First 8 slides are what was presented in San Fransisco…

Slides:



Advertisements
Similar presentations
Participation Requirements for a Guideline Panel Member.
Advertisements

AIS AIM SG Ad-hoc Chapters 5-6 Group TOKYO MEETING REPORT.
Comments for Standard for Proposed Power Modeling to Enable System Level Analysis PAR.
1 ANSI/EIA A STANDARD Earned Value Management Systems Proposed Changes Discussion January 31, 2007 NDIA Program Management Systems Committee.
NACE Direct Assessment Standards Office of Pipeline Safety (OPS) Public Meeting November 4, 2003.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Introduction to the ISO series ISO – principles and vocabulary (in development) ISO – ISMS requirements (BS7799 – Part 2) ISO –
Don Wells Hess Corporation
Review and Revision of ISO/IEC 17021
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
19th January 2012 Don Wells (Hess)
2 nd Editorial Board Meeting JRC Ispra, November 26 th 2004 Soil of Atlas Europe.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Certification and Adoption Workgroup HIT Policy Committee April 28, 2014 Discussion on Incremental Rulemakings.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Cynthia Holcomb Education Specialist
Russell Stringer (Australia)
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
Task Group Status January ,11, 2017
MANCHESTER LOCALITY PLAN BOARD – GOVERNANCE RESPONSIBILITIES
AIS AIM SG Ad-hoc Chapters 5-6 Group
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
API 17Q Proposed Technical Changes to Rev 0
HIGHLIGHTING THE KEY CHANGES
Outcome TFCS-11// February Washington DC
API RP 17A - Discussion Points
Update on the Developments in Government Auditing Standards
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
API 17Q – Subsea Equipment Qualification
Alignment of Part 4B with ISAE 3000
API S64 Summer Conference Update.
Status Update on API 16Q / 16R / 16F
IEEE R Comment Resolution
Specification on float equipment
Improving assessment of GES Draft conclusions and Way forward
API SC 10, Work Group 3 Update:
API 17H TASK GROUP January 15, 2013.
Recommendations for using this ‘framework’ template
Reliability Standards Development Plan
TECHNICAL REPORT.
Don Wells Hess Corporation
API 14H Task Group Status Proper Classification of Document
Note: Text displayed in blue italics is included to provide guidance to the author and should be deleted or hidden before publishing the document.
API RP 59 June 2017 Recommended Practice for Well Control Operations
NERC Reliability Standards Development Plan
Revision of the technical annexes of the BPR
Specification on float equipment
NERC Reliability Standards Development Plan
Change Highlights January 2013
ISO 9001:2008 – Key Changes NOTE: use of this webinar depends on the instructor/speaker using the text in the notes of the slides!! Examples and speaking.
Common Understanding Way forward
Discussion Points API RP 17A Task Group Members
2nd Edition: 2019 Winter Standards Meeting
Living Donor Committee
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
ISO and TR Update for FDA Regulated Industries
WG 03 IoT Identifier Task Force Status 11/2017
API 17H TASK GROUP June 26, 2013.
Presentation transcript:

API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management First 8 slides are what was presented in San Fransisco….or at least I think so The remaining slides are our progress since and path forward

History See Last Summer Minutes

Status Before Winter ‘15 Meeting the committee worked the 17N / 17Q relationship Agreed a “New Q” was required Plan at that time was that: API 17N would introduce the TQ Process API 17Q would cover the details Prior to the Winter Meeting

Status 17N ballot took place 17Q scoping survey completed Overall ballot passed but with many comments Results evaluated 8 complex issues, 186 others 2 negative votes (repetition and inferred shall) 17Q scoping survey completed Formed the basis for API RP 17Q Explain the reason for the original document structure which had Stand alone project stages and operational stages . Intended that each stage could be separately

17Q Scoping Survey Report API 17Q Preliminary contents (headings 1-4 standard sections not shown) Preliminary Table of Contents for API 17Q Brief notes under each heading Summary of comments from industry inputs as an appendix Handed over to 17Q committee

Plan for Q3/4 2015 To work comments – agree how to address To address negative votes To form 17Q Working Committee To deliver revised 17N and new 17Q ASAP Current Annexes D (statistics) and F (TRL & TQP) will be incorporated into API 17Q but will remain temporarily in 17N until 17Q is issued

17N Progress Agreed basis to correct 17N negative votes David Saul (BP) has joined team to address concerns Shell (in concurrence) Action Plan agreed to address 17N ballot comments and BP/Shell concerns 17Q steering committee formed

17N Action Plan Key areas to be actioned Wording to accommodate companies with existing practices which already cover the scope and intent of API 17 N Provide foreword which explains structure and layout of the document Avoid repetition Simplify language and seek volume reduction opportunities Remove all implicit “shall” statements Example implicit Shall: ….to ensure that. Implicit should: it is recommended that.

17N Action Status Statement on existing company processes – DONE Foreword – TBC following other changes Removal of repetition Astrimar to merge large portions of main body text section 6 into annex C (scope of work) and remove repetition 95% DONE Jerry Baker and David Saul to read/review when complete Simplify Language Annex E ( Inspection) - Baker Marine Technology DONE Annex B (KPs) – OneSubsea/FMC TBD January 2016 Remove Implicit “shall” David Saul to propose changes - WIP Astrimar to review on completion

Additional 17N Actions Additional Improvements to capture Ballot feedback Technical risk categorization Propose definition of “same” for TRC = D (David Saul) WIP Guidance on use of Process TRC (Astrimar) DONE Clarification of qualification terminology Annex F to be aligned with 17Q (Astrimar) TBD with 17Q Review allocation of goals and requirements Edit KP1 in annex B (Astrimar) WIP RIAD (Reliability & Integrity Assurance Document) TBD as part of Annex B and Annex C update WIP Same :

Goals Changes to not require a Re-Affirmative Vote Complete revision by EOY 2016 (HARD Deadline) Latest version to steering committee end Feb 2016 Issue to API by June 2016 (aim for April) Ensure Smooth Transition & alignment between 17N & 17Q

Current Issues Need resources to address Annex B comments FMC /One subsea already agreed to support Unable to resource in 2015 Needs urgent 2016 resourcing to meet delivery deadline Considerable effort has already been contributed since ballot Astrimar, Baker Marine, BP plus others API 17N chairs are recommending an SRRR application for funding

Thanks and Questions