Development and Results of the First Canadian Infrastructure Report Card Dr. Guy Félio, P.Eng. OFNTSC – Rama October 25, 2012.

Slides:



Advertisements
Similar presentations
Re-design of the trade in commercial services program in Canada October 2010 OECD Working Party on Trade in Goods and Services.
Advertisements

PROFESSIONAL ASSOCIATIONS: WHY PARTICIPATE? Presenter Name Company IIA Chapter/Institute.
Template: Making Effective Presentation about Your Evidence-based Health Promotion Program This template is intended for you to adapt to your own program.
The MAP-ESG project Fiona Crozier Vice-President ENQA Assistant Director, QAA UK.
Canadian Sport Policy Renewal Meeting with the Sport Community September 24, 2010.
STATE OF TRANSPORT CLIMATE CHANGE ADAPTATION ACTIONS IN EEA COUNTRIES, RECENT EXPERIENCES Natalia Sobrino (TRANSyT- UPM) ETC/CCA Task Adaptation.
PSC INTOSAI Professional Standards Committee PAS Recent achievements and present activities Wellington, June 2011 PERFORMANCE AUDIT SUBCOMITTEE.
Capacity development - key to sustainable water operations Water Operator Partnership and Institutional Capacity Development for Urban Water Supply Richenel.
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
CEO Water Mandate and Collective Action Jason Morrison International Waters Conference 7 Bridgetown, Barbados October 30, 2013.
Session 5 Chair: Eva Elliott Health Impact Assessment: Making the Difference.
Meeting with IESBA CPAB Update Glenn Fagan and Kam Grewal April 7, 2014.
Literacy Assessment and Monitoring Programme (LAMP) UNESCO Institute for Statistics.
Dale Robertson, DANTE PR Manager 18 March 2005, UNI-C, Lyngby, Denmark GÉANT User Survey Objectives, Methodology, Experience.
PARIS 21 Meeting Ghana July Challenges in health information Health Metrics Network HMN Framework and profiling tool.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
PPA 502 – Program Evaluation Lecture 10 – Maximizing the Use of Evaluation Results.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
High-Level Assessment Month Year
Risk and Resilience: A Canadian Perspective on Climate Change Adaptation Donald S. Lemmen, PhD Climate Change Impacts and Adaptation Directorate Natural.
SPECA Regional Workshop on Disability Statistics: Dec 13-15, 2006 Purposes of Disability Statistics Jennifer Madans and Barbara Altman National Center.
The Canadian Census of Population: a Review in Preparation for 2016 UNECE Group of Experts on Population and Housing Censuses May 23, 2012.
Working Group 4: Urban Governance for Risk Reduction: Mainstreaming Adaptation into Urban Planning and Development Chair: Prof. Shabbir Cheema Rapporteurs:
Standing Conference of Towns and Municipalities Training and consulting services of the representatives of local communities By. Marko Moračić.
This project is part-financed by the European Union (European Regional Development Fund), the Finnish Ministry of Environment and the partners. Mobility.
Communication strategy and techniques to launch InnovMed Dr. Fatma H. Sayed Vienna meeting 25 June 2007.
Highways and Engineering Savings and Efficiencies Review November 2010.
TRANSED 2012 – INDIADevelopment with Disabled Network Holistic Approach to Develop a Barrier Free Environment for People With Disabilities (PWDs) in Sri.
1 Ministry of Transport, Public Works and Water Management.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Resource Guide for Piloting the Caregiver Policy Lens Dr. Penny MacCourt “Supporting Caregivers of Older Adults” B.C. Psychogeriatric Association 2011.
Activities, Results and Preliminary Report ACWI Meeting September 14, 2005 The Sustainable Water Resources Roundtable (SWRR)
1 Metagora: Current Progress and the Way Forward PARIS21 Steering Committee Paris, 13 November 2007.
FHWA Reorganization Update Program Performance Management Standing Committee on Performance Management Meeting Detroit, MI October 14, 2011 Peter Stephanos.
Providing world-class services for our customers and our environment March 2014 Stormwater Costs of Service and Rates.
NRTSI/NRC Project Framework for the Assessment of the State, Performance and Management of Canada’s CPI.
Strengthening the Production and Use of Statistics in the OIC Strengthening the Production and Use of Statistics in the OIC Mohamed-El-Heyba Lemrabott.
Dr. David Mowat June 22, 2005 Federal, Provincial & Local Roles Surveillance of Risk Factors and Determinants of Chronic Diseases.
American Community Survey ACS Content Review Webinar State Data Centers and Census Information Centers James Treat, ACSO Division Chief December 4, 2013.
Water Quality Training for Small Systems: Working Together to Develop a Common Sense Approach Bill Schutzman Government of Canada Water Safety Conference,
1 Climate Change Adaptation Initiatives – Assessing the Vulnerability of Infrastructure: Tools Background on the PIEVC Project APEGGA-Engineers Canada.
Dr. Maria-Carme Torras i Calvo Chair, IFLA Information Literacy Section Dr. Sharon Mader Secretary, IFLA Information Literacy Section Global Partnerships.
African Centre for Statistics United Nations Economic Commission for Africa Towards a More Effective Production of Gender Sensitive Data in African Countries:
FLAGSHIP STRATEGY 1 STUDENT LEARNING. Student Learning: A New Approach Victorian Essential Learning Standards Curriculum Planning Guidelines Principles.
Strenghtening Capacity of local municipalities on European affairs Thomas Wobben Representation of Saxony-Anhalt to the European Union Boulevard Saint.
Primary Years Programme FLIBS PYP: PYP Chair: Sandy Wesson PYP Chair Elect: Rachel Goodnow PYP Secretary: Gayle Baisch Grants Committee: Cynthia Doyle.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Census of Economic Establishments in Ethiopia Yasin Mossa Central Statistics Agency of Ethiopia July 2009.
United Nations Statistics Division Work Programme on Economic Census Vladimir Markhonko, Chief Trade Statistics Branch, UNSD Youlia Antonova, Senior Statistician,
Revisions Proposed to the CIS Plan by the Global Office Misha V. Belkindas Budapest, July 3-4, 2013.
Kathy Corbiere Service Delivery and Performance Commission
Intro to P3s Week 2. The Context of the Debate over P3s An Infrastructure Deficit An Infrastructure Deficit Fiscal Pressures (“The Fiscal Challenge”)
SUMP process – What happens in Dresden?
Helping Teachers Help All Students: The Imperative for High-Quality Professional Development Report of the Maryland Teacher Professional Development Advisory.
1 Rights in Action Good practices for inclusive local governance in West Africa Benin, Burkina, Faso, Mali, Niger, Senegal, Sierra Leone, Togo Side event.
Monitoring, reporting and evaluating climate change adaptation policies at national level in Europe - An overview of where we stand Stéphane Isoard, EEA.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
European Commission initiatives for financial education Conference “Financial education: the present and prospects for the future” 30 April 2009, Vilnius.
GSDI 61 Models of National GI Associations GSDI 6 conference September 2002 Budapest.
November | 1 CONTINUING CARE COUNCIL Report to Forum Year
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
THE CREATION OF A CANADIAN LIMITED USE DATA FILE June 2009 North American Association of Central Cancer Registries San Diego, CA Les Mery Program Director,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
ENPARD I Pilot Rural Development Projects
Overview of the CoJ Water & Sanitation Master Plan
IFME Joint Meeting April 18, 2016
Rights in Action Good practices for inclusive local governance
Third Climate-ADAPT Webinar
Bridging the Gap between Asset Performance, Cost of Service and Risk
Presentation transcript:

Development and Results of the First Canadian Infrastructure Report Card Dr. Guy Félio, P.Eng. OFNTSC – Rama October 25, 2012

BACKGROUND

Project Objective Develop a rigorous, repeatable assessment process for the condition of Canadas infrastructure to raise the awareness of the public, decision-makers and other stakeholders about current infrastructure issues and future trends. The results of this process would be published as a factual Infrastructure Report Card, not an advocacy document Project Started in July 2010 and report card expected to be published in September 2012.

International Perspective Several countries, including the USA, the UK and Australia have produced, and continue to create on a regular basis state-of-the-infrastructure report cards. – Although there are variations in how the letter grading is assigned, they all use a school type report to communicate the results. Most state of the infrastructure reports are aimed at awareness (the target audience may vary but in general includes the public and elected decision makers). The second main common objective of these studies is to influence senior government decisions.

In terms of lessons learned, three key issues stand out: – There needs to be rigorous evaluation (i.e., process) criteria from the beginning. – Multidimensional stakeholder involvement (i.e., from regions, sectors, professions, etc.) is essential. – No one should expect 100% accuracy International Perspective (continued)

Canadian Examples & Information

PROJECT GOVERNANCE

Project Structure

RCAB Composition Association of Canadian Engineering Companies - ACEC Canadian Association of Municipal Administrators - CAMA Canadian Automobile Association - CAA Canadian Construction Association – CCA (PSC) Canadian Council of Public- Private Partnerships - CCPPP Canadian Institute of Planners - CIP Canadian Network of Asset Managers – CNAM (Chair) Canadian Public Works Association – CPWA (PSC) Canadian Society for Civil Engineering - CSCE (PSC) Canadian Urban Transit Association – CUTA (Guest) Canadian Water and Wastewater Association - CWWA Federation of Canadian Municipalities – FCM (PSC) Engineers Canada Transportation Association of Canada – TAC (Observer)

METHODOLOGY

Data Sources Voluntary Survey – Questionnaire was adapted from the work of the Core Public Infrastructure (CPI) Advisory Committee created by Infrastructure Canada and active from 2008 to – Online or paper questionnaires Financial data from PS 3150 reports Roads (excluding bridges) Drinking water: purification and distribution Wastewater collection and treatment Storm water management

Data Sources (continued) Municipalities were asked to provide information for each of the four asset categories related to: – The management of the assets: asset management systems, inspection and condition assessment practices, and replacement value of the infrastructure – The (current) physical condition of the infrastructure – The capacity of the infrastructure to meet (current) demand

Sample question - Roads

Sample Condition Rating - Water Physical Condition Distribution System 5 – Very Good No structural defects. Little or no water loss through leakage. 4 - Good Minor cracking, spalling or signs of wear. Deterioration causing minimal influences on levels of service and less than 1 break/km/year. Equivalent to OFWAT condition grade Fair Medium cracking, spalling or signs of wear. Deterioration beginning to be reflected in deteriorating levels of service and/or increased operating costs. Less than 3 breaks/km/year. Equivalent to OFWAT condition grade Poor Fracture with deformation up to 10%. Nearing the end of useful life, further deterioration likely, affecting levels of service. Greater than or equal to 3-5 breaks/km/year. Equivalent to OFWAT condition grade 4. 1 – Very Poor Collapsed or collapse imminent. No residual life expectancy, requires urgent replacement. Equivalent to OFWAT condition grade 5.

ANALYSIS

Rating was done using physical condition only

RESULTS

Participation

Use of Asset Management The majority of municipalities reported using some type of asset management system, whether computerized or/and paper based. Drinking water90% of respondents Wastewater systems68.8% of respondents Storm water management50.5% of respondents Roads85.6% of respondents

Potable Water GOOD: ADEQUATE FOR NOW The infrastructure in the system or network is in good to very good condition; some elements show general signs of deterioration that require attention. A few elements exhibit significant deficiencies.

Wastewater Systems GOOD: ADEQUATE FOR NOW The infrastructure in the system or network is in good to very good condition; some elements show general signs of deterioration that require attention. A few elements exhibit significant deficiencies.

Stormwater Systems VERY GOOD: FIT FOR THE FUTURE The infrastructure in the system or network is generally in very good condition, typically new or recently rehabilitated. A few elements show general signs of deterioration that require attention.

Municipal Roads FAIR: REQUIRES ATTENTION The infrastructure in the system or network is in fair to good condition; it shows general signs of deterioration and requires attention. Some elements exhibit significant deficiencies.

Replacement costs AverageMedian(2-lane km) Highway$ 1, 854,000$ 2,063,000 Arterial$ 1,095,000$ 1,007,000 Collector$ 1,002,000$ 842,000 Local$ 689,000$ 583,000 Alley$ 436,000$ 258,000

LESSONS LEARNED

Not all municipalities have the data requested, and/or in the format required The glossaries in each section of the questionnaires were useful, but need expanded levels of details. There is also a lack of uniformity in definitions across the country; even though national guidelines may exist for some infrastructure classes or components, these are not consistently used. Questions requiring data on capacity to meet demand need to be improved Data Requirements

The online survey was the preferred tool by the majority of municipalities responding Time allocation and the period of the year to respond to the survey are important The call for participations was mainly done through the heads of Council (e.g., mayors) and CAOs of municipalities, with further invitations through professional associations networks For a first report card, the representation (on a population, demographics and geographical basis) is beyond the initial project expectations Data Collection

Targeting municipalities by population and geography may be a strategy to help with increasing the statistical representation Data Collection (continued)

With improved questionnaires, data analysis automation should also be developed, through for example templates and other database tools. 277 municipalities registered but did not provide data or their data could not be used. The national assessment of the infrastructure is therefore based on those that have data – the R.C. may overestimate the infrastructure condition The analysis was done at the national level. The potential for regional report cards, whether based on the current data or for future projects, needs to be explored Analysis

IN SUMMARY

MUNICIPAL ROADS FAIR: REQUIRE ATTENTION The infrastructure in the system or network is in fair to good condition; it shows general signs of deterioration and requires attention. Some elements exhibit significant deficiencies. POTABLE WATER SYSTEMS GOOD: ADEQUATE FOR NOW The infrastructure in the system or network is in good to very good condition; some elements show general signs of deterioration that require attention. A few elements exhibit significant deficiencies. WASTEWATER SYSTEMS GOOD: ADEQUATE FOR NOW The infrastructure in the system or network is in good to very good condition; some elements show general signs of deterioration that require attention. A few elements exhibit significant deficiencies. STORMWATER SYSTEMS VERY GOOD: FIT FOR THE FUTURE The infrastructure in the system or network is generally in very good condition, typically new or recently rehabilitated. A few elements show general signs of deterioration that require attention.

Why should we care today?

For Roads

Thank you Contact: Dr Guy Félio, P.Eng. Project Manager First Canadian Infrastructure Report Card Tel: