Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Questions about AVR & PSS
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Kenneth Wilson WECC Staff
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Compliance Assurance and Title V Monitoring A Summary of the Rules and Applications Peter Westlin, EPA, OAQPS.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Compliance Assurance and Title V Monitoring A Summary of Rules and Permitting Issues Peter Westlin, EPA, OAQPS.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Project – Alignment of Terms WECC Joint Meeting July 15, 2015.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Standards Review Subcommittee Update August 17, 2010.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Distributed Generation Registration June 30, 2008.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Real Property Policy Update Planning and Development Committee August 4, 2015.
Retail Metering Working Group Progress Report 08/15/07.
CAP169 BSSG 12/03/09. 2 Today  Recap on developments to date  Discuss and agree Terms of Reference for the group  Begin to work through proposal, capturing:
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Stages of Research and Development
NERC Reliability Readiness The Next Steps
GC0104 – Demand Connection Code (DCC)
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Rachel Coyne Manager, Reliability Standards Program
COM Operating Personnel Communications Protocols
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Modifications to Planning Charter
WECC Regional Standards Update
CIIMS Proposal for TOP-003 Approach
Implementation Strategy July 2002
Project WECC-0100 Update Load Modeling Task Force
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Alignment of Part 4B with ISAE 3000
Background (history, process to date) Status of CANs
GMD Data Request NERC Rules of Procedure Section 1600
Canadian Navigable Waters Act
Reliability Standards Development Plan
Integration of Variable Generation Task Force (IVGTF): Status
Coordinate Operations Standard
TBT Agreement : Key Principles
The Process for Final Approval: Remediation
Controlling Project Cost and Schedule
Project Definition of Bulk Electric System
NERC Reliability Standards Development Plan
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Integration of Variable Generation Task Force (IVGTF)
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
NERC Reliability Standards Development Plan
Project WECC-0100 Update Load Modeling Task Force
Status of Exceptional Events Implementation Guidance
Presentation transcript:

Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair Project 2010-17 Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair

Topics Standard Drafting Team (SDT) Accomplishments 1st Posting for Formal Comments Bulk Electric System (BES) Definition Significant Revisions Technical Principles Concepts Bulk Electric System Rules of Procedure (BESROP) Update Short-term Project Milestones

SDT Accomplishments/Planned Activities Industry-Wide Joint BES/ROP Webinar (May, 2011) SDT Activities Meetings Conference Calls Future Meetings Industry-Wide Joint BES/ROP Webinar (Concurrent Posting)

1st Posting for Formal Comments BES Definition Comments from 279 different people from 213 companies representing 10 of the 10 Industry Segments

BES Definition Significant Revisions Exclusion of Local Distribution Facilities Generation Threshold Values Local Networks (High Voltage Limit) Reactive Resources 5

Exclusion of Local Distribution Facilities Core Definition Bulk Electric System (BES): Unless modified by the lists shown below, all Transmission Elements operated at 100 kV or higher and Real Power and Reactive Power resources connected at 100 kV or higher. This does not include facilities used in the local distribution of electric energy as established by applicable regulatory authorities. 6

Generation Threshold Values BES Designation Criteria BES Designation Criteria Inclusions: I2 - Generating resource(s) located at a single site with aggregate capacity greater than 75 MVA (gross aggregate nameplate rating) including the generator terminals through the high-side of the generator step-up transformer(s) connected at a voltage of 100 kV or above.

Local Networks (High Voltage Limit) BES Designation Criteria BES Designation Criteria Exclusions: E3 - Local Networks (LN): A group of contiguous Elements operated at or above 100 kV but less than 300 kV that distribute power to Load rather than transfer bulk power across the Interconnected System. LN’s emanate from multiple points of connection at 100 kV or higher to improve the level of service to retail customer Load and not to accommodate bulk transfer across the interconnected system.

BES Designation Criteria Reactive Resources BES Designation Criteria BES Designation Criteria Inclusion: I5 –Static or dynamic devices dedicated to supplying or absorbing Reactive Power that are connected at 100 kV or higher, or through a dedicated transformer with a high-side voltage of 100 kV or higher, or through a transformer that is designated in Inclusion I1.

BES Designation Criteria Reactive Resources BES Designation Criteria BES Designation Criteria Exclusion: E4 – Reactive Power devices owned and operated by the retail customer solely for their own use.

1st Posting for Formal Comments Exception Process Technical Principles Comments from 75 different people from 45 companies representing 8 of the 10 Industry Segments

Exception Process Technical Principles Reliability benefits of an Element cannot be determined by a single study or analysis of a single parameter. Not feasible to establish continent-wide values and/or limits.

Exception Process Technical Principles The SDT has adopted a new approach: Targeted questions for Transmission and Generation addressing the Facility characteristics with guidance on the type of supporting evidence to accompany request. No hard numbers to guide the evaluation of the request. Engineering judgment will be utilized by common Regional panels to perform the evaluation of the evidence in an open, repeatable and transparent process.

DRAFT BES Rules of Procedure Process Objectives BES Exceptions (linked to BES Definition Designation Criteria) ROP Process spells out: Who to file a request with When to file a request and expect a response How to file a request and what to include Who decides based on technical justification How consistency is assured

BES Rules of Procedure Team Update The Rules of Procedure Team produced a draft procedure document that would be incorporated as an appendix to the Rules of Procedure This procedure document was posted for an informal 30-day comment period to obtain industry input ending June 10th.

Industry Input The posted Rules of Procedure exceptions process received comments from 176 different people from 131 companies across all 10 industry segments in Canada and the US. There is strong support for a bright-line definition with an associated exception process.

Industry Input There is a strong desire for a process that is more efficient than the one presented in the draft in two aspects: 1) greater clarity in the process and timelines for process steps, and 2) help in determining the status of an element by application of the definition. The ROP team is considering the comments received and will produce a proposed amendment to the Rules of Procedure for a 45-day formal comment period concurrent with the posting of the BES definition in early September.   A significant number of comments indicated the need for an informal method for addressing questions regarding the application of the definition and do not see the formal exceptions process as efficient in satisfying that need. This is probably outside the scope of the Rules of Procedure, but it should be a component of the programs developed by NERC and regions to support the process. Also there was a desire for greater clarity in the process steps and timelines. Additionally, there were Canadian concerns raised with respect to some language regarding approval and authority of the Rules of Procedure. The team believes this is a language issue that can be resolved and not a technical barrier. There were some state utility commission concerns with increased costs to consumers in how elements are viewed with respect to compliance as they progress through the exception process. Again, the team believes this is a communication and clarity issue and not a technical barrier.

Near-term Project Milestones Concurrent Posting Periods (Sept./Oct. 2011) Revised BES definition with exception criteria (inclusions and exclusions) BES Definition Exception Process Technical Principles to support request for BES Definition Exception Industry Webinar

Question & Answer Website: http://www.nerc.com/filez/standards/Project2010-17_BES.html