Entry Capacity - update

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Ofgem Open Letter – Next Steps Transmission Workstream
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
SunSatFriThursWedTuesMon January
September 2008 QSEC auction - Allocations Transmission Workstream
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Transmission Planning Code – Draft Document
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Planning Code
Transmission Workstream, 2nd March 06
DRSEC Update August 4th 2009.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Update on Exit Capacity Substitution and Revision
Development of Entry Capacity Substitution
QSEC auction timetable
Entry Capacity Substitution
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
The Treatment of “Spare / Sterilised” Capacity
Review of Trade and Transfer Winter 09/10
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Transmission Workstream DN Interruption Update - Introduction
Transmission Workstream 1st February 2007
IECR Incremental Step Size
Incremental Entry Capacity Release Methodology Statement
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream, 1 Mar 07
Entry Capacity Transfers - Constrained Period
Gemini Contingency Guidelines
Gas Customer Forum 28 July 2008
Presentation transcript:

Entry Capacity - update Transmission Workstream 2 February 2006

AMSEC auction Invitation to tender for next AMSEC auction issued on 18 January 2006 Users invited to make applications for monthly capacity for period April 2006 to March 2008 4 tranches will be held on: 14, 17, 22, 27 February 2006 Each tranche will make available 25% of available capacity with 4th tranche including any unsold from previous tranches Significant quantities of capacity available at many ASEPs……

Unsold Capacity (1) Note – there are some variations in monthly quantities within a quarter

Unsold Capacity (2) Note – there are some variations in monthly quantities within a quarter

Optimisation of Capacity Demand for capacity may exceed available levels no opportunity to obtain incremental capacity through AMSEC We are not intending to release beyond current baselines unless supply/demand conditions allow ahead of/on gas day limited investment opportunities that could now be undertaken to allow release of additional capacity for Apr 06-Mar 08 Ofgem’s 2nd consultation on TPCR considers methods to optimise available capacity between entry points e.g. zonal baselines, substitution incentives May be benefits in seeking earlier implementation of optimisation methods in UNC at future workstreams If you wish to discuss ideas, please call!