Test Beam Measurements october – november, 2016

Slides:



Advertisements
Similar presentations
QUAD MODULE TESTING 18 th January 2013 Kate Doonan University of Glasgow.
Advertisements

Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Standalone VeloPix Simulation Jianchun Wang 4/30/10.
Testbeam 2010 with CAPTAN System Jianchun Wang Syracuse University.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
15 Dec 2010 CERN Sept 2010 beam test: Sensor response study Chris Walmsley and Sam Leveridge (presented by Paul Dauncey) 1Paul Dauncey.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
VTT ASSEMBLY 5 CHARACTERISATION KATE DOONAN & RICHARD BATES 2012.
11 Wish list for July May testbeam Keep It (Stupidly) Simple..
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Testbeam Studies of the LHCb Vertex Locator Modules Lisa Dwyer.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
LEPSI ir e s MIMOSA 13 Minimum Ionising particle Metal Oxyde Semi-conductor Active pixel sensor GSI Meeting, Darmstadt Sébastien HEINI 10/03/2005.
CEA DSM Irfu 20 th october 2008 EuDet Annual Meeting Marie GELIN on behalf of IRFU – Saclay and IPHC - Strasbourg Zero Suppressed Digital Chip sensor for.
Preliminary results with the Alibava Telescope G. Casse, S. Martì, J. Rodriguez, I. Tsurin and the Alibava collaboration 1 G. Casse,20th RD50 Workshop,
J. Crooks STFC Rutherford Appleton Laboratory
August 26, 2003P. Nilsson, SPD Group Meeting1 Paul Nilsson, SPD Group Meeting, August 26, 2003 Test Beam 2002 Analysis Techniques for Estimating Intrinsic.
Test of the MAPS add-on board S. Amar-Youcef, M. Deveaux, D. Doering, C. Müntz, S. Seddiki, P. Scharrer, Ch. Schrader, J. Stroth, T. Tischler.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Kevin Nash MaPSA-Light test system 1. The System 2.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
-1-CERN (11/24/2010)P. Valerio Noise performances of MAPS and Hybrid Detector technology Pierpaolo Valerio.
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1: Pixel Telescope Test Beam Campaigns Pixel Telescope: Status Demonstrator Testbeam 1 (DESY) Testbeam 2 (DESY)
Status of 2009 Testbeam Paper and testbeam analyses Testbeam paper (2009) Some news from
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Pixel Sensors for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Further improvement of the TC performances Marie GELIN on behalf of IPHC - Strasbourg and IRFU – Saclay Investigation of a new substrate (High Resistivity)
Munich framework/DAQ meeting, Feb 2011 Peter Kvasnicka, CU Prague: PXD digitization 1 CU Prague Tadeáš Bílka, Peter Kvasnička, Peter Kodyš, Jozef.
Combined, Mized and ZS data analysis
USBPix Readout System using FE-I4/A Chip Status Update: ToT calibration and Finalization of Tuning Procedure Jimin Kim and Austin Piehl Department of Physics.
Analysis of LumiCal data from the 2010 testbeam
Status of EUTelescope EUDET Annual Meeting – Paris – 8/10 October 2007
EUTelescope Testbeam Analysis: Summer 2014
Digital readout architecture for Velopix
Spatial Resolution of DEPFET Matrices
Marcin Chrząszcz Cracow University of Technology Itamar Levy
Huagen Xu IKP: T. Randriamalala, J. Ritman and T. Stockmanns
Beam Gas Vertex – Beam monitor
The Status of the Data Analysis of the Beam Test at FZJ
HV-MAPS Designs and Results I
Bonn Test Station data analysis with PandaRoot
Tun Sheng Tan AUGUST UW Analysis Meeting Summer 2014
Integration and alignment of ATLAS SCT
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
Timepix for the AIDA Telescope
AIDA Alignment Package
TCAD Simulation and test setup For CMOS Pixel Sensor based on a 0
Beam Test Results for the CMS Forward Pixel Detector
R&D of CMOS pixel Shandong University
DESY test beam report: March 2019
Presentation transcript:

Test Beam Measurements october – november, 2016 D. Hohov1,2, A. Lounis1,2 , C. Nellist1, T. Rashid1,2 1. Laboratoire de L'accélérateur Linéaire Université Paris-SUD XI ATLAS Group meeting 05.12.2016

Test Beam Measurements Outline The samples Clean room characterization and tunings Test Beam setup Reconstruction results Conclusions 23.11.2018 Test Beam Measurements

Test Beam Measurements The samples (DUTs) Testbeam studies are carried out to characterise a novel sensor or read-out chip, the so-called device under test (DUT). Time over Threshold For the tests we had two FE-I4 modules: Module name Details Bias voltage Threshold 7 ToT @ DUT 0 NP150-6-1A 150um 80 V 50 V 1600 e 10 ke DUT 1 NP100-7-2A 100um 7 ke 23.11.2018 Test Beam Measurements

Clean room characterization Analog scan Digital scan DUT 1 DUT 2 DUT 1 DUT 2 23.11.2018 Test Beam Measurements

Clean room characterization Threshold tunings : 1600 e for both Tuning 100 um: 7 Tot at 7000 e 150 um: 7 Tot at 10000 e TOT tunings : Threshold and Noise scans DUT 0 (150 um) DUT 1 (100 um) 23.11.2018 Test Beam Measurements

Test Beam Measurements Test Beam Setup Test beam allows the pixel modules to be tested in an environment similar to that which they will be exposed to within the ATLAS detector to determine how well they function. H6A 23.11.2018 Test Beam Measurements

Test Beam Measurements Test Beam Setup The sensitive elements of the telescope planes are Mimosa26 active pixel sensors with a pixel pitch of 18.4 µm. Each plane consists of 1152 x 576 pixels covering an active area of 21.2 x 10.6 mm2 Trigger Logic Unit provides trigger logic and time stamp information on particle passage 23.11.2018 Test Beam Measurements

Test Beam Measurements Test Beam Setup - Readout with RCE system. Pixel interface 23.11.2018 Test Beam Measurements

Test Beam Measurements Data Reconstruction The raw data has to be reconstructed into the tracks for further analysis EUTelescope software is developed hand in hand with the AIDA pixel telescope and its DAQ framework EUDAQ There are five steps for the reconstruction: Data conversion data is converted from its raw data format into an LCIO (Linear Collider I/O) raw data collection as well as noisy pixels being determined Cluster finding This step is followed by grouping together hit pixels to clusters. These clusters can then be masked and removed if noisy pixels are present in them. 23.11.2018 Test Beam Measurements

Test Beam Measurements Data Reconstruction Hit derivation The cluster coordinates are initially given only in the local sensor frame in terms of column and row numbers. The transformation from the local (sensor) frame into the global (telescope) frame is done via the telescope description stored in the geometry steering files. From cluster objects actual hit positions can be derived. As in this step hit positions are available, it is possible to use correlation of such hits on different sensors to obtain a prealignment. Alignment In the alignment step, the prealignment together with the derived hits are used to align the setup with an external alignment tools Pattern recognition and track fitting In the final step, track finding and fitting, the pre and final alignment are applied to the hits and tracks are derived from these hits. 23.11.2018 Test Beam Measurements

Test Beam Measurements Test Beam Results 1) Lvl 1 plots (The Lvl1 plots for (left) DUT 0, (right) DUT 1 at 80V. ) The LVL1 distribution shows the arrival time of every recorded hit with respect to the external trigger signal (14 time windows of 25 ns). 2) Cluster size 23.11.2018 Test Beam Measurements

Test Beam Measurements Test Beam Results 3) Correlations For the telescope planes For DUTs planes 23.11.2018 Test Beam Measurements

Test Beam Measurements Test Beam Results 4) Residuals 5) Hitmaps 23.11.2018 Test Beam Measurements

Summary and Conclusions Two samples have been measured at test beam. One of them has incomplete statistics. Further work on the reconstruction is required. After reconstruction of all runs, the output ROOT files produced during track reconstruction, analyse with Tbmon (TBmon is a small analysis framework used to study data taken with silicon pixel sensors in a test beam ). Measurements at the next test beam to complete characterization. Thank you for your attention! 23.11.2018 Test Beam Measurements