3 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 3 3 Project Management PowerPoint presentation to accompany Heizer and Render Operations.
Operations and Project Management Session 3 Extra Some Additional Details on CPM and PERT.
Project Management Project Controlling
Learning Objectives When you complete this chapter, you should be able to : Identify or Define: Work breakdown structure Critical path AOA and AON Networks.
Time Planning and Control Activity on Node Network (AON)
Projects: Critical Paths
Project Scheduling Network Optimization can be used as an aid in the scheduling of large complex projects that consist of many activities A project is.
3 Project Management PowerPoint presentation to accompany
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Time Planning and Control Activity on Node Network (AON)
Presentation transcript:

3 Project Management PowerPoint presentation to accompany Heizer and Render Operations Management, 10e Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl © 2011 Pearson Education, Inc. publishing as Prentice Hall

Examples of Projects Building Construction Research Project © 2011 Pearson Education, Inc. publishing as Prentice Hall

Project Management Activities Planning Objectives Resources Work break-down structure Organization Scheduling Project activities Start & end times Network Controlling Monitor, compare, revise, action © 2011 Pearson Education, Inc. publishing as Prentice Hall

Project Management Techniques Gantt chart Critical Path Method (CPM) Program Evaluation and Review Technique (PERT) © 2011 Pearson Education, Inc. publishing as Prentice Hall

A Simple Gantt Chart Time J F M A M J J A S Design Prototype Test Revise Production © 2011 Pearson Education, Inc. publishing as Prentice Hall

PERT and CPM Network techniques Developed in 1950’s CPM by DuPont for chemical plants (1957) PERT by Booz, Allen & Hamilton with the U.S. Navy, for Polaris missile (1958) Consider precedence relationships and interdependencies Each uses a different estimate of activity times © 2011 Pearson Education, Inc. publishing as Prentice Hall

Six Steps PERT & CPM Define the project and prepare the work breakdown structure Develop relationships among the activities - decide which activities must precede and which must follow others Draw the network connecting all of the activities © 2011 Pearson Education, Inc. publishing as Prentice Hall

Six Steps PERT & CPM Assign time and/or cost estimates to each activity Compute the longest time path through the network – this is called the critical path Use the network to help plan, schedule, monitor, and control the project © 2011 Pearson Education, Inc. publishing as Prentice Hall

A Comparison of AON and AOA Network Conventions Activity on Activity Activity on Node (AON) Meaning Arrow (AOA) A comes before B, which comes before C. (a) A B C A and B must both be completed before C can start. (b) A C B B and C cannot begin until A is completed. (c) B A C Figure 3.5 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Determining the Project Schedule Perform a Critical Path Analysis The critical path is the longest path through the network The critical path is the shortest time in which the project can be completed Any delay in critical path activities delays the project Critical path activities have no slack time © 2011 Pearson Education, Inc. publishing as Prentice Hall

Determining the Project Schedule Perform a Critical Path Analysis Activity Description Time (weeks) A Build internal components 2 B Modify roof and floor 3 C Construct collection stack 2 D Pour concrete and install frame 4 E Build high-temperature burner 4 F Install pollution control system 3 G Install air pollution device 5 H Inspect and test 2 Total Time (weeks) 25 Table 3.2 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Determining the Project Schedule Perform a Critical Path Analysis Activity Description Time (weeks) A Build internal components 2 B Modify roof and floor 3 C Construct collection stack 2 D Pour concrete and install frame 4 E Build high-temperature burner 4 F Install pollution control system 3 G Install air pollution device 5 H Inspect and test 2 Total Time (weeks) 25 Earliest start (ES) = earliest time at which an activity can start, assuming all predecessors have been completed Earliest finish (EF) = earliest time at which an activity can be finished Latest start (LS) = latest time at which an activity can start so as to not delay the completion time of the entire project Latest finish (LF) = latest time by which an activity has to be finished so as to not delay the completion time of the entire project Table 3.2 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Determining the Project Schedule Perform a Critical Path Analysis A Activity Name or Symbol Earliest Start ES Earliest Finish EF Latest Start LS Latest Finish LF Activity Duration 2 Figure 3.10 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Forward Pass Begin at starting event and work forward Earliest Start Time Rule: If an activity has only a single immediate predecessor, its ES equals the EF of the predecessor If an activity has multiple immediate predecessors, its ES is the maximum of all the EF values of its predecessors ES = Max {EF of all immediate predecessors} © 2011 Pearson Education, Inc. publishing as Prentice Hall

Forward Pass Begin at starting event and work forward Earliest Finish Time Rule: The earliest finish time (EF) of an activity is the sum of its earliest start time (ES) and its activity time EF = ES + Activity time © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper ES EF = ES + Activity time Start © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper 2 EF of A = ES of A + 2 ES of A A 2 Start © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper Start A 2 3 EF of B = ES of B + 3 ES of B B 3 © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper Start A 2 C 2 4 B 3 © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper Start A 2 C 2 4 D 4 3 = Max (2, 3) 7 B 3 © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper Start A 2 C 2 4 D 4 3 7 B 3 © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES/EF Network for Milwaukee Paper Start A 2 C 2 4 E 4 F 3 G 5 H 2 8 13 15 7 D 4 3 7 B 3 Figure 3.11 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Backward Pass Begin with the last event and work backwards Latest Finish Time Rule: If an activity is an immediate predecessor for just a single activity, its LF equals the LS of the activity that immediately follows it If an activity is an immediate predecessor to more than one activity, its LF is the minimum of all LS values of all activities that immediately follow it LF = Min {LS of all immediate following activities} © 2011 Pearson Education, Inc. publishing as Prentice Hall

Backward Pass Begin with the last event and work backwards Latest Start Time Rule: The latest start time (LS) of an activity is the difference of its latest finish time (LF) and its activity time LS = LF – Activity time © 2011 Pearson Education, Inc. publishing as Prentice Hall

LS/LF Times for Milwaukee Paper 4 F 3 G 5 H 2 8 13 15 7 D C B Start A 13 LS = LF – Activity time LF = EF of Project 15 © 2011 Pearson Education, Inc. publishing as Prentice Hall

LS/LF Times for Milwaukee Paper 4 F 3 G 5 H 2 8 13 15 7 D C B Start A LF = Min(LS of following activity) 10 13 © 2011 Pearson Education, Inc. publishing as Prentice Hall

LS/LF Times for Milwaukee Paper LF = Min(4, 10) 4 2 E 4 F 3 G 5 H 2 8 13 15 7 10 D C B Start A © 2011 Pearson Education, Inc. publishing as Prentice Hall

LS/LF Times for Milwaukee Paper 4 F 3 G 5 H 2 8 13 15 7 10 D C B Start A 1 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Computing Slack Time After computing the ES, EF, LS, and LF times for all activities, compute the slack or free time for each activity Slack is the length of time an activity can be delayed without delaying the entire project Slack = LS – ES or Slack = LF – EF © 2011 Pearson Education, Inc. publishing as Prentice Hall

Computing Slack Time A 0 2 0 2 0 Yes B 0 3 1 4 1 No C 2 4 2 4 0 Yes Earliest Earliest Latest Latest On Start Finish Start Finish Slack Critical Activity ES EF LS LF LS – ES Path A 0 2 0 2 0 Yes B 0 3 1 4 1 No C 2 4 2 4 0 Yes D 3 7 4 8 1 No E 4 8 4 8 0 Yes F 4 7 10 13 6 No G 8 13 8 13 0 Yes H 13 15 13 15 0 Yes Table 3.3 © 2011 Pearson Education, Inc. publishing as Prentice Hall

Critical Path for Milwaukee Paper 4 F 3 G 5 H 2 8 13 15 7 10 D C B Start A 1 © 2011 Pearson Education, Inc. publishing as Prentice Hall

ES – EF Gantt Chart for Milwaukee Paper A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 © 2011 Pearson Education, Inc. publishing as Prentice Hall

LS – LF Gantt Chart for Milwaukee Paper A Build internal components B Modify roof and floor C Construct collection stack D Pour concrete and install frame E Build high-temperature burner F Install pollution control system G Install air pollution device H Inspect and test 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 © 2011 Pearson Education, Inc. publishing as Prentice Hall