WG C – Groundwater Activity WGC-3 – Integrated Risk Assessment and Management (IRAM) Sub group Conceptual model development Dietmar Müller, Wouter Geaverts,

Slides:



Advertisements
Similar presentations
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Advertisements

ACC 491 Week 4 Individual Assignments From the Text Assignments-From-the-Text Resource:
Draft Mandate Johannes Grath Balázs Horvath (DG Env)
Background CRiteria for the IDentification of Groundwater thrEsholds BRIDGE Project Presentation Contract N° (SSPI) Co-ordinator: BRGM (Fr)
Groundwater legislative framework
STRATEGIC CO-ORDINATION GROUP Water scarcity Expert group
Project Objectives, Workplan and Timescales
D5 EUTROPHICATION REVIEW PROCESS
Draft Article 8 MSFD assessment guidance
Daughter Groundwater Directive
Philippe Quevauviller, Johannes Grath
Direct and indirect inputs Working Group C Groundwater :
Good groundwater chemical status
WG C Groundwater Activity 3 Draft guidance on RA & CM for groundwater
Purpose Independent piece of legislation, closely integrated in a larger regulatory framework (complement to WFD): prevent deterioration protect, enhance.
Water reuse CIS working group PoM 15 October 2015 Thomas Petitguyot
Direct and indirect inputs Working Group C Groundwater
Taking forward the common understanding of Art. 8, 9 and 10 MSFD
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
Working Procedure Second meeting Drafting groups 1. March Deliver final group papers 8. March Synthesis Paper prepared by COM by 15. March Cases by case.
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Dietmar MÜLLER Federal Environment Agency Austria.
WG ESA guidance document
Monitoring Guidance Johannes Grath Rob Ward 12th October 2005.
WGC-2 Status Compliance and Trends
Direct and indirect inputs Working Group C Groundwater
WGC-2 Status Compliance and Trends Drafting Group meeting
Groundwater monitoring within the WFD
Expert Advisory Forum on
Horizontal Guidance on Wetlands Rome, 12nd June
Water Scarcity Activity Water Scarcity Drafting group
WG C1 - Compliance and Trends
Johannes Grath, Balazs Horvath
WGC-2 DG Meeting Towards a Guidance on Groundwater Chemical Status and Threshold Values 14:00 – 16:00 21 April 2008 Ljubljana, Slovenia.
WG C Groundwater Draft Mandate
Outcome of 2^ Seminar of the WG 2.7 Roma, January
WG GES, 6 December 2016, Brussels
Working Group C Ariane BLUM, Hélène LEGRAND (France)
Water reuse Drafting process for the guidance document
Wetlands and the Water Framework Directive
WG C Groundwater Progress Report to SCG SCG-Meeting, 07/
Meeting of Water Directors Eutrophication Guidance
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Project 2.7 Guidance on Monitoring
CIS WG GW Work Programme
Working group Ecological Flows
Meeting of Water Directors 2/3 December 2004
WG 2.B Integrated River Basin Management
DG Environment, Unit D.2 Marine Environment and Water Industry
WG C – Groundwater Activity WGC-3 Risk Assessment (RA) and
Umweltbundesamt, Austria
Pilot River Basin Water Framework Directive.
WG C Groundwater Progress Report to SCG SCG-Meeting, 08/
WG C Groundwater Mandate and activities
Update WG Eflows activity and link with EcoStat
Working Group C ( ) Groundwater in the CIS
WISE development Workshop on reporting for UWWTD
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
WGC – Groundwater Meeting Quantitative Status Guidance 22 April 2008
Philippe Quevauviller
River basin management plans in Europe
WGC-2 Status Compliance and Trends
Eutrophication activity
EU Water Framework Directive
EU Water Framework Directive
Guidance document on the identification of water bodies
Brussels – 20 April 2007 European Commission - DG Environment
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
SCG May 2005 CIRCA review.
Good groundwater chemical status
Horizontal Guidance on Wetlands Brussels, 5th May
Presentation transcript:

WG C – Groundwater Activity WGC-3 – Integrated Risk Assessment and Management (IRAM) Sub group Conceptual model development Dietmar Müller, Wouter Geaverts, Thomas Track

CM Guidance structure 1 Introduction & Definitions 2 Basic procedure 3 Requirements to a CM 3.1 Questions to be answered by a CM 3.2 Area to be considered 3.3 Processes to be considered 4 Data 4.1 Data needs 4.2 (existing) Data review 4.3 Data collection/acquisition 5 Conceptual model set-up, documentation/visualisation 5.1 Basic CM desciption/parameterisation 5.2 Risk based requirements (step2) 5.3 Management based requirements (step 3) 5.4 Documentation/visualisation 6 Validation of CM, quality assurance 7 Application of CM in risk assessment 8 Application of CM in risk management 9 Glossary 10 References I Annexes

CM link to existing Guidance documents Definition Recommen-dation no 3, Pressures and Impacts - + no 7, Monitoring no 12, The role of Wetlands no 15,Groundwater Monitoring no 16, Drinking Water Protected Areas no 17, Guidance on Preventing or Limiting Direct and Indirect Inputs no 18, Guidance on Groundwater Status and Trend Assessment

Evolving CM Guidance on GW Monitoring

Annexes Toolbox of methods Examples Tracing experiments stable isotope analysis …. Examples Source: R. Wolter 2009

Risk Assessment Further planning drafting May 29 (draft chapters) June 15 (draft document assembled) drafting group meeting: June 29/30 (RA/CM); Frankfurt September 4 / 30: draft document group meeting: October 14, Stockholm