Amtrak Fleet Strategy Plan Update 2011 Ken Uznanski Amtrak Policy and Development AASHTO Standing Committee on Rail Transportation 2011 Annual Meeting.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

Piedmont Improvement Program NC Society of Engineers
INVESTMENTS IN POWER SECTOR
Chapter 6. Competitive strategy: The analysis of strategic position
10-1 McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
County of Fairfax, Virginia Department of Transportation Proposed Transportation Funding Policy Changes Fairfax County Department of Transportation March.
Governor Jim Doyles Roadmap to Universal Access to Health Care for all Wisconsinites Even During Difficult Economic Times Jason A. Helgerson Wisconsin.
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
Smarter Travel Programmes– Financial impacts for Transport for London COLIN BUCHANAN
Tennessee Higher Education Commission Higher Education Recommendations & Finance Overview November 15, 2012.
1 Comments for Workshop on EEU Budget for August 6, 2008.
1 Income Eligible Re-Procurement Board of Early Education and Care January 14, 2009.
Debt Affordability Committee 1 Debt Affordability Committee August 15, 2013.
Please Sign In! IDOT requires verification that attendees arrived on time for the Vendor Conference. You will also be asked to sign out.
Watco Companies Overview January 25, 2013 Southwestern Rail Conference
How Reliability Impacts Shareholder Value Bruce Hawkins, CMRP Management Resources Group, Inc.
MA Metal Finishing Forum Tools and Techniques for Optimizing Metal Finishing Process/Environmental MA Metal Finishing Forum Kevin L. Klink, P.E.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
PULSE SURVEY The Incentive Industry Trends 2011 June 2011.
Greater Minnesota Transit Investment Plan PAC December 14, 2010.
NPC Future Transportation Fuels Study Vehicle Choice Time Horizons and Cost of Driving Metric June 22, 2012 DRAFT – DO NOT CITE OR QUOTE For NPC Study.
Bi-Level Car Procurement Status Report
Optimal pricing for sustainability of regulated infrastructure industries South African Economic Regulators Conference of 2012 Deon Joubert 21 August 2012.
Capacity Planning.
Product and Service Design
Capacity Planning For Products and Services
Strategic Capacity Planning for Products and Services
Copyright © Cengage Learning. All rights reserved. OPTIMIZING LOT SIZE AND HARVEST SIZE 3.5.
Transportation and Air Traveler Characteristics Findings from the 2011 Washington-Baltimore Regional Air Passenger Survey Transportation Planning Board.
Inven - Cost - 1Inventory Basic Valuation Methods.
Financial Planning and Forecasting Financial Statements
CHAPTER 1: UNDERSTANDING THE FINANCIAL PLANNING PROCESS.
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
How to commence the IT Modernization Process?
1 Operations Management, Competitiveness, and Operations Strategy Lecture 1.
Strategy Review Meeting Strategy Review Meeting
EPTTOLA: ETCS Perspective
COMPENSATION AND BENEFITS STUDY March 21, CONTENTS.
Chapter 12 Strategic Planning.
Fundamentals of Cost Analysis for Decision Making
Global Manufacturing and Materials Management
Federal Affordable Care Act Reforms of the Individual Insurance Market Senate Health Committee February 20, 2013 Deborah Reidy Kelch.
1 Revenue Update Jody M. Wagner Secretary of Finance Commonwealth of Virginia
Making Opportunity Affordable Grant
1. 2 Introduction Industry trends Engagement models Governance Innovation Case Study Summary & Wrap Up Agenda.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
Section 209 Activity Report September 12, 2011 Federal Railroad Administration.
Commuter Rail Vehicle Technology Analysis | 1 May 2007 Commuter Rail Vehicle Technology Analysis May, 2007.
Standardization Working Group Report
The BGA Apollo Clean Transportation Manufacturing Action Plan  Modern Transit  High Speed Rail  Clean Freight Movement  Make it in America!
Lessons Learned from World Bank Work on Assessment of Agricultural Lab Capacity Needs in Developing Countries John E. Lamb Agro-investment Strategy Advisor.
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Economic Impact of Medical Education Expansion in Nevada & Recommended Approach FUTURE 1.
Railroad 101 Equipment April 9, Next Generation Corridor Equipment Committee  Established by Section 305 of the Passenger Rail Investment and Improvement.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
High-Speed Intercity Passenger Rail Program March 14, 2011 Federal Railroad Administration.
PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010.
September 19 & 20, 2007 Items 4.11a,b, & c Tabs 15, 16, & 17 Proposition 1B Intercity Rail Bond Program.
Developing State-Amtrak Agreements Stephen Gardner Vice President, Policy and Development March 8, 2010.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
1 Transit Capacity Constraint Presented to: TPB Technical Committee April 1, 2005 Lora Byala Washington Metropolitan Area Transit Authority Office of Business.
Review of 2016–2021 Strategic Budget Plan Development Process and 2016 Budget Assumptions Financial Administration and Audit Committee April 14,
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
Review of 2018–2023 Strategic Budget Plan Development Process and
Amtrak Fleet Strategy Plan Update 2011 Ken Uznanski Amtrak Policy and Development AASHTO Standing Committee on Rail Transportation 2011 Annual Meeting.
Midwest Rolling Stock - Section 6 Plan
Presentation transcript:

Amtrak Fleet Strategy Plan Update 2011 Ken Uznanski Amtrak Policy and Development AASHTO Standing Committee on Rail Transportation 2011 Annual Meeting Charlotte, NC September 12, 2011

Amtrak Fleet Strategy Plan Initially Published February 2010 –Why a comprehensive fleet plan? –Intercity Passenger Rail in United States has unprecedented opportunity that must be addressed –Amtrak, as the nations passenger railroad, will play a vital role -Amtraks fleet is and will be at the heart of its ability to deliver competitive service, impacting all aspects of Amtrak services -History of underinvestment has constrained Amtraks ability to deliver modern and reliable services our customers deserve -Average age of equipment in the existing Amtrak Fleet is approaching 25 years -Essential need for recapitalization of the fleet to sustain and grow service -Continuing, predictable equipment replacement plan is needed to rebuild and stabilize supplier base Fleet Strategy Plan Update 2011 –Further refines and updates previous plan –Addresses new developments –Responds to feedback received from stakeholders

Fleet Strategy Plan Objectives Replace our aging fleet with modern equipment Buy equipment in a manner that will develop and support a viable manufacturing base and fleet –Orders of sufficient size to attract, develop and sustain a robust car building industry –Deliveries spread out over period of years, to allow for economical use of manufacturing plant, ease of incorporation into fleet –Allows us to debug issues on small batches of new equipment at the beginning of a production run Establish guidelines for the commercial life of new equipment Establish a foundation for continuing fleet plan update –Determinations of demand so that we can estimate costs, capacities, and fleet size –Numbers arent chiseled in stone – will change as the plan develops in response to changing economic and technical conditions Why is this such an urgent need?

Amtraks Diesel Locomotive Utilization Average annual miles 42,00044, , ,000 45,000 63,000 66,000 91,000

Amtrak Electric Locomotive Utilization Average annual miles

Amtraks Average Annual Car Miles – Highest in US Passenger Rail Commuters: Maintained nights, weekends, off-peak Amtrak: Operate 24x7, turnaround in 4 to 6 hours Amtrak Average annual miles (in thousands)

2011 Fleet Composition – Road Locomotives Equip TypeIn ServiceBuild YearAge in 2011Average Mileage Acela Power Cars years1.2 million AEM years3.5 million HHP years750,000 P-32 DM years1.4 million P years1.9 million P400* years1.8 million P years1.9 million F-59PHI years1.3 million *15 are being returned to service with ARRA funding Electric Diesel

2011 Fleet Composition - Cars Equip Type In Service Build YearAge in 2011Service Average Mileage Acela yearsNEC1.2 million Talgo yearsSD1.7 million Amfleet I yearsNEC/SD3.8 million Amfleet II yearsLD/SD5.1 million Superliner I249 § yearsLD5.5 million Superliner II yearsLD2.9 million Viewliner50 ± yearsLD2.5 million Horizon yearsSD2.4 million Metroliner yearsNECUnknown* Heritage yearsLDUnknown* *Mileage for equipment that predates Amtrak is unknown – but in some cases includes 20+ years of daily revenue service 55 will be returned to service with ARRA funding 5 will be returned to service with ARRA funding § 14 will be returned to service with ARRA funding + 6 will be returned to service with ARRA funding ± 1 will be returned to service with ARRA funding

Major Fleet Issues Age of equipment is at an all-time high: –Average Amtrak car is now older than the average car we inherited in 1971 –Heritage equipment is pushing (and in some cases past) sixty years Lack of homogeneity (multiple classes of equipment for short and long distance and corridor service) complicates maintenance –Complete standardization will never be possible – but we need to reduce the number of classes and mechanically distinct variants Sizes of equipment classes vary widely, and mass obsolescence is a problem Supply base is limited – lack of market demand led to market exit –Transit and commuter rail have taken attention of remaining manufacturers –Amtrak needs to take a lead, or: -Market will offer equipment not optimized for intercity service -Limited range of choices may lead to increased cost and risks -Industry may continue to atrophy

Major components of the 2010 Fleet Plan Set limits on maximum equipment age (lifing) –Need to retire 60 year old equipment –Need to determine useful life and commercial life -Useful life is the maximum period we want to have equipment in service – 30 years for engines, 40 years for passenger cars -Commercial life is the period when the equipment is maintainable, technically viable and commercially attractive for its designed service Estimate ridership demand in future years Develop assumptions for costs and production/purchase rates Include associated costs (acquisition, maintenance, etc.) Create demand for every type of equipment, and provide potential economies of scale and consistency for suppliers and state partners

Major components of the 2010 Fleet Plan (contd) Commercial life of equipment is set in plan; from years (depending on equipment type) Plan designed for 2% ridership growth on existing services – but procurement model allows us to easily expand order sizes based on –Requirements of new corridors (Sec 305 committee) –Large-scale growth beyond conservative levels Average cost is about $743 million per year Total anticipated cost in 2009 dollars will be –$11 billion through 2023 –$23 billion through 2040 –These costs include associated improvements to maintenance facilities, provision of spare parts, and provision of fleet overhaul services for the period Total fleet procurement over a 30 year period will include more than 2,500 cars and 700 locomotives, independent of needs for projected state-supported corridors and new services

Fleet PlanEquipment Life Policy Amtrak defined equipment life policy –Careful analysis of needs throughout the organization was performed -Marketing/Customer focus -Mechanical -Financial considerations –Commercial life goals for each fleet type developed for fleet recapitalization Commercial life goals: –Electric Locomotives - 25 years –Diesel Locomotives - 20 years –Single Level Coach - 30 years –Bi-Level Coach - 30 years –Tier I Trainset - 25 years –Tier II Trainset - 20 years Actual life of equipment will depend on tactical requirements

Amtrak Fleet Acquisition Plan Provides for a smoothed acquisition of high volume vehicle types Grouped acquisition of lower volume vehicle types Steady state procurement –Approximately 65 single level cars per year –Approximately 35 bi-level cars per year –70 electric locomotives under present procurement –Begin acquisition of 265 diesel locomotives at rate of 25 per year –Replace switcher fleet at rate of 10 per year Actual batch sizes and composition will be determined as necessary Coordination with PRIIA Section 305 –Baseline that is scalable to accommodate state needs

Florida-bound Silver Star at Seabrook, Maryland Heritage diner ( ) Heritage baggage car ( ) AEM-7 DC electric locomotive (1980) Viewliner sleeping cars ( ) Amfleet II coaches and lounge car ( ) A snapshot of the present Bob Pickering photo

A vision for the future Double the existing fleet by 2040 Maintenance of a younger fleet thereafter Acquisition and maintenance policies that support the projected age profile Work with states on equipment pool committee (Sec 305 of PRIIA) for additional acquisition needs A thriving railcar industry that supports our equipment needs

Current Amtrak Equipment Aquisitions Long Distance Single Level Program –130 car procurement awarded to CAF, USA in June 2010 –Will replace Heritage cars and bolster capacity of fleet –Deliveries begin October 2012 Electric Locomotives –Contract awarded to Siemens Transportation for 70 new electric locomotives in September 2010 –Replaces all electric locomotives on NEC with single type –First locomotive for testing to be delivered December 2012

17 Fleet Strategy Plan Update Fleet Strategy Plan is to be updated on an annual basis Previous plan was issued in February 2010 The update is an evolutionary rather than revolutionary one Much of the plan is unchanged Updates are provided where circumstances have moved on External feedback has been added to internal updates The new plan brings all of this together

18 Summary of the 2010 Fleet Strategy Plan Assumed growth of 2% per annum across the fleet Long term acquisition of approximately 65 single level cars per year Long term acquisition of approximately 35 bi-level cars per year Expansion of the electric locomotive order to 70 locomotives Commencement of acquisition of diesel locomotives Review the proposed expansion options for Acela Long term plan for acquisition of Acela replacement Funding requirements include equipment, project management (5%), spares and maintenance infrastructure upgrades 30 year time horizon for the fleet strategy plan

19 Feedback from the 2010 Fleet Strategy Plan Briefings were provided to industry groups and political staffers External interests provided comments directly OIG Review Comments received included: –The 2% growth assumptions are not sufficient –Bi-level vehicle introduction would be cost beneficial –Life assumptions are too short –Demand level is too small for industry to be competitive –Where will the funding come from?

20 What has Changed for 2011? Aligned the plan to fiscal rather than calendar years Address LDSL and electric locomotive orders that have been placed Update the funding requirements based on actual costs incurred Acela –Include the 40 additional cars for the Acela fleet (2 per trainset) –Add the additional Acela II trainsets proposed for service doubling in 2017 in parallel with the planned growth of NEC Regional service –Replacement of Acela pushed out 1-3 years based on financing constraints and to gain maximum benefit of the planned investments Re-profiled the delivery schedules based on Section 305 NGEC specification developments with the states Realigned the Amfleet II and Amfleet I replacements Provided for the potential introduction of bi-level corridor cars in the Midwest

21 How Do the Changes Address Feedback from 2010? The baseline assumptions have not changed –2% is well below recent growth levels –It is hard to argue with the base case as being too ambitious –The fleet plan is scalable once it is implemented –Higher levels of demand are not justified by the current projections Bi-Level car types are introduced as a potential for the Midwest. NEC is less likely but will be reviewed further Life assumptions are unchanged. Analysis of life cycle costs suggests they are actually conservative. Amtraks demand is insufficient to sustain the domestic car building industry alone and this cannot change that situation Funding is assumed in this plan. If funding is not available, the plan will not be implemented

22 Fleet Strategy Plan Update Equipment Requirements Years 1 to 15 –904 single level cars –420 bi-level cars –70 electric locomotives –280 diesel locomotives –40 high speed trainsets and 40 additional cars for the existing trainsets –Total acquisition cost (FY11 values) $12.3bn Years –592 single level cars –511 bi-level cars –70 electric locomotives –300 diesel locomotives –40 high speed trainsets –Total acquisition cost (FY11) values $12.7bn

23 What is not in the 2011 Plan Update? Very high speed equipment for the minimum operating segment between NYC and PHL is discussed but not quantified State equipment needs funded through HSIPR grants Any infrastructure issues outside maintenance facilities, e.g. stations, track condition, power supplies, catenary. –Upgrades necessary to improve performance of the existing equipment –Enhancements necessary to accommodate a growth in the service from additional equipment New maintenance facilities or significant expansion of facilities for additional capacity are not included –Upgrade to the current facilities for new equipment is included –Infrastructure upgrades are not optional when acquiring equipment Capacity growth above the 2% projection. –Actual growth is above 2% and has average that for a number of years –Additional equipment to meet that growth can be accommodated through scaling of the core plan but will require additional capital funding

24 Future Fleet Strategy Plan Updates Future Fleet Strategy Plan Updates will likely include: –Further Refinement of Assumptions and Costs –Traditional Single Car consists and merits of Integrated (fixed consist) Trainsets –Opportunities provided by state/multi-state procurements –Integration of PRIIA Section 305 Specifications and potential partnerships –Refinement of Maintenance Facility needs –Very High Speed Rail Development