November 9, 2016 Request for an After-the-Fact Major Variance from the Neuse Riparian Area Protection Rule Belinda Keever 8005 Falling Leaf Court, Raleigh,

Slides:



Advertisements
Similar presentations
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Advertisements

Private Boat Ramp Permit Application Harold Mills District 1 September 23, 2014 Environmental Protection Division Environmental Protection Division.
Board of Standards and Appeals Community Board 3 / Manhattan June 13, 2011 Introduction Introduction Applications: Applications: –Variances –Special Permits.
BCC PUBLIC HEARING ON BZA #VA , OCTOBER 3, 2013 APPLICANT: YURI FERRO APPELLANT: WILLIAM A DAVIS, SR. and REBECCA M. DAVIS Orange County Zoning.
PRELIMINARY SUBDIVISION PLAN. Keene’s Pointe 1068 Homes /- Residents 5 Parks with amenities 1 Community Boat Ramp 15 Miles of Roadway 2 Entrances.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Toll FL Limited Partnership District 1 August 4, 2015 Environmental Protection.
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Isles of Lake Hancock Homeowners Association, Inc. District 1 July 28, 2015.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Public Hearing February 26, Case:CDR Project:Beck/Overstreet Planned Development / Land Use Plan (PD/LUP) - Substantial Change Applicant:Kevin.
Green Infrastructure Network Design Analysis Beaufort County, North Carolina.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Appeal to the Recommendation of the Environmental Protection Commission John Jakes February 23, 2010 Environmental Protection Division Environmental Protection.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
BCC PUBLIC HEARING ON BZA #VA , MARCH 6, 2014 APPLICANT/APPELLANT: CHERYL SINKOWITZ BCC PUBLIC HEARING ON BZA #VA , MARCH 6, 2014 APPLICANT/APPELLANT:
Conservation Area Impact Permit Modification and Transfer Request DFD ONE, LLC Environmental Protection Division September 22, 2015.
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
Community Development Department Variance Length of Dock Roof 2 Cardinal Court.
November 11, 2008 BCC PUBLIC HEARING ON BZA #SE , September 4, 2008 APPLICANT/APPELLANT: Christian Haitian Church, Inc.
City of Talent VAR Suncrest Homes Planning Commission October 22, 2015.
Appeal to the Decision of the Environmental Protection Commission Mark Kassar November 11, 2008 Environmental Protection Division Environmental Protection.
Gaston Wood Processing Facility Special Exception ZOX
Semi-Private Boat Ramp Facility and Conservation Area Impact Permit Requests Independence Community Association, Inc. Environmental Protection Division.
After-the-Fact Conservation Area Impact Permit Request* Keene’s Pointe Community Association, Inc. District 1 November 1, 2011 *Postponed from the December.
Community Development Department APPLICATION 2922 VARIANCE TO REDUCE LANDSCAPE BUFFER.
 Consolidated Buffer Mitigation Rule 15A NCAC 02B.0295 January 7, 2015.
Somerset Village Playground KEENE’S POINTE CAMDEN TOT LOT Lake Burden Playground Bedford Village Playground Community Activity Area Proposed Camden Village.
Request for a Major Variance from the Neuse Riparian Area Protection Rules LBJ/Cary Associates, LLC Daycare facility Cary, NC January 8, 2014.
May 13, Site - USGS Topo SITE Source: 2013 Oriental USGS 7.5-minute Topographic Map.
Community Development Department Variance to 20 ft. Street Side Setback 1 Windsor Place APP. NO Variance to 20 ft. Street Side Setback 1 Windsor.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4 June 9, 2009 Environmental Protection Division Environmental Protection.
Barksdale Variance Application No. VR-SBK Application Request  Variance of 1'8" from the rear setback requirement for a swimming pool with a screen.
Applicant: Robert Ganem Addresses: 7304 & 7312 Black Oak Lane Planning Commission Meeting – August 21, 2015.
BOR Real Property Conveyances and Restrictions Anita Bain, Director Natural Resource Management Division August 18, 2006 Anita Bain, Director Natural.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
Longhorn Steakhouse Variance Request Applicant has requested a variance to the Land Development Code watershed regulation that restricts impervious cover.
Washoe County Board of Adjustment
Butte County Board of Supervisors December 6, 2016
Washoe County Board of Adjustment
City Council Meeting October 23, 2017
Canyons Golf Hole 12 Comfort Station Special Exception
Arsenic Acceptable Ambient Level Revision
May 12, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
March 9, 2016 Request for a Major Variance from the Neuse Riparian Area Protection Rule R L Properties, LLC Parkway Pointe Office Park - Lot 5 Center.
Request for a Major Variance from the Neuse Riparian Area Protection Rules    Novo Nordisk Pharmaceuticals, Inc Powhatan Road Clayton, NC July.
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Ernest Floyd Foster Foster Seafood 70 Captain Tom’s.
VR-SBK Rear Yard Setback 2 Felshire Lane Medeiros Property
May 11, 2016 Study of the State’s Riparian Buffer Protection Program Pursuant to SL Karen Higgins, Division of Water Resources.
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Harshavardhan Tummalpally 5201 Trinity Road Raleigh, NC January.
Request for a Major Variance from the Randleman Lake Water Supply Watershed Riparian Area Protection Rules    Blue Diamond Investment Company, LLC Kernersville.
Request for an After-the-Fact Major Variance from the Tar-Pamlico Riparian Area Protection Rules    Mohamed Ali and Reem Darar 734 Old Pamlico Beach Road.
Request for a Major Variance from the Randleman Lake Water Supply Watershed Riparian Area Protection Rules    Blue Diamond Investment Company, LLC Kernersville.
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Department of Environmental Quality
May 10, 2017 Request for a Major Variance from the Tar-Pamlico Riparian Area Protection Rule Peter Warlick 74 Northpoint Road, Ocracoke.
Special Exception to Reduce the Required Front Yard Setback for
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Jeffrey Gunter 7701 Greentree Court Raleigh, NC March 12, 2014.
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    LBJ/Cary Associates, LLC Daycare facility Cary, NC Karen Higgins.
WSUP (Lightning W Tank #2)
Washoe County Board of Adjustment
WSUP The Club at ArrowCreek Grading
Washoe County Board of Adjustment April 6, 2017
Environmental Protection Division
12 A: 113 Crestview Circle Variance Request City Council June 18, 2018
12 D. Variance Request – 211 Jennifer Lane
Washoe County Board of Adjustment June 6, 2019
Presentation transcript:

November 9, 2016 Request for an After-the-Fact Major Variance from the Neuse Riparian Area Protection Rule Belinda Keever 8005 Falling Leaf Court, Raleigh, NC

Site – USGS Topographic/Soil Survey Map Department of Environmental Quality

Site Setting Department of Environmental Quality

Project History Lot with existing home purchased through an estate transfer on March 26, 2015 Existing home constructed with deck partially within in Zone 2 prior to rule Applicant installed pool and partially constructed a deck before being notified by Division staff that it was in violation of the Neuse Riparian Buffer Rule Since this is an after-the-fact permit, I want to first review the project history. Mr. Whitford originally purchased the lot in 2013 for a retirement home. The lot is located adjacent to Mr. Whitford’s sister’s lot. In 2013, the health department allowed drain lines to be installed for the existing septic system. Mr. Whitford contacted the Beaufort County Building Inspector’s office to determine if a building permit was required to construct a shelter. The county building inspector informed Mr. Whitford that a building permit was not required and did not indicate that the structure could not be located with the protected buffer. Mr. Whitford built the shelter in time for their family’s reunion in 2014 and constructed the storage shed later that same year. Division staff issued a Notice of Violation on September 9, 2015 when they discovered that the structures were constructed in the protected buffer. Department of Environmental Quality

Lot

STREAMS Site Plan ZONE 1 ZONE 2

Proposed Impacts & Mitigation Reason for Impact Buffer Mitigation Required Zone 1 Impact (square feet) Zone 2 Impact Pool & Deck Yes 644 569 Zone Total Impact (square feet) Multiplier Required Mitigation Zone 1 644 3 1,932 Zone 2 569 1.5 853.50 Total Buffer Mitigation Required 2,785.50 Mitigation Proposal: Purchase buffer credits from private mitigation bank

Findings of Fact - (9)(a)(i) Practical difficulties or unnecessary hardships are present: Applicants cannot make reasonable use of property to install a pool and deck for grandchild with special needs Hardship from application of this Rule Hardship is due to the physical nature of the property Applicant unknowingly violated the rule Purchased property after the effective date of the rule Buffer encumbering approximately 90 percent of backyard is unique to applicant’s property

Findings of Fact - (9)(a)(ii) & (iii) The variance is in harmony with the general purpose and intent of the State’s riparian buffer protection requirements and preserves its spirit In granting the variance, the public safety and welfare have been assured, water quality has been protected, and substantial justice has been done. Propose to purchase 2,785.50 buffer mitigation credits

DWR Recommendation DWR recommendation is that the Water Quality Committee grant this major variance request. If the Water Quality Committee approves this request, the Division recommends approval with the following conditions or stipulations: Mitigation The applicant shall provide mitigation for the proposed impacts by purchasing 2785.50 buffer credits from Resource Environmental Solutions, LLC banks located within HUC 03020201 as indicated in their application.

Questions?