TT20 MD for the NA61/SHINE fragmented beam experiment

Slides:



Advertisements
Similar presentations
R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
Advertisements

5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
MERIT beam optics I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting July 16, 2008.
New optics for the PSB measurement line J.L. Abelleira Thanks to B. Mikulec, G.P. De Giovanni, Jean-Francois Comblin MSWG, 13 Feb 2015.
MERIT beam spot from optics (update of July 16,2008 talk) I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting September 25, 2008.
Beam Loss in the Extraction Line for 2 mrad Crossing Angle A.Drozhdin, N.Mokhov, X.Yang.
Concept for the New Detector Chamber at the ESR Ion beam Internal Target Region  Lab *)  Flange axis Covered  range Flange size in mm A90° – 80°83°95°
Diffuser in G4MICE Victoria Blackmore 09/03/10 Analysis Meeting 1/8.
MARS flux simulations - update Sergei Striganov Fermilab August 12, 2009.
SPS aperture measurements MSWG 26/03/2013 Stéphane Cettour Cavé.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Specifications for PSB Injection System Upgrade C. Bracco, J. Abelleira on behalf of BTP Acknowledgments: E. Benedetto, C. Carli, V. Dimov, L.M. Feliciano,
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
Implantation rates at the focal plane of Super-FRS Some Simulations for AIDA Detectors.
Optics studies for the LHC beam in the TT2-TT10 line and effect of the QKE58 suppression E.Benedetto, A.Franchi Thanks: G.Arduini, D.Jacquet, O.Berrig,
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Beam collimation in the transfer line from 8 GeV linac to the Main Injector A. Drozhdin The beam transfer line from 8 GeV Linac to the Main Injector is.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
LSS1 post LS2 F.M. Velotti, B. Goddard. Q-Dogleg in LSS1 The quadrupole misalignment in LSS1 was needed to dump horizontally wide beams (e.g. FT beam.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
2/07/2014 EMITTANCE MEASUREMENTS MTA BEAMLINE. PERFORMANCE All stable optics tunes work 4 very different operations have been installed Experimental tune.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Optimization of the Collider rings’ optics
NA61 news and plans (May 2013-October 2013) Publications:
Update of the SR studies for the FCCee Interaction Region
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
Status on Work for Splitter FS and Dilution System FS
Impact of remanent fields on SPS chromaticity
LIU, ABP-CWG, PBC, miscellaneous
of secondary light ion beams
of secondary light ion beams
Benchmarking the SPS transverse impedance model: headtail growth rates
CNGS Proton Beam: Introduction
Multiturn extraction for PS2
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Magnetic gap calculation
Proton Beam Diagnostics
HSC (Hadron Synchrotron Collective effects section)
Progress of SPPC lattice design
TT20 MDs for the NA61/SHINE fragmented beam experiment
MSWG Report – SPS OP Crew
Monday 24 October hours of 25ns MD
SPS MEASUREMENTS WITH IPMs IN 2007
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Another Immortal Fill….
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

TT20 MD for the NA61/SHINE fragmented beam experiment Friday 22/7 2011 O.Berrig Thanks to G.Arduini, D.Manglunki, I.Efthymiopoulos, M.Gazdzicki(NA61) and members of the OP group (K.Cornelis, J.Axensalva, S.Massot, J.Wenninger)

History of Lead ions (Pb) in the TT20 line YEAR ION type ENERGY Q-SPLIT TARGET 2002 Pb(82,208) Low energy with Q-split T2, T4 and T6 2007 Pb(82,208)* No Q-split 2010 80 GeV/u [202.93 GeV/c] 13 GeV/u [ 32.98 GeV/c] T2 (Only NA61) 2011 157.7 GeV/u [400.00 GeV/c] 80 GeV/u [202.93 GeV/c] 40 GeV/u [101.46 GeV/c]   Reports from NA61/SHINE: http://indico.cern.ch/conferenceDisplay.py?confId=121442 * NA61/SHINE take first measurements

TT20 schematic The targets T2, T4 and T6 are in this building TT23 SPLITTER 2 Entry at MSSB.220441 Stop at MSSB.220460 TT21 TT25 TT24 SPLITTER 1 Entry at MSSB.211713 Stop at BTV.211743 T4 T6 T2 TT22

T2 target The T2 target is 2mm wide 4

T2 Target 2010 optimization. Before and After. NA61 still needs doubling of the intensity on the T2 target !!!

Simulation THIS IS THE REASON FOR THE MD !!! The simulation predicts a one sigma spot-size of: 1.02 mm HOR 0.44 mm VER We measure a full spot size of: 7 mm HOR (allow for factor 5) 8 mm VER (allow for factor 3.5) THIS IS THE REASON FOR THE MD !!!

Simulation What can go wrong in the simulation ? Positions and strengths of quadrupoles not correct Optical functions at extraction not correct Dispersion is bigger in reality that in the simulation Emittance is bigger in reality that in the simulation Even if we do not find out why the simulation is wrong, we have other possibilities to reduce the spot size: Find optimum for beam size: Spot-size optimization can be made better, if limitations in aperture are not real. In this case we can get more degrees of freedom, which can be used to reduce the spot size.

Tests to be done 1. and 2. : Load different optics. Measure the beam profiles along the TT20 line. Compare with simulations. This will determine the optical functions at extraction and also determine differences in positions and strengths of the quadrupoles. Make a knob that can move the position of the spot upstream or downstream of the T2 target. Measure profiles at the T2 target for different spot positions. Will give the correct position of the T2 target. 3. Measure transverse displacement of the beam at the T2 target, as a function of the SPS energy. From this measurement we can calculate the dispersion at the T2 target 4. Measure emittance in the SPS

Tests to be done Are aperture limitations real? The aperture limitation from BTV.230925 did not really exist, but there are maybe other limitations that are not in our files:

My worries The different optics must be loaded into the operational database – before the MD!! The files will only be ready a few days before the MD. Only Jorg can load the optics. Will he have time enough? Will the steering program work with the new optics? This is important because the beam must be steered into the upper part of the SPLITTERs:

My worries I do not know how to do the dispersion measurements ( by changing the energy in the SPS and measure the transverse displacement of the beam at the T2 target). Who can help ? We need to reduce the intensity of the extracted beam to the TT20 line, because we do not want to shoot a hole in the vacuum chamber. Who can help? Conclusion Another MD is foreseen on 26 September, for the test of the final optimized optics.