Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
NCATS REDESIGN METHODOLOGY A Menu of Redesign Options Six Models for Course Redesign Five Principles of Successful Course Redesign Four Models for Assessing.
UNITED NATIONS Shipment Details Report – January 2006.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
RECORD KEEPING Cooperative Development of Operational
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Making the System Operational
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Georgia has Led the Nation for 3 Consecutive Years.
EMS Checklist (ISO model)
Case Management Techniques
Effectively applying ISO9001:2000 clauses 6 and 7.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
Page 1 of 30 To the Create Assignment Request Online Training Course An assignment request is created by an assignor to initiate the electronic assignment.
ABC Technology Project
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
1 Contract Inactivation & Replacement Fly-in Action ( Continue to Page Down/Click on each page…) Electronic Document Access (EDA)
Chapter 11: The X Window System Guide To UNIX Using Linux Third Edition.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Checking & Corrective Action
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
©2007 First Wave Consulting, LLC A better way to do business. Period This is definitely NOT your father’s standard operating procedure.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Page 1 of 43 To the ETS – Bidding Query by Map Online Training Course Welcome This training module provides the procedures for using Query by Map for a.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Functional Areas & Positions
DB analyzer utility An overview 1. DB Analyzer An application used to track discrepancies and other reports in Sanchay Post Constantly updated by SDC.
How creating a course on the e-lastic platform 1.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Presentation transcript:

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13

Pre-Hot Checkout: Goal 2 The overarching goal... to establish that the CEBAF accelerator systems are in a state to support safe and effective operations during the HCO and beam commissioning tasks.

Pre-Hot Checkout: Timeline 3 Layered Approach Inspections (ongoing) System Reviews (June / July / August) Geographic Reviews (August / September) 3

4 Accelerator System Changes Songsheets CEBAF beamline element drawings

5 Accelerator System Changes 6GeV CEBAF elements removed

6 Accelerator System Changes 12GeV CEBAF elements installed

Pre-Hot Checkout 3-Layered Approach 7 Inspections –Field assessments –Identify issues –Track resolutions System Readiness Reviews –System status and operational limitations, checklists, preventive maintenance plans, spare parts status... Geographic Reviews –Cross-cutting readiness –System of Systems evaluation

Pre-Hot Checkout 3-Layered Approach 8

Layer 1 - Inspections 9 Evaluation of equipment readiness. Q/A punchlists –On-line database for tracking. Consistency checks between the Accelerator Song Sheets and the tunnel hardware. –Changes routed back to Engineering for correction.

Layer 1 - Inspections - Workmanship Punchlist of items needing attention. April 10,

Layer 1 - Inspections - Workmanship 11 Web based accounting. Operability Manager tracks to resolution.

Layer 1 - Inspections - Consistency 12 Song Sheet Checks Hard copies of beamline element layout taken to the field and marked up during the inspection. Clean copy made. Engineering issues ECO and revised Song Sheets.

Layer 2 – System Readiness 13

Layer 2 - System Readiness Reviews 14 System Readiness Reviews demonstrate –System Capability Safe & effective support for HCO –System Readiness System status, spares status, maintenance plans –Documentation New 12GeV equipment –Long Term Operations Plans for 20 years of CEBAF operations –HCO Checklists Status update and development plan for completing prior to HCO System Review results go to the Director of Operations

Layer 2 - System Readiness: ABIL ABIL (Accelerator Bypassed-Interlock Log) is a new system (policy, process, software) that defines the requirements for bypassing system interlocks. A new database was created to track bypassed interlocks. –It replaces an outdated and under-utilized system. A new Interlock Bypassed tag was created and distributed. –Attach one tag to the equipment for each bypassed interlock. Training (SAF144) is required for employees working with systems that may install interlock bypasses. The policy does not apply to Personal Safety System equipment. 15

Layer 2 - System Readiness: ABIL 16 ABIL: Interlock Bypassed Tags

Layer 3 – Geographic Readiness 17

Layer 3 - Geographic Reviews 18 Cross cutting readiness evaluation by location –CEBAF as a System of Systems Song Sheet completeness –Final field checks CEBAF Element Database (CED) completeness –One for one correlation of components to the CED Control Screen completeness –Screens and controls available to operate CEBAF Geographic Review results go to the Director of Operations

Geographic Reviews 19 Review Committee –Broad knowledge base from Accelerator Operations, Software, Engineering, and Accelerator Physics –Many of the principle people involved in developing and carrying out the commissioning plan.

Pre-Hot Checkout - Summary Pre-Hot Checkout will establish that CEBAF systems can support safe and effective operations during Hot Checkout and Beam Commissioning 20 3 Layered Approach –Inspections –System Reviews –Geographic Reviews

Appendix 21

12GeV Construction Overview Work process during the Long Shutdown paralleled 6GeV era work process Meetings held daily during the week Tools in place to guide work –Daily summaries –Work Plan of the Day (ATLis Work Map) –Long Range Plan shown daily (SAD Calendar) Tasks are planned, approved, documented, and communicated via the Accelerator Task List (ATLis) 22

23 12GeV Construction Execution Daily reports from previous 24 hours presented by the Program Deputy during the 0800 Morning Meeting. Progress and problems are reported. Posted in an electronic logbook as a historic representation of work performed.

24 12GeV Construction Execution ALTis Work Map provides a graphical representation of work plan of the day and is maintained by the Program Deputy and presented at the 0800 Morning Meeting.

25 12GeV Construction Execution The SAD Calendar (Scheduled Accelerator Down) provides a longer range look at planned work. Links to the ATLis tasks make for quick access to documentation for work including Hazard Identification, engineering documents, comments, approval, and job details.

26 12GeV Construction Execution The Accelerator Task List (ATLis) provides a web-based work planning tool that documents safety considerations, approval process, ties to additional documentation such as permits, drawings, files, photos, etc.

Pre-HCO: System Readiness Reviews 27 Facilities, Management and Logistics (FML) 6/20/13 Cryogenics 6/27/13 Safety Systems / Radcon 7/11/13 Software 7/18/13 Transport 7/25/13 Diagnostics, Instrumentation and Controls 8/1/13 Acceleration 8/8/13

System Readiness Reviews 28 Details from CEBAF Systems Readiness Review Process for 12GeV Commissioning

System Readiness - ABIL 29

30 August 2, 2012 SE Recombiner. All magnets removed for rebuild. New top and baseplates installed. Geographic Reviews May 30, 2013 All magnets and beampipe installed.

System Readiness 31 May 18, 2012 Empty Linac slots from 4GeV CEBAF May 21, 2013 Installed C100 Cryomodules in support of 12GeV CEBAF