OHM MRO/PM Solution & Improvement OHM OUTSOURCING MRO TASKS.

Slides:



Advertisements
Similar presentations
MORE FOR LESS Broadtec Ltd. was incorporated in The Company is specialized in developing ERP system for broadcast industry, Turn-key,
Advertisements

WEB AND WIRELESS AUTOMATION connecting people and processes InduSoft Web Solution Welcome.
Introduction to our Facilities Management Services
SBS Vendor Management™
© 2010 IBM Corporation Business Analytics on System z – Capacity Management Solution Dave Jeffries - WW Business Analytics on System z.
Guilford County SciVis V102.03
Merit Consulting Terje Myrseth MUA – October 2008.
Transforming Organizations
Ch 3 System Development Environment
OBP Research Oy for simpler creation of embedded systems.
Track, View, Manage and Report on all aspects of the Recruitment Process… with ease!
Modern Correctional Facilities Need:  Robust and Reliable Data Management  Efficient data entry and manipulation  Versatile Professional Report Generation.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Overview Lesson 10,11 - Software Quality Assurance
WNT Client/Server SDK Tony Vaccaro CS699 Project Presentation.
15 1 Chapter 15 Database Administration Database Systems: Design, Implementation, and Management, Seventh Edition, Rob and Coronel.
Jw consulting SAP R/3 QM Workshop Rheinfelden Kurt Fantes Prototyp jw LIMS.
1 Case Study: Starting the Student Registration System Chapter 3.
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
COMPANY PRESENTATION 2013 EAZ ltd.. Who we are  EAZ ltd. /Electrical equipment plant/ is established in the city of Perushtitsa 46 years ago.  The main.
INTRODUCTION. Concepts HCI, CHI Usability User-centered Design (UCD) An approach to design (software, Web, other) that involves the user Interaction Design.
Computerised Maintenance Management Systems
Chapter 14 Network Design and Management. Introduction Properly designing a computer network is a difficult task. It requires planning and analysis, feasibility.
Xenios Papademetris Departments of Diagnostic Radiology and Biomedical Engineering Yale University School of Medicine.
COMP 2903 A10 – Software Engineers and Computer Programmers Danny Silver JSOCS, Acadia University.
Computers & Employment By Andrew Attard and Stephen Calleja.
Value Driven Maintenance Discover The Hidden Treasure In Your Organization Mark Haarman, Managing Partner Birmingham, 18 April 2012.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
WebTMA Accounting Module Basics Luis Pino TMA Systems.
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
11.1 © 2007 by Prentice Hall 11 Chapter Building Information Systems.
 Maintains the Instrument Database  Generates the Calibration Schedules  Maintains Calibration Records  Provides Facility to enter All types of.
©Ian Sommerville 2000 Software Engineering, 6th edition. Chapter 1 Slide 1 Software Processes (Chapter 3)
Chapter 2: Software Process Omar Meqdadi SE 2730 Lecture 2 Department of Computer Science and Software Engineering University of Wisconsin-Platteville.
Lumberton High Sci Vis I V  Careers in medical imaging range from entry-level technologists through advanced scientists holding doctorates. Medical.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
© ABB University - 1 Revision C E x t e n d e d A u t o m a t i o n S y s t e m x A Chapter 4 Engineering Workplace Course T314.
Computer Concepts 2014 Chapter 10 Information Systems Analysis and Design.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Chapter 11 Managing Application Development. Agenda Application management framework Application management issues Criteria for development approach Development.
SOFTWARE ENGINEERING. Objectives Have a basic understanding of the origins of Software development, in particular the problems faced in the Software Crisis.
Software Engineering Introduction.
Computerised Maintenance Management Systems
Object-Oriented Application Development Using VB.NET 1 Chapter 2 The Visual Studio.NET Development Environment.
Lecture Set 2 Part A: Creating an Application with Visual Studio – Solutions, Projects, Files 8/10/ :35 PM.
Introduction  Program: Set of sequence instruction that tell the computer what to do.  Software: A collection of programs, data, and information. 
Careers in SciVis Guilford County SciVis V
11 ADM2372 Management Information Systems (MIS) Chapter 10 – Part I Systems Development Chapter 10 – Part I Systems Development.
Software and Software Engineering By bscshelp.com software engineering 1.
Manage your projects efficiently and on a high level PROJECT MANAGEMENT SYSTEM Enovatio Projects Efficient project management Creating project plans Increasing.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
Innovative Engineering Solutions Providers
Operations Management Framework
CS4311 Spring 2011 Process Improvement Dr
Software Project Management
Oracle Database Administration
Building Information Systems
Chapter 2: Operating-System Structures
Software Project Management
Enron Energy Services Energy Management Outsourcing Overview
Across the entire value chain
Lesson 5 Computer-Related Issues
IE Job Description (Consulting, Government, Military)
FaciliWorks CMMS ®.
Database Administration
Proteus Product Demo.
Chapter 11: Printers IT Essentials v6.0 Chapter 11: Printers
Business Processes Associate Consultant - Supply Chain Planning - IBP
Presentation transcript:

OHM MRO/PM Solution & Improvement OHM OUTSOURCING MRO TASKS

OHM MRO Solution & Improvement The OHM MRO (Maintain-Repair-Operate) / P.M. (Preventive Maintenance) software was developed during the 90 s by OHM Ohana Engineers consultants in partnership with the I.M.I (Israel Military Industries). and it has implemented there since The OHM Civilian version was implemented (& debugged) in the last 10 years in Haifa chemicals Ind. and in another 5 manufactories. The OHM Software is a Magic 9 /MS Windows Application.

A brief review. Ohana Engineers (established in -1990) Our main clients are: Israeli Government - major consultant engineers (. e.g. Maintenance and Outsourcing. P.F.I or B.O.T method) Israeli Sea ports consultant engineers. (.e.g. Ashdod / Elat / Haifa) Israeli Military Industry. Israeli Municipal Center (.e.g. cities) OHM - Ohana engineers

ISO TQM OHM MRO Solution& improvement

MRO (maintain-repair-operate)& P.M Module Preventive& Predicted Maintenance General Projects& Tasks The Outsourcing Module Outsourcing managing & Agreements. Budgets & P.Orders managing ; Human Resources ; Contractors The Inventory Info Module Facility Equipment data; Graphic Archive; Inventory managing; Equipment, sub assemblies, spare parts. etc OHM MODULES

OHM Solution & Concepts EXAMPLE : (Question & Solution Chapter.1) How has the implementation of TQM & ISO influenced the degree of the manager's freedom, to operate In the last two decades?

"The equipment is a customer" The management and quality methodologies (TQM, ISO) implement the principle that the factory equipment is a customer. As a customer, the equipment has its own needs which are translated into hundreds of weekly J.O s (Job Orders). e.g. preventive maintenance (P.M), calibration, etc. J.Os I AM A CUSTOMER ! ISOTQM

The classic MRO software which computerized the process, turned the equipment into a computerized tasks generator that created hundreds of J.O's. J.O s which are dictated by the equipment s needs (P.M) rather than by any human factor (managers. etc) As a result of the above described process, in the last two decades the MRO manager lost many of his degrees of freedom to operate. The Equipment = J.Os generator

Resolution - Diagnosis and Prediction The OHM software was developed with built-in tools and solutions, which optimize and upgrade the MRO manager s degrees of freedom to operate. The Built-in outsourcing option Built-in Default J.O S. reports Dashboard console OHM SOLUTIONS (EXAMPLES) Upgrading degrees of freedom J.Os Freedom ? Inventory info Module

OHM was developed with a built-in option of outsource any task. You can Outsource Performing of one Job Order (J.O), up to all of the maintenance tasks. (which directed to outdoor contractors). The Outsourcing Built-in Option

The Outsourcing Agreements OHM Built-in option of outsourcing Agreements.

OHM MRO software includes a complete built-in encoded database and parameters with resolution down to the smallest data/parameter Resolution - diagnosis and prediction This resolution is an essential tool for diagnosis, prediction and tasks improvement. which in return expand the managers degrees of freedom to operate.

Factory equipment usually creates hundreds of weekly tasks (J.Os). Reporting these tasks can be quite time consuming. Built-in default J.O s. report EXAMPLE: Statistically, only 10% of the weekly maintenance tasks/J.Os are not executed exactly as planned.

OHM software supports Automatic default reports of tasks. This functionality allows the manager to focus only on the 10% of the tasks that werent executed as planned. Built-in default reports

Inventory Info Module Graphic. Archive

Inventory Info Module SPARE PARTS AND DYNASTY

the OHM screens and menus are arranged as a dashboard console. The manager can customize the menus/icons on his desktop according to any desired structure. Dashboard console screens

Thank You OHM Ohana engineers