« BIM in Europe: Current and future applications » Friday 7th october 2011, Nice 3 ème partie.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

PROJECT MANAGEMENT BASICS
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Chapter 1: The Database Environment
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 25 Slide 1 Chapter 25 Process Improvement.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 4 Author: Julia Richards and R. Scott Hawley.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
RISK MANAGEMENT and RM Tools 2 May 2007 INCOSE – Newport News, VA Chapter.
Introduction to Product Family Engineering. 11 Oct 2002 Ver 2.0 ©Copyright 2002 Vortex System Concepts 2 Product Family Engineering Overview Project Engineering.
2-1-1 Disaster Data Management System AIRS Conference – New Orleans 2 nd Session May 23, 2012.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
  Refresher 5(2x - 3) Solving Equations 2x + 5 = x + 10 x + 5 = 10
Italian Good Practice Projects Michela Arnaboldi and Giovanni Azzone
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Coordinate Plane Practice The following presentation provides practice in two skillsThe following presentation provides practice in two skills –Graphing.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 9 Moving to Design Lecture Analysis Objectives to Design Objectives Figure 9-2.
ZMQS ZMQS
Profiles Construction Eclipse ECESIS Project Construction of Complex UML Profiles UPM ETSI Telecomunicación Ciudad Universitaria s/n Madrid 28040,
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Software change management
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
16/05/ prepared by Joan Steele-Mills, Physiotherapist, Classification Officer CPISRA.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Integrated Approach to Area Master Planning in Jubail Industrial City
The importance of the service catalogue to the service desk
Destaff Overview – A reduction form is used for destaffs for Certified and Administrative positions. Please remember to indicate the current position/location,
TQA CONCEPTS & CORE VALUES
O X Click on Number next to person for a question.
© S Haughton more than 3?
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Page 1 October 31, 2000 An Introduction to Large-Scale Software Development Steve Varnau Core HP-UX Operation October 31, 2000.
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 28 Slide 1 Process Improvement 1.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Software Tools Lecture 10: Software Tools Dr Valentina Plekhanova University of Sunderland, UK.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Properties of Exponents
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
AMCA Consultant Process. 2 What do you do?  IPD? (Integrated Project Delivery) 
Test B, 100 Subtraction Facts
GEORGIA PERF0RMANCE MANAGEMENT FOR EMPLOYEES 2008
11 = This is the fact family. You say: 8+3=11 and 3+8=11
©Ian Sommerville 1995/2000 (Modified by Spiros Mancoridis 1999) Software Engineering, 6th edition. Chapters 1,3 Slide 1 Software Engineering Software Engineering.
Week 1.
We will resume in: 25 Minutes.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Chapter 12 Integrating the Organization from End to End – Enterprise Resource Planning.
1 Ke – Kitchen Elements Newport Ave. – Lot 13 Bethesda, MD.
James A. Senn’s Information Technology, 3rd Edition
1 Unit 1 Kinematics Chapter 1 Day
O X Click on Number next to person for a question.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 31 Slide 1 Service-centric Software Engineering 1.
© Prentice Hall CHAPTER 11 Facilitating User Computing.
The Quiet Revolution in Building Design and Construction: BIM.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Architect By: Chia-Jade Lee & Chloe Horgan By: Chia-Jade Lee & Chloe Horgan.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Pre-contract Planning and Practice
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Presentation transcript:

« BIM in Europe: Current and future applications » Friday 7th october 2011, Nice 3 ème partie

« BIM in Europe: Current and future applications » Friday 7th october 2011, Nice Presentation Edgar Van den Broek

Basic model Design Synchronization Design phase BIM design process, in practice Installation consultant Structural engineer Architect X BIM Seminar, Nice 3

Basic model Design Synchronization Design phase BIM design process, in practice Installation consultant Structural engineer Architect BIM Seminar, Nice 4

BIM design process, in practice Installation consultant Structural engineer ArchitectInstaller(s) (Principal) contractor Supplier(s) Commissioning client Project managerBuilding engineer Basic model Design Synchronization Cost consultant Design phase BIM Seminar, Nice 5

Construction costs Quantities Unit costs Classification General expenses Budget Cost control BIM packages featuring a cost module Specialist software required e.g.: IBIS4BIM BIM Seminar, Nice 6

Quantity and cost estimating - process Determining the level of detail Volumes + key indicators Elements / Technical solutions Preliminary design Final design BIM Seminar, Nice 7

Quantity and cost estimating - process Determining the level of detail Preparing a scale model of the building Preparing a project Importing quantities /characteristics BIM Seminar, Nice 8

Quantity and cost estimating - process Determining the level of detail Preparing a scale model of the building Preparing a project Importing quantities /characteristics Linking recipes BIM Seminar, Nice 9

Quantity and cost estimating - process Determining the level of detail Preparing a scale model of the building Preparing a project Importing quantities /characteristics Linking recipes Generating reports BIM Seminar, Nice 10

Quantity and cost estimating - process Determining the level of detail Preparing a scale model of the building Preparing a project Importing quantities /characteristics Linking recipes Generating reports Periodic synchronization BIM Seminar, Nice 11

EstimatingCost controlCost advice Consequences for the cost consultant The emphases shifts from estimating to value engineering … BIM Seminar, Nice 12

automobileBIM Analogy with automobile (r)evolution + + = Automobile Carriage We have witnessed the first revolution, but a long evolution is yet to come… BIM Seminar, Nice 13

Organization ConstructionCost consultantInstallation consultantStructural engineerBuilding engineerArchitect Model management Workflow management Project manager BIM Seminar, Nice 14

Success factors for BIM and Cost Estimating Enter only approved solutions into the central model Coordinate synchronization moments Property level authorazations Gradually increase the overall level of detail Uniform standards for property description and styles of drawing Avoid loose/suspended objects BIM Seminar, Nice 15

Future profits for Quantity Surveyor Quantities generated from the 3D model -> improves quality of BOQ -> improves quality of estimating It maximases the capabilities of a QS -> Integrated Project Delivery New method of Cost Modelling Standard Method of Measurement (SMM) BIM Seminar, Nice 16

Future profits for Cost Engeneer Life Cycle Assessment, transfer knowledge form design till exploitation Cost Advisory tool, alternatives Change of roles during the design proces; -> opportunities by facilitating the designers -> no longer stand alone, you become part of the designteam BIM Seminar, Nice 17

BIM Seminar, Nice 18