Note: squeeze in Atlas, CMS, LHCb and Alice on going

Slides:



Advertisements
Similar presentations
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Advertisements

Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
LHC Status Tue Morning 22-Aug
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thursday morning 09:30 Dump of pPb fill.
Summary of Week 16 G. Arduini, J. Wenninger
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
Chromaticity can make a difference…
Tuesday Loss maps in the night:
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Yesterday’s morning’s controls issues
Friday Morning 7:30 injection for fill 2908
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Wednesday 10/5 Cryo recovery until 18:30
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Summary week 18 Intensity ramp up & production
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Monday :15 fill 3523 dumped by BPMs IP6
Friday morning 08:00 Stable beams with 840b.
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Thursday 20th July - morning
Another Immortal Fill….
Monday 10th December - morning
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Note: squeeze in Atlas, CMS, LHCb and Alice on going 1.3 x 1012 in 20 s i.e. around 45 kW Note: squeeze in Atlas, CMS, LHCb and Alice on going 13-4-12 LHC status

Squeeze 2596 Giulia Papotti 13-4-12 LHC status

Tuesday 8th April - morning 09:15 EOF: RF (Philippe) changed the phase of R2 wrt R1 by 15 degrees (corresponds to a shift of 15 mm longitudinal displacement) 13-4-12 LHC status

Tuesday 8th April - morning 09:19 Fill 2569 dumped ~90 pb-1 Initial lumi 3.6e33 cm-2s-1 1.27e11 ppb, emit ~2.4 - 2.5 microns 13-4-12 LHC status

Tuesday 8th April - morning To 10:30 Usual problems with TDI After 6 or 7 cycles, we still don't manage to put the TDI.R8 in place, right jaw up is still out of limits for a few um. Changed position thresholds by 50 micorns 11:00 Beam in FBCT-A system calibrated for probes (by D. Belohrad) Loss at injection 11:40 mastership back to SPS to check scraping and bunch length 12:25 injecting physics beam again – better 13:15 trip of the RQTL11.L5B1 – access required 13-4-12 LHC status

Tuesday 8th April - afternoon 14:20 Access Access to PM56 (RP & EPC) - power module was changed E.Calvo has sent a colleague to P6 to intervene on the interlocked BPMS right of IR6 (B2) . increase the attenuation on both planes for the BPMS.BR6.B2. LHCb in access with delegation BLM threshold adjustment 17:35 BPMS requalification 18:40 filling for physics curtailed by PSB power supply problem R3 Emittance blow-up at 450 GeV measured with 12 b 21:00 Re-injecting 13-4-12 LHC status

BLM thresholds As discussed this morning in the rMPP concerning 4 MQYs in IP6 cell 4 and 5 position 1 after the TCSGs: Changed the BLM monitor factor from 0.1 to 0.2 on BLMQI.04L6.B2I10_MQY, BLMQI.05L6.B2I10_MQY, BLMQI.04R6.B1E10_MQY, BLMQI.05R6.B1E10_MQY due to leakage losses from IP7 to L6 TCSG. Barbara Holzer 13-4-12 LHC status

Tuesday evening 21:00 Filling – nice and clean Squeeze a lot cleaner IR 6 not showing up in BLM warnings between 2.5 & 2 m Limited to 22:01 Beam lost at very end of collision BP Beam goes unstable – B1 H - rise time ~2 seconds 23:15 Lost cold compressor for sector 7-8. Access in UX85 through US85 to fix heater on interconnection box - will allow faster recovery when the compressor is back. 13-4-12 LHC status

Orbit FF – squeeze – beam 1 Jorg Wenninger Ralph Steinhagen Sigma H at TCP ~300 microns TCP ~5.1 sigma 13-4-12 LHC status

Orbit FF – squeeze – beam 2 13-4-12 LHC status

Losses in squeeze at TCP 13-4-12 LHC status

Orbit FF 13-4-12 LHC status

Instability – B1 H 13-4-12 LHC status

Instability 13-4-12 LHC status

Recent actions v. losses Scraping optimization SPS Injection optimization TDI measurement at warm to do Transverse damper modulation off Collimator set-up at top energy checked BLM thresholds tweak and more general discussion started (rMPP) OFB higher bandwidth in squeeze and feed-forwarded 13-4-12 LHC status

Today Recover from cold compressor stop ~midday Increase TFB going into collisions (following analysis – Wolfgang Hofle) (Increase LD octupoles) 1380 13-4-12 LHC status

Misc Both occasions while preparing the machine for injection the BLM sanity check failed 2 times. The CMW on the OFSU server was down; Ralph restarted it and said it's an unknown already experienced cause, it will be investigated tomorrow. One of the RB.A12 quench detector crashed during injection (we lost the QPS OK) but reset itself and went back to the right status. 13-4-12 LHC status