Lecture 6 scrapers TSP-308 MPK Ferdinand Fassa.

Slides:



Advertisements
Similar presentations
Excavators Cranes(will discuss another section)
Advertisements

Loading and Hauling.
Picking a Suitable Truck © Dr. B. C. Paul 2000 Revised 2009 Hi!
Excavating and Lifting Part 2
Loading and Hauling Part 2
Compacting and Finishing Part 2
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.
Lecture 4 Excavating and Lifting
Eng. Malek Abuwarda Lecture 8 P1P1 Construction Methods Lecture 8 Loading and Hauling.
Loading and Hauling Part 3
Lecture 7 Loading and Hauling
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 10 Trucks and Hauling Equipment.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Chapter 19: Flexible Machine Elements
Ground-Based Primary Transport TOPICS: Conventional ground skidding equipment Mechanical felling, tree processing & forwarding equipment & systems Management.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Excavating and Lifting Part 2
CTC-375 Construction Methods
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
COURSE INTRODUCTION CEM 530 CONSTRUCTION EQUIPMENT AND METHODS BY
Compacting and Finishing Part 2
Loading and Hauling Part 1
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
CE 353 Lecture 6: System design as a function of train performance, train resistance Objectives: –Choose best route for a freight line –Determine optimum.
RUNWAYS. Runway Length Requirements  Governmental regulations  Airport location  Critical aircraft  Sources:
Determining Truck Speeds using Rimpull and Retarder Curves
Loading and Hauling Part 2
Lecture 6 Loading and Hauling
CONSTRUCTION TECHNOLOGY & maintenance
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 6 Machine Equipment Power Requirements.
Speed 4th Grade science S4P3b.
Lecture 2 Introduction to Earthmoving
Planning for Earthwork Construction
SHOVELS.
Session 15 – 16 SHEET PILE STRUCTURES
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Forging new generations of engineers
Next Part of Step II Determining Peak Speed ©Dr. B. C. Paul 2000 revised 2008 Note – The methods outlined here are typical of widely known published engineering.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Dozers.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
Discovering Mathematics Week 5 BOOK A - Unit 4: Statistical Summaries 1.
Chapter 4 Loading and Hauling Part 3 1CE 417 King Saud University.
Motion and Force Speed, Velocity, Slope, Friction, and Distance.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Sanitary Engineering Lecture 10 Revision
Basic Principles of Power
Vehicle Weights.
Dynamics and Space Learning Intention You will be able to:
Spread Footing Design for Columns
CONSTRUCTION METHODS & TECHNOLOGY
CONSTRUCTION METHODS & TECHNOLOGY
(a) Brake Performance (a) Brake Performance.
TRUCKS & HAULING EQUIPMENT
Flexible pavement design
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Highway Engineering CE 431
Quarry Manager Development Program
CONSTRUCTION EQUIPMENT MANAGEMENT
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
Spread Footing Design for Columns
MUHAMMAD WAJAHAT AMIN (INTERNEE, MINE PLANNING) OPEN PIT MINING TOPICS.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Spread Footing Design for Columns
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Embraer ERJ 135 VIP PHOTOS SPECIFICATIONS AIRCRAFT SPECIFICATIONS
Presentation transcript:

Lecture 6 scrapers TSP-308 MPK Ferdinand Fassa

OUTLINE Introduction Types of Scrapers Scraper Production Chart

INTRODUCTION Excavating, loading, hauling, & dumping over medium distances. Can be used with pusher tractor for increased production. Some models have self loading capabilities Economical over a wide range of haul lengths Can self load and not dependent on other equipment Scraper are available with loose heaped capacities up to about 44 cy

Types of Scrapers Push-Loaded: Single Powered Axle

Types of Scrapers Push-Pull: Tandem- Powered Axle

Types of Scrapers Auger Scraper Can self-load in difficult condition (frozen material, lime-stone) More costly to own and operate than conventional single-or tandem machine

Types of Scrapers Elevating is loading and hauling scraper Used for utility work Very good in small quantity situation No pusher required

Scraper Production Chart

Average Speed Factors When machinery are required to accelerate and stop in the same section, apply the squared value from column one.

Scraper Fixed Time, min

Scraper Production Example Problem Estimate the production of a single two-axle scraper Travel time curves are shown on Figures below, Fig. 4-4 & 4-5. Max Heaped Volume = 31 LCY Max Payload = 75,000 lb Material: Sandy Clay, 3200 lb/BCY, 2650 lb/LCY, Rolling Resistance = 100 lb/ton, Operating Conditions = Average

Scraper Production Example Haul Route: Section 1. Level Loading Area Section 2. Down a 4% grade, 2000 ft Section 3. Level Dumping Area Section 4. Up a 4% grade, 2000 ft Section 5. Level Turnaround, 600 ft Turnaround Load Area 4% grade Dump Area

Scraper Production Example Loads per Cycle Heaped Cap. Wt. = 31.0 LCY x 2,650 lb/LCY = 82,150 lbs 82,150 lbs exceeds the 75,000 lbs Rated Max Payload of the Scraper. The maximum scraper volume is limited by weight to = 75,000 lbs (Rated Wt)/ 3,200 lb/BCY = 23.4 BCY/Load

Scraper Production Example

Scraper Production Example Travel Time: Section 2 ~ Down a 4% Grade, 2,000 ft. (1% Eff.) TT2=1.02 min (Figure 4-4) Section 4 ~ Up a 4% Grade, 2,000 ft. (9% Eff.) TT4=1.60 min (Figure 4-5) Section 5 ~ Level Turnaround, 600 ft. (5% Eff.) TT5=0.45 min (Figure 4-5) TT=1.02 + 1.60 = 0.45 = 3.07 min

Scraper Production Example Travel Time: Section 2 ~ Down a 4% Grade, 2,000 ft. (1% Eff.) TT2=1.02 min (Figure 4-4) Section 4 ~ Up a 4% Grade, 2,000 ft. (9% Eff.) TT4=1.60 min (Figure 4-5) Section 5 ~ Level Turnaround, 600 ft. (5% Eff.) TT5=0.45 min (Figure 4-5) TT=1.02 + 1.60 + 0.45 = 3.07 min

Scraper Production Example Travel Time: Section 2 ~ Down a 4% Grade, 2,000 ft. TT2=1.02 min (Figure 4-4) Section 4 ~ Up a 4% Grade, 2,000 ft. TT4=1.60 min (Figure 4-5) Section 5 ~ Level Turnaround, 600 ft. TT5=0.45 min (Figure 4-5) TT=1.02 + 1.60 = 0.45 = 3.07 min

Scraper Production Example Fixed Cycle (Table 4-7) – Average Conditions – Single Engine Spot = 0.3 min. Load = 0.6 min. Maneuver & Dump = 0.7 min. Total Fixed Time = 0.3 + 0.6 + 0.7 = 1.6 min Total Cycle Time = 3.07 + 1.6 = 4.67 min. Estimate Production = 23.4BCY/Load x [(50min/h)/(4.67min/Load)] = 251 BCY/h

Scraper Fixed Time, min

Scraper Production Example Fixed Cycle (Table 4-7) Load Spot = 0.3 min. Load = 0.6 min. Maneuver & Dump = 0.7 min. Total Fixed Time = 0.3 + 0.6 + 0.7 = 1.6 min Total Cycle Time = 3.07 + 1.6 = 4.67 min. Estimate Production = 23.4BCY/Load x [(50min/h)/(4.67min/Load)] = 251 BCY/h

Push-Loading

Typical Pusher Cycle Time, min

Number of Scrapers Served, Pushers Required & Production (# of scrapers that can be handled by one pusher w/o scraper delay) (# of pushers required to service a fleet of scrapers: round up to next integer)

Scraper Push-Loading Example Problem The estimated cycle time for a wheeled scraper is 6.5 min. Calculate the number of pushers required to serve a fleet of nine scrapers using pushers. Determine the result for both backtrack and chain loading methods.

Scraper Push-Loading Example Cycle Times from Table 4-8

Optimal Load Time

Optimum Load Time

Cycle Time minus Load Time = 3.0 min.

CONSTRUCTION EQUIPMENT AND METHODS Next Week: Lecture 7 CONSTRUCTION EQUIPMENT AND METHODS