Project 3 Hints
Landfill Site
Remedial Alternatives Alternative A - Do Nothing Alternative B - Impermeable Cap Alternative C - Cap and Confining Wall Alternative D - Cap, Slurry Wall and Drain Alternatives E, F and G – Your Alternatives
Part A Create the “working directory” C:\temp\Proj3a Download the Vista1.gwv.zip file (from class webpage) Un-Zip the file to get the file Vista1.gwv Place the file in the working directory Open the model Vista1 Run the model (steady state)
Part a
Part B Create a new “working directory” C:\temp\Proj3b Keep a separate working directory for each part, so you can back up if you make a mistake Save (or copy) the file Vista1.gwv from C:\temp\Proj3a to Select MODELS – PATHS TO MODELS Set working directory to:
Part b - Transient Model Setup In Part B: Convert the model to a transient model with 1 stress period
Stress period Types Select: Stress Period Types Set all to transient Set up the Stress periods Stress period length = 972,000,000 seconds (= 30.82 years) 20 time steps Time step multiplier of 1.5
Specific Yield Set specific yield = 0.28
Part b - Initial Heads Select: Model MODFLOW Package Options Initial Heads tab Select: Initial Head Location: Read Heads Directly from Binary Head Save File Browse Select: *.hds file from Part A MAKE SURE THE Part A HDS FILE IS IN A DIFFERENT FOLDER FROM THE PART B FILES!
Part B – Impermeable Cap Set recharge over cap area to 0
Recharge
Part C – Confining Wall Use a “Wall” BC – set K ~0
Confining Wall R30 R45 C15 C35 Landfill Wall
Part d - Drains Note
Part d - Drains Wall C15 C35 Drain R30 Landfill R45