in a high intensity beam

Slides:



Advertisements
Similar presentations
Beam tests of Fast Neutron Imaging in China L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang 2, X.
Advertisements

Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 central detector meeting : 2 december 2009 Cea Saclay CERN.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
D. Peterson, “ILC Detector Work”, Cornell Group Meeting, 4-October ILC Detector Work This project is supported by the US National Science Foundation.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis -
WG1 summary P. Colas, S. Duarte Pinto RD51 Collaboration meeting in Bari October 7-10, 2010.
P. Colas on behalf of LCTPC. 2 detector concepts : ILD and SiD SiD: all-silicon ILD: TPC for the central tracking 15/05/2012P. Colas - LCTPC2 Both based.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
Preliminary Micromegas Data Analysis Results D. Attié, P. Colas, M. Dixit, M. Riallot, Yun-Ha Shin, S. Turnbull, W. Wang 20/05/20101Wenxin Wang - LC-TPC.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Stanford, Mar 21, 2005P. Colas - Micromegas TPC1 Results from a Micromegas TPC Cosmic Ray Test Berkeley-Orsay-Saclay Progress Report Reminder: the Berkeley-Orsay-
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
Beijing, Feb.6, 2007 P. Colas - Micromegas TPC 1 Micromegas TPC studies in a 5 Tesla magnetic field with a resistive readout D. Attié, A. Bellerive, K.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin, R. Woods TPC Tests Analysis Meeting, DESY 28 May 2009.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
29/09/2010 1Wenxin.Wang_EUDET annual workshop D. Attié, P. Colas, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang and all the LC-TPC collaboration.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Wenxin Wang 105/04/2013. L: 4.7m  : 3.6m Design for an ILD TPC in progress: Each endplate: 80 modules with 8000 pads Spatial Resolution (in a B=3.5T.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
P. Colas on behalf of LCTPC. Strategy for Micromegas The Micromegas option is studied within the same (EUDET) facility as the other options (see R. Diener’s.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Astrophysics Detector Workshop – Nice – November 18 th, David Attié — on behalf of the LC-TPC Collaboration — Beam test of the.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
NoV. 11, 2009 WP meeting 94 1 D. Attié, P. Colas, E. Ferrer-Ribas, A. Giganon, I. Giomataris, F. Jeanneau, P. Shune, M. Titov, W. Wang, S. Wu RD51 Collaboration.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Micromegas projects and future tests Phone meeting August 26th, 2009.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
P. Colas D. Attié, P. Colas, I. Giomataris, W. Wang (Irfu) M. Dixit, N. Shiell, P. Hayman (Carleton U.) G. De Lentdecker (Brussels)
Wenxin Wang (D. Attié, P. Colas, E. Delagnes, Yuanning Gao, Bitao Hu, Bo Li, Yulan Li, M. Riallot, Xiaodong Zhang)
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, Y-H Shin S. Turnbull, R. Yonamine (Carleton, KEK, Saclay)
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
ATLAS muon chamber upgrade Within the MAMMA collaboration Arizona, Athens(U, NTU, Demokritos), Brookhaven, CERN, Harvard, Istanbul, Naples, CEA Saclay,
The 1m2 Micromegas prototype for hadronic calorimetry
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
Atlas: Upgrade Phase I Massimo Della Pietra.
Large TPCs for HEP ILC-TPC & Fast Neutron detector
RD51-WG X June test beam experience: useful information for October
Single GEM Measurement
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Large Area Endplate Prototype for the LC TPC
DHCAL and MICROMEGAS at LAPP
Power pulsing of AFTER in magnetic field
‘Octopuce’ beam test D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz I’m here to present.
Micromegas module for ILC-TPC
Recents Analysis Results From Micromegas TPC
Micromegas TPC D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang, and all the LC-TPC collaboration.
TPC Paul Colas Technical meeting, Lyon.
Dan Burke1, P. Colas2, M. Dixit1, I. Giomataris2, V. Lepeltier3, A
7-Module beam test D. Attié, P. Colas, W. Wang,
TPC chamber for Medipix2/TimePix
a TPC with resistive Micromegas
News from Micromegas modules
Status of LCTPC beam test analysis in Canada
D. Attié, P. Colas, K. Fujii,T. Matsuda,
Covering a Large Area ILC-TPC endplate
News from Micromegas modules
Presentation transcript:

in a high intensity beam Micromegas TPC test in a high intensity beam D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang I’m here to present a TPC review LC-TPC Phone meeting 109 David.Attie@cea.fr Astrophysics Detector Workshop – Nice – November 18th, 2008

RD51 Mini-week, CERN – WG7 – February 24, 2010 Data taking diagram Goliath magnet Vdrift =1 kV CAEN 471A (NIM) SHV cables Vmesh = 380 V Beam trigger T2K electronics 1728 channels Back-end electronic (ML405) Optical fibre Lemo LV-TTL TCP/IP via ethenet LV (+5 V) PC T2K DAQ on Linux T2K gas (5L/h) 500 Go Standard PC Power supply HDD Hall Control room Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Detector description 1/2 1726 pads Micromegas resistive Kapton bulk 17 cm 23 cm 24 rows x 72 columns; <pad size> ~ 3.2x7 mm2 Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Detector description 2/2 Total weight: ~20 kg Radiation length: 40% (2×1.8 cm of aluminium) B field Top 27 cm 40 cm Bottom 35cm 11 cm Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Beam test at CERN (RD51, H4 beam) Data were taken with muons mostly at 1 kHz and with hadrons at intensities up to 180 kHz (over a 5 cm x 1cm region) and 150 GeV energy. The drift length was 28.8 mm and the field 240 V/cm The gas was T2K The mesh voltage was 380 V, which corresponds to a gas gain of 2500 The detector peformed perfectly normally, as usual We also tested a new, faster and multimodule DAQ. We obtained read-out rates of 40 Hz. Micromegas TB2010 RD51 Mini-week, CERN – WG7 – February 24, 2010

Pad signals at 180 kHz hadrons WG7 RD51 Mini Week – CERN – September 24, 2009

Beam profile (run 565, 14 kHz pions) WG7 RD51 Mini Week – CERN – September 24, 2009

RD51 Mini Week – CERN – September 24, 2009 WG7 RD51 Mini Week – CERN – September 24, 2009