Preliminary PXL support models with assembly fixtures

Slides:



Advertisements
Similar presentations
Step-by-step assembly instructions
Advertisements

Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
Orthographic Projection
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
We Design Innovative Bus Interiors LED Retrofit Systems Designed ForPretoria Hadley/Transmatic L-20 and Hadley/Transmatic L-20 Fluorescent Aisle Lighting.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
HFT PXL Mechanical July 2010 Howard Wieman LBNL 1.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Production of precise large PCB’s Introduction to the problem Achievement in collaborating with industry (Print Electronics in IL and MDT in Italy). Conclusions.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
 What is joinery? In our case – we will be looking at the fastening or combining of two or more boards together when building our projects.  It is important.
Jigs and Fixtures.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1-Meter Cross-Coil Prototype The mechanical design was driven by two primary requirements; to Improve the mechanical precision in the placement and alignment.
Support and alignment of PXL box with MSC, operation steps
PXL Mechanical Hinge rework in aluminum and carriage redesign Kinematic rework and analysis Insertion test - detailing and fabrication instructions Spatial.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
1 STAR HFT Pixel Detector Howard Wieman Lawrence Berkeley National Lab.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
PMG Meeting February 2000 A Split Central Silicon Tracker W. E. Cooper on Behalf of the D0 Silicon Group 3 February 2000.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
How to move your horn.. 1.This one is a shot of the horn with the acorn nut removed. STEP 1.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Preliminary PXL support models with assembly fixtures.
Assembly of steering.
VIEW SERIES with Sliding Door
Rear end assembly.
SeaPerch Structural System
SeaPerch Structural System
Hand-cranked Windmill Assembly Instructions
Integration issues at IHEP
Step-by-step assembly instructions
Step-by-step assembly instructions
Section Views.
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Detail and Assembly Drawing
SeaPerch Structural System
Step-by-step assembly instructions
Station and Module Support Frames
Step-by-Step Assembly Instructions – Cube Version
SeaPerch Structural System
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

Preliminary PXL support models with assembly fixtures http://www-rnc.lbl.gov/~wieman/PIT_fixture_assembly.zip solidworks model http://www-rnc.lbl.gov/~wieman/PIT_fixture_assembly.EASM e-drawing http://www-rnc.lbl.gov/~wieman/RailandKinematicMountOverview.ppt this document

display state: disappear fixtures MSC_PXL.SLDASM 1 of 4 guide cams 1 of 4 carriage rails 1 of 8 rail bond pads display state: disappear fixtures and ist 3 kinematic mounts with bond pads display state: disappear fixtures

cross section view showing encroachment on IST PXL kinematic mount bond pad on outside of PST IST support frame

PIT_rail_mount_20mm.SLDASM removable post allows disconnect from rails , required to remove rail bonding fixture connect and disconnect from external test supports

PIT_fixture_assembly.SLDASM (display state: Default_DisplayState-1) grand_master_kin_assembly.SLDASM external rail supports for testing insertion of detector and engagement with kinematic mounts before PIT exists rail_holder_assembly.SLDASM end supports position end flanges for bonding to PIT and position rail_holder_assembly.SLDASM note: the external rail support and PIT don’t occur together as shown here. It is either one or the other supporting the rails

rail_holder_assembly.SLDASM provides precision placement of the rails for two gluing operations: bonding to PIT match bonding to external rail supports precision drivers: glue bond gap to PIT ( 50 m ) avoid binding ( 25 m or 200 m, depends on carriage design) proper engagement with kinematic mounts ( 400 m ) detector collision avoidance ( 250 m ) with rails numbers give allowable envelope size

grand_master_kin_assembly.SLDASM this assembly (shown with a PXL half) has 3 functions: placement of the kinematic mounts for bonding to the PST support of the kinematic mounts for tests of detector insertion mechanism Support of detector halves in the Coordinate Measuring machine for spatial mapping operation. Position of the kinematic mounts should accurately match the locations in the PST

position reproducibility 10 m kin_assembly_east_or_west_with_bells.SLDASM grand_master_kin_assembly.SLDASM

MSC.SLDASM used latest model from Eric and Jason with following changes: increased length of PIT added a flange at the original PIT ending drilled some holes for the rail mounts and kinematic mounts cleaned up some coordinate frame alignments