ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)

Slides:



Advertisements
Similar presentations
Draft Design Guidelines to Accommodate Peds and Bikes at Interchanges Meghan Mitman Fehr & Peers August 15, 2011.
Advertisements

Revisions to Chapter 2B – Regulatory Signs, Barricades, and Gates.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
The State Route 246 Central Avenue Ext. and Purisima Road Traffic Study May 2008.
West Contra Costa Unified School District
Los Angeles County Metropolitan Transportation Authority Simulating I-710 Corridor Presented in the Western ITE Annual Meeting Santa Barbara, California.
1 Freeways and Interchanges CE453 Lecture 33 Source : A Policy on Geometric Design of Highways and Streets (The Green Book). Washington, DC. American Association.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
CEE 764 – Fall 2010 Topic 7 Special Issues on Signal Coordination.
February 19, 2015 Design Guidelines to Accommodate Pedestrians and Bicyclists at Interchanges Draft ITE Recommended Practice: Meghan Mitman, AICP Senior.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
PASSER II SOFTWARE.
Traffic Signal Warrants
Unconventional Arterial Intersection Design University of Maryland Advanced Transportation Day Aug. 28th 2014 Traffic Safety and Operations Lab University.
Exit Quiz Road Signs Recognition
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
INTRODUCTION Grade separation is an effective way of handling intersecting traffic with greatest efficiency, safety, capacity. An interchange is a system.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Trip Generation for Street and Highways Lecture 14 CE 4720 Norman Garrick.
VISSIM and Mn/DOT’s INTERSECTION CONTROL EVALUATION (ICE) VISSIM USER’S GROUP MEETING MAY 15-16, 2008 Philadelphia Dennis Eyler, P.E., P.T.O.E. Vice President.
Grade separation.
Ramp Count Estimation Procedures Daniel Jenkins, PE Office of Highway Policy Information October 24, 2012.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
Right-of-Way Who Goes First?.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
 Manage Visibility –  6 second rule –  Judge gaps in traffic –  Signed Intersections –  T-Intersections –  4-Way Intersections -
Problem 4: Okeechobee Road Stopped Control Analysis.
Expressway Driving Entering, lane changing, and exiting.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
Intersections.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
Advancing Traffic Signal Management Programs through Regional Collaboration T3 Webinar -- July 23, 2009 Jim Poston Regional Transportation Commission Reno,
NC-54 at Farrington as Offset Intersection
Intersection Design Spring 2017.

Signs Power Point Assignment
Traffic Signs, Signals, and Road Markings
Chapter 3 Regulatory, Warning & Guide Signs Overview
UNIT 3 Foundations of Effective Driving
Interchanges Module 7.
The I-465 West Leg Reconstruction Project
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
Chapter 3 Regulatory, Warning & Guide Signs Overview
Fordham at Columbia as a Grade-Separated Intersection
Chapter 3 Regulatory, Warning & Guide Signs Overview
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
Signs, Signals, and Markings
Interchanges Ch. 6.
Signalized Intersections
Safe Driving Rules and Regulations
FM 518 By-pass Traffic Review
Highway capacity and Level of Service Analysis
Double Crossover Diamond Interchange
Signal Timing: Putting it All Together
Traffic Signs, Signals, and Road Markings
Results and Status of State Crash Analyses
Problem 5: Interstate 87 Interchange
Technical Committee on Geometric Design
CE 3500 Transportation Engineering Saturation flow and signal LOS
Traffic Safety.
Contract 60X10 Informational Meeting Weber I-55
Design Criteria CTC 440.
Fordham at Columbia as a Grade-Separated Intersection
Rules of the Road Chapter 10
Transportation Engineering Calculating Signal Delay February 23, 2011
Presentation transcript:

ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI) With offset intersections SRF Consulting Group – May 2006

VISSIM SCREEN SHOTS Volumes used in simulation – year 2030 pm peak hour, for Mn Hwy 55 at Vicksburg Lane in Plymouth WB Mainline (underpass) 2910 Left turns – 120 Right turns – 415 Mainline through – 2375 EB Mainline (underpass) 1795 Left turns – 245 Right turns – 225 Mainline through – 1325 NB Cross street (over crossing) 1510 Left turns – 480 Right turns – 120 Throughs – 910 NB Cross street (over crossing) 1020 Left turns – 280 Right turns – 320 Throughs – 420 Represents junction of principle arterial (55,000 ADT) with minor arterial (25,000)

Two signal controlled intersections Signals on each level to handle left turns from ramps. Right turns have extended acceleration lanes to enter mainline and Yield control to enter cross street. Lower volume left turns from each roadway have complex alignment to create single intersection of opposing lefts while retaining a rectangular bridge shape.

Underpass Cross street follows a ridge. Mainline is lowered under intersection with 17 feet of vertical clearance.

FOUR EXIT RAMP SPLIT LEVEL SINGLE POINT (offset intersections) INTERSECTION DETAILS Alternative design has separate “conventional exit ramp intersections, but uses one signal controller with “split” phasing for the exit ramp greens, less capacity, but narrower bridge. Offset single intersection allows for exit ramp lefts to be made concurrently.