LCLS Commissioning Parameters

Slides:



Advertisements
Similar presentations
ERLP Overview Hywel Owen ASTeC Daresbury Laboratory.
Advertisements

ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
C.Limborg-Deprey Beam Dynamics Justifying L01 November 3 rd 2004 Beam Dynamics Justifications of modification of.
Comments from LCLS FAC Meeting (April 2004): J. Rößbach:“How do you detect weak FEL power when the gain is very low (few hundred)?” K. Robinson:“Can you.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Low Emittance RF Gun Developments for PAL-XFEL
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.
Twin bunches at FACET-II Zhen Zhang, Zhirong Huang, Ago Marinelli … FACET-II accelerator physics workshop Oct. 12, 2015.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
X-band Based FEL proposal
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
FLASH. Free-Electron Laser in Hamburg TTF/FLASH: Injector Performance Dark Current Video ‘flags’ Comments based on Desy visit, 5 th May, /19/2010Desy.
MAX IV linac overview and scope of automation Sara Thorin.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
S.M. Polozov & Ko., NRNU MEPhI
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
Status and Interest of the X-ray FEL SINAP
Drive laser specifications:
Tunable Electron Bunch Train Generation at Tsinghua University
Gu Qiang For the project team
BC2 Commissioning Parameters
MIT Compact X-ray Source
XFEL Project (accelerator) Overview and recent developments
ERL Main-Linac Cryomodule
Needle Cathodes for RF Guns
LCLS Gun Commissioning Status & Plans David H
What did we learn from TTF1 FEL?
LCLS Commissioning Parameters
LCLS Injector Commissioning Dates ( )
CW Energy Recovery Linac for Next Generation of XFELs
Injector: What is needed to improve the beam quality?
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Z. Huang LCLS Lehman Review May 14, 2009
Selected simulations for XFEL photo injector
Design of Compression and Acceleration Systems Technical Challenges
LCLS Commissioning P. Emma, et al
Modified Beam Parameter Range
Drive laser specifications:
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Simulations for the LCLS Photo-Injector C
Linearization of Bunch Compression (2nd order )
LCLS Commissioning Parameters
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
J. Seeman Perugia Super-B Meeting June 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Minimized emittance for high charge with multi cell superconducting guns and solenoidal focusing D. Lipka, BESSY.
Experience with photoinjector at ATF
Presentation transcript:

LCLS Commissioning Parameters for Phase-III (FEL) Parameter Value Comments RF rate 30 Hz 30 Hz in linac - 120 Hz in gun hot test Beam rate ≤30 Hz 30 Hz e- beam as baseline – 10 Hz or lower when needed – 120 Hz testing when possible Drive-laser rate 30 Hz during e- commissioning - shutters provide lower e- rate Bunch charge 0.2-1 nC 0.2 nC nominal – up to 1 nC or well below 0.2 nC as desired for optimizing brightness Drive-laser pulse length 6 ps fwhm 6-ps fwhm at 0.2 nC, but variable with charge when needed Gun gradient 120 MV/m Baseline level, as used in ’07 and ’08 already Nov. 4, 2006