The Transverse Damping Systems for the SIS100 & SIS300 Synchrotrons at the Facility of Antiproton and Ion Research (FAIR at GSI) V.M. Zhabitsky, N. Lebedev,

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

MUSIC - Past, Presence, and Future of a detector concept Walter F.J. Müller, GSI Bormio 2004.
Heavy Ion Cancer Therapy
FAIR accelerator R&D Oliver Kester GSI Helmholtzzentrum für Schwerionenforschung Darmstadt and IAP Goethe-Universität Frankfurt.
Damping Rings Impedance budget and effect of chamber coating
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Mitglied der Helmholtz-Gemeinschaft Beam Cooling at HESR in the FAIR Project 12 th September 2011 Dieter Prasuhn.
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
BEAM STABILITY IN SYNCHROTRONS WITH DIGITAL TRANSVERSE FEEDBACK SYSTEMS IN DEPENDENCE ON BEAM TUNES V.M. Zhabitsky Joint Institute for Nuclear Research.
ICA Applied to Long Bunches Jeff Kolski Informal workshop on ICS and High Intensity accelerators Indiana University Los Alamos Nation Laboratory 3/17/10.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Ulrich RaichLinac-4 instrumentation day May 2007 Longitudinal Bunch Shape Monitor U. Raich.
Longitudinal instabilities: Single bunch longitudinal instabilities Multi bunch longitudinal instabilities Different modes Bunch lengthening Rende Steerenberg.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Summary of visit to BNL and LARP workshop High Bandwidth Feedback perspective Preliminary Report by W. Hofle
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Research in Particle Beam Physics and Accelerator Technology of the Collaboration IKP Forschungszentrum Jülich & JINR A.N. Parfenov for the Collaboration.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 1/23 Acknowledgements: T. Kramer (AB/BT), E. Shaposhnikova (AB/RF) Wolfgang.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
Coupled bunch instabilities in the CERN PS
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
CR: status and activities at BINP I.Koop, BINP, Novosibirsk O.Dolinskyy, GSI,Darmstadt , MAC, GSI, Darmstadt.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Rende Steerenberg, CERN, Switzerland
RF acceleration and transverse damper systems
Oleksiy Dolinskyy December 1st, 2014
A.Lachaize CNRS/IN2P3 IPN Orsay
Longitudinal beam parameters and stability
A. Al-khateeb, O. Chorniy, R. Hasse, V. Kornilov, O. Boine-F
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Transverse Feedback System (LHC Damper)
Recent Electron Cloud Studies at CESR and Future Plans
M. Mehler1), H. Klingbeil1), B. Zipfel2)
SPS Transverse Damper System
Progress towards Pulsed Multi-MW CERN Proton Drivers
Limits on damping times
I Alexander Nass for the JEDI collaboration
LHC (SSC) Byung Yunn CASA.
AB-RF-FB section meeting
Proposal for a CESR Damping Ring Test Facility
CEPC SRF Parameters (100 km Main Ring)
Presentation transcript:

The Transverse Damping Systems for the SIS100 & SIS300 Synchrotrons at the Facility of Antiproton and Ion Research (FAIR at GSI) V.M. Zhabitsky, N. Lebedev, E. Gorbachev (JINR), U. Blell, P. Spiller (GSI) 5 th Workshop on Scientific Cooperation between German Research Centres and JINR 18 January 2005 JINR

JINR- CERN - GSI2 CERN –W.Hofle, LHC ADT Project Engineer (Damper), T.Linnecar, LHC A Project Engineer (RF), R.Louwerse, J.-F.Malo, J.Tuckmantel JINR –V.M.Zhabitsky, N.I.Lebedev, E.V.Gorbachev, A.A.Fateev, A.A.Makarov, V.A.Melnikov, S.V.Rabtsoun, V.A.Bogdanov, N.V.Pilyar, V.G.Shabratov, K.P.Sychev, M.G.Pushkin, B.G.Komarov, V.I.Koryako, V.V.Kovalev + 10 pers. JINR The LHC Transverse Damping System The LHC Transverse Damping System CERN – Russia - JINR

JINR- CERN - GSI3 Key Technologies in Accelerator: Magnets –B, Q RF System –E–E Feedback Systems –N, ε

JINR- CERN - GSI4 FAIR at GSI Highest beam intensities Brilliant beam quality Highest beam power Higher beam energies

JINR- CERN - GSI5 Bunch Bunch current Induced current Differential current Induced magnetic field Vacuum chamber Coherent Transverse Oscillation If the bunch is displaced form the centre of the vacuum chamber it will drive a differential wall current. This leads to a magnetic field, which deflects the bunch.

JINR- CERN - GSI6

JINR- CERN - GSI7 W. Hofle CERN AB/RF Example SPS (CNGS type beam, 1 batch, protons): 3 ms growth rate 0.5 ms damping time 50 + turns relative silence at injection injection with damper off damper being switched on 7 ms (300 turns) after injection Transverse Feedback (LHC Damper)

JINR- CERN - GSI8 SIS100 & SIS300 Dampers Transverse Feedback System Transverse Feedback System with a real-time digital signal processing: damping of transverse injection oscillations, feedback curing transverse coupled bunch instabilities, excitation of transverse oscillations for beam measurements and other applications. General Parameters of SIS100 & SIS300 Machine Circumference: m Beam revolution frequency: kHz Beam revolution time: μs Horizontal tune at injection: Q H =26.9 Vertical tune at injection: Q V =16.7 Energy ( 238 U): – 34 GeV/u Intensity ( 238 U 73+, 238 U 28+ ): A JINR

JINR- CERN - GSI9

JINR- CERN - GSI10 Basic Parameters damping of transverse injection oscillations –(E + β 0 cB )ds ±6.0 kV (δQ - ?) feedback curing transverse coupled bunch instabilities –(E + β 0 cB )ds ±1.3 kV Strength of the kicker: –(E + β 0 cB )ds ±9.3 kV Electric kicker (L=0.5m, Δ=10cm): U = ±1.86 kV

JINR- CERN - GSI11 Bandwidth and Frequencies f min = min|k - Q|f 0 = 0.1f 0 = 10.4 kHz f max f b /2 f max (for kicker) 1/4π σ t = 3.2 MHz ( σ t =25ns ) Bunch r.m.s. spectral frequency: = 1/2π σ t = 6.4 MHz Stability of high order harmonics - ? Sampling rate: 20MSPS Transverse emittance growth rate: –τ -1 = (4/3) f (b-1) δQ 2 –τ = 84 hours (f 0 = 104kHz; b=12-1; δQ = 0.005)

JINR- CERN - GSI12 SIS100 & SIS300 Dampers JINR

JINR- CERN - GSI13 A fragment of an assembly drawing of a vertical kicker: 1 - the vacuum tank, 2 - electrodes, 3 - ceramic rings, 4 - the fixing device of the electrode module, 5 - the high voltage connection, 6 - a plate for installation of target alignment, 7 - the higher order mode connection. High voltage on electrodes: ±1400 V Bandwidth: 10 – 3200 kHz Operating vacuum: mbar JINR Kicker

JINR- CERN - GSI14 Class of operation: AB Input amplitude: ±150 V Output amplitude: ±1400 V Bandwidth: 10 – 3200 kHz JINR Power Amplifier

JINR- CERN - GSI15 The experimental results confirm a possibility of realisation of amplifier on the basis of the circuit with parallel control (cascode), which is considered as a perspective development of the system. ascode amplifier LHC Damper: investigations of a cascode amplifier JINR

JINR- CERN - GSI16 Driver Amplifier Top viewView on transformers Front viewRear view Class of operation: A Input amplitude: ±1 V Output amplitude: ±150 V Bandwidth: 10 – 3200 kHz

JINR- CERN - GSI17 JINR Central Signal Processing Field Programmable Gate Array (FRGA) technology Clock frequency: 8f RF 20MHz Digital input signal: ±12 bit Analog output amplitude: ±1 V Signal processing resolution: 12 bit Programmable delay: μs, ++50ns Fine delay: 1 – 50ns, ++1ns (??)

JINR- CERN - GSI18 Dampers: Planned Schedule Year: Prototype Pre-production unit Prototype Pre-production unit Prototype Pre-production unit Production Series Spares Tests of the TFS at the SIS100 designconstructiontesting TFS kicker JINR amplifier CSP

JINR- CERN - GSI19 Costs Estimates Costs Estimates for 4 units: equipmentquantityprice, Beam position monitors2 Monitor electronics2 Central Signal Processing Driver amplifiers Power amplifiers Kicker16000 TOTAL COST OF 1 UNIT: Costs Estimates for 1 unit

JINR- CERN - GSI20 The Transverse Damping Systems for the SIS100 & SIS300 Synchrotrons at the Facility of Antiproton and Ion Research (FAIR at GSI) Status (November 2004): Technical proposal was prepared by: –Accelerator Development Group, Gesellschaft für Schwerionenforschung mbH Darmstadt –Laboratory of Particle Physics of the Joint Institute for Nuclear Research

JINR- CERN - GSI21 LHC Damper Transverse Feedback System Transverse Feedback System with a real-time digital signal processing: damping of transverse injection oscillations, feedback curing transverse coupled bunch instabilities, excitation of transverse oscillations for beam measurements and other applications. General LHC Parameters Machine Circumference: m Beam revolution frequency: kHz Beam revolution time: 88.9μs Horizontal tune at injection: Q H =64.28 Vertical tune at injection: Q V =59.31 JINR

JINR- CERN - GSI22 JINR The LHC Transverse Damping System The LHC Transverse Damping System CERN – Russia - JINR The Damper is in the list of the systems that must operate already for first beam injection. Therefore the schedule of construction, installation and testing the Damper in the machine must be completed before November 2006.

JINR- CERN - GSI23 LHC Damper. Layout of one transverse feedback system. There are four independent systems, one per plane (H/V) and beam. JINR JINRs obligations: 20 deflectors, 40 amplifiers.

JINR- CERN - GSI24 JINR The LHC Transverse Damping System The LHC Transverse Damping System CERN – Russia - JINR Electrostatic kicker The design stage was successfully completed at the Laboratory of Particle Physics (JINR) and its results were accepted by CERN. Modern simulation methods based on Microsim PSpice and Inventor were used. Wideband amplifiers

JINR- CERN - GSI25 The LHC Transverse Damping System Assembly of the amplifier and the kicker at the tests bench. LPP, October JINR Final amplifier design

JINR- CERN - GSI26 The LHC Transverse Damping System JINR Radiophysical characteristics of the power amplifier: 7.5 kV; 10 kHz – 10 MHz. LPP, JINR, December 2004.

JINR- CERN - GSI27